Studi Perencanaan Pembangkit Listrik Tenaga Minihidro (PLTMH) di Sungai Aek Simonggo Desa Sion Kabupaten Humbang Hasundutan Provinsi Sumatera Utara

Mahendra, Hardiman (2017) Studi Perencanaan Pembangkit Listrik Tenaga Minihidro (PLTMH) di Sungai Aek Simonggo Desa Sion Kabupaten Humbang Hasundutan Provinsi Sumatera Utara. Sarjana thesis, Universitas Brawijaya.

Abstract

Pembangkit Listrik Tenaga Minihidro (PLTM) adalah suatu sistem pembangkit listrik yang dapat mengubah potensi air dengan ketinggian dan debit kelas menengah menjadi tenaga listrik, dengan mengguanakan turbin air dan generator. Dalam pasal 4 ayat 4 UU No. 20 Tahun 2002 tentang ketenagalistrikan juga disebutkan, guna menjamin ketersediaan energi primer untuk pembangkit tenaga listrik, diprioritaskan penggunaan sumber energi setempat dengan kewajiban mengutamakan pemanfaatan sumber energi terbarukan. PLTM dipilih sebagai salah satu energi alternatif dikarenakan memiliki beberapa keunggulan dibanding dengan pembangkit listrik lainnya, antara lain adalah tenaga penggeraknya yang tidak akan habis atau berubah menjadi bentuk lain, biaya operasional dan pemeliharaannya lebih murah, dan pengoperasiannya dapat dihentikan setiap saat tanpa melalui prosedur yang rumit. Sistem PLTM pun sangat sederhana dan memiliki ketangguahan yang baik. Pada penenlitian ini, akan dilakukan perencanaan dan analisis terkait perencanaan pembangkit listrik di Aek Siomonggo, Desa Sion. Perencanaan mula-mula dilakukan analisis debit banjir rancangan dan debit andalan yang bertujuan untuk menentukan setiap dimensi bangunan hingga daya dan energi dari PLTM Sion. Bangunan yang direncanakan meliputi Bendung, Intake, Saluran Pengarah, Bak Pengendap, Saluran Pembawa, Bak Penenang, Pipa Pesat, Rumah Pembangkit, dan Saluran Pembuang. Nantinya, Setelah direncanakan seluruh komponen PLTM, maka akan diketahui nilai daya (Kw) yang dihasilkan serta produksi energi tahunan (kWh). Sebagai penentu kelayakan proyek, Analisa Ekonomi menjadi pilihan untuk mengetahui layak tidaknya perencanaan pembangunan PLTM Sion. Hasil Perencanaan pada studi ini didapatkan debit banjir Q100 sebesar 682,31 m3/detik dan debit pembangkit dengan keandalan 40% sebesar 15,88 m3/detik. Tinggi bending 4 meter dengan lebar 56 meter, peredam energi tipe bak tenggelam dengan jari-jari 6 meter, intake dengan tinggi ambang 2 meter dan lebar 4,5 meter (3 pintu), saluran pembawa dengan lebar 5,7 meter, bak pengendap dengan luas endapan 604,69 m3, saluran pembawa dengan lebar 5 meter, pipa pesat dengan diameter 2,5 meter dan ketebalan 25 mm, bak penenang dengan volume 2.176,87 m3, dan saluran pembuang dengan lebar 5 meter. Trubin yang digunakan adalah tipe francis , yang mampu menghasilakan 11.634,58 kW dengan energi 80,06 GWh dalam 1 tahun. Biaya yang dibutuhkan untuk pembangunan Rp 463,825,496,434.55 dengan suku bunga 10,50%, Benefit Cost Ratio (BCR) sebesar 1,47, Internal Rate of Return (IRR) sebesar 12,44 %, Payback Period selama 13,6 tahun. Dari beberapa metode Analisa ekonomi yang digunakan dapat disimpulkan untuk pembangunan PLTM Sion layak secara ekonomi.

English Abstract

Minihidro power plant (PLTM) is a system of power plant water potential which can change with height and discharge of the middle class into electric power, with the use of water turbine and generator. In article 4 paragraph 4 of UU No. 20 2002th about the electricity also mentioned to ensure availability of primary energy for power plants, prioritized use of local energy sources with the obligation of giving priority to utilization of renewable energy sources. PLTM selected as one of alternative energy because has several advantages compared with other power plants, others are the power plants that will not be exhausted or transformed into other forms of operational and maintenance costs, cheaper to operate, and can be discontinued at any time without going through a complicated procedure. PLTM system is very simple and has a good toughness. In this study, the planning will be undertaken and related analysis of the planning of the power plant in Aek Siomonggo, village of Sion. Early planning is carried out an analysis of the design of flood discharge and discharge the mainstay that aims to determine the dimensions of each building up to the power and energy of PLTM Sion. The building is planned to include the Weirs, Intakes, settling basin, head race, penstock, forebay. After all the components planned PLTM, it will be known to the power rating (Kw) produced as well as annual energy production (kWh). As a determinant of economic analysis of the feasibility of the project, an option to find out whether a viable development planning PLTM Zion. The potensial of electric generation is very high so that the need for a planning study undertaken power plant Minihidro on the river Aek Simonggo, the Sion village, Humbang Hasundutan Regency, North Sumatera Province. Planning in this study the selected flood discharge Q100 to be 682.31 m3/s and plant discharge 40% to be 15.88 m3/s. High Dam holds 4 meters with a width of 56 meters, the energy reducer type tub sink with a radius of 6 meters, the intake with a high threshold of 2 meters and a width of 4.5 metres (3 doors), settling basin with extensive deposits of 604.69 m3, the head race with a width of 5 meters, penstock with a diameter of 2.5 meters and a rapidly and thickness of 25 mm, a forebay with a volume of 2,176.87 m3, and tail race with a width of 5 metres. The turbine used is capable of francis type, with the 11,634.58 kW or 67.99 GWh of energy in one year. The cost needed for the development of Rp 463,825,496,434.55 with interest rates 10.50%, Benefit Cost Ratio (BCR) of 1.47, Internal Rate of Return (IRR) of 12.44%, Payback Period for 13.6 years. Economic Analysis of some of the methods used can be inferred for PLTM Sion the development of economically viable.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2018/83/051800807
Uncontrolled Keywords: Pembangkit Listrik Tenaga Minihidro, Turbin, Daya, Energi, Listrik.
Subjects: 600 Technology (Applied sciences) > 621 Applied physics > 621.3 Electrical, magnetic, optical, communications, computer engineering; electronics, lighting > 621.31 Generations, modification, storage, transmission of electric power > 621.312 Generation, modification, storage > 621.312 1 Generation > 621.312 13 Specific kinds of mechanical generations > 621.312 134 Hydroelectric generation
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Budi Wahyono Wahyono
Date Deposited: 04 Apr 2018 07:34
Last Modified: 18 Oct 2021 03:44
URI: http://repository.ub.ac.id/id/eprint/9179
[thumbnail of HADIRMAN.pdf]
Preview
Text
HADIRMAN.pdf - Published Version

Download (15MB) | Preview

Actions (login required)

View Item View Item