Evaluasi Kinerja Perbaikan Tanah Lunak menggunakan Instrument Geoteknik pada Pembangunan Kawasan Kota Summarecon Bandung Area Cluster Amanda dan Btari Dengan Penggunaan Preloading Dan Prefabricated Vertical Drain (PVD)

Lilabsari, Zahra Febrina (2018) Evaluasi Kinerja Perbaikan Tanah Lunak menggunakan Instrument Geoteknik pada Pembangunan Kawasan Kota Summarecon Bandung Area Cluster Amanda dan Btari Dengan Penggunaan Preloading Dan Prefabricated Vertical Drain (PVD). Sarjana thesis, Universitas Brawijaya.

Abstract

Penurunan konsolidasi tanah merupakan masalah geoteknik yang sering ditemukan pada kasus timbunan pada tanah lunak. Oleh karenanya digunakanlah teknik Preloading dan Prefabricated Vertical Drain (PVD) untuk mempercepat penurunan konsolidasi. Permasalahan yang sering timbul pada penggunaan Preloading dan Prefabricated Vertical Drain (PVD) adalah kegagalan desain yang menyebabkan waktu konsolidasi tidak berjalan sesuai rencana. Agar metode perbaikan tanah yang digunakan mempunyai efektivitas yang tinggi perlu diadakannya evaluasi pada penggunaan instrumen geoteknik. Dalam kajian ini evaluasi mencakup 3 instrumen geoteknik dimana Settlement Plate digunakan untuk mengevaluasi penurunan teoritis, menghitung prediksi penurunan akhir dengan metode observasi Asaoka serta derajat konsolidasi di lapangan. Derajat konsolidasi juga dievaluasi menggunakan instrumen Pneumatic Piezometer. Inclinometer digunakan untuk mengevaluasi kestabilan pada timbunan yang digunakan. Kegagalan desain pada penggunaan Preloading dan Prefabricetd Vertical Drain dapat terjadi dikarenakan kesalahan perencana dalam menentukan parameter-parameter desain tanah, oleh karena itu kajian ini juga membahas parameter desain tanah yang sesuai dengan yang terjadi di lapangan dengan menggunakan back analysis method. Hasil yang didapatkan dalam kajian ini adalah perbandingan penurunan aktual dan teoritis rata-rata sebesar 0,862. Untuk prediksi penurunan tanah akhir didapatkan nilai sebesar 2191,08 mm dengan sisa penurunan yang akan terjadi berkisar 100 – 450 mm. Pada kajian ini, derajat konsolidasi aktual dari bacaan Piezometer adalah 85,36% dan dari bacaan Settlement Plate adalah 88,42% dengan selisih perbedaannya sebesar 3,06%. Dari bacaan Inclinometer pergeseran lateral yang terjadi dibawah tanah tidak ada kelongsoran sehingga timbunan yang digunakan tetap aman. Hasil dari back analysis method merupakan nilai Ch dimana nilai Ch yang baru adalah 1,914Cv.

English Abstract

The settlement of soil consolidation is geotechnical problem which is often found in soft soil accumulation. It is therefore, Preloading and Prefabricated Vertical Drain techniques are used to accelerate consolidational settlement. The problem which often appeared in using Preloading and Prefabricated Vertical Drain (PVD) is the failure of design. It causes the consolidation time cannot run in accordance with the planning. In order to have soil improvemet method which has high effectiveness it is necessary to evaluate the use of geotechnical instruments. In this study, the evaluation covers 3 (three) geotechnical instruments, where Settlement Plate is used to evaluate theoretical settlement, to calculate final settlement prediction with Asaoka observation method and consolidation degree in the field. Consolidation degree also can be evaluated using Pneumatic Piezometer instrument. The inclinometer is used to evaluated the stability of embankment. The failure of design in using Preloading and Prefabricated Vertical Drain (PVD) can be accured because of the mistake of planner in determaining soil design parameters, therefore this study also discusses soil design parameters in actual condition using back analysis method. The results obtained in this study are comparison of actual and theoretical settlement on average of 0.862. To predict final settlement it can be obtained the value 2191,08 mm with the rest of settlement which will be accured about 100 – 450 mm. In this study the actual consolidation degree from Piezometer reading is 85,36% and Settlement Plate reading is 88,42% with the difference of 3,06%. From Inclinometer reading lateral shift which is accured below the soil there is no land slide so that the embankment which is used remains safe The result of back analysis method is Ch value where the new Ch value is 1,914Cv.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2018/119/051801171
Uncontrolled Keywords: Konsolidasi, preloading, prefabricated vertical drain, instrumen geoteknik, teori Asaoka
Subjects: 600 Technology (Applied sciences) > 624 Civil engineering > 624.1 Structural engineering and underground construction > 624.15 Foundation engineering and engineering geology > 624.151 Engineering geology > 624.151 3 Rock and soil mechanics > 624.151 36 Soil mechanics > 624.151 363 Soil stabilization
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Budi Wahyono Wahyono
Date Deposited: 19 Apr 2018 04:16
Last Modified: 18 Oct 2021 06:45
URI: http://repository.ub.ac.id/id/eprint/9620
[thumbnail of SKRIPSI - ZAHRA FEBRINA L - 135060100111027.pdf]
Preview
Text
SKRIPSI - ZAHRA FEBRINA L - 135060100111027.pdf

Download (3MB) | Preview

Actions (login required)

View Item View Item