Analisis Perbandingan Pondasi Sumuran Dengan Pondasi Tiang Bor Pada Proyek Pembangunan Gedung Laboratorium Vokasi Dan Industri Kreatif Universitas Brawijaya Kampus Dieng

Cintya, Febrina Sagita (2020) Analisis Perbandingan Pondasi Sumuran Dengan Pondasi Tiang Bor Pada Proyek Pembangunan Gedung Laboratorium Vokasi Dan Industri Kreatif Universitas Brawijaya Kampus Dieng. Sarjana thesis, Universitas Brawijaya.

Abstract

Pondasi adalah suatu konstruksi pada struktur/ bangunan yang bertujuan untuk menerima dan meneruskan beban di atasnya ke lapisan tanah di bawah struktur bangunan tersebut. Gedung Laboratorium Vokasi dan Industri Kreatif Universitas Brawijaya kampus Dieng merupakan salah satu infrastuktur yang sedang dibangun di Universitas Brawijaya tepatnya di kampus Dieng, Malang. Pada gedung ini direncanakan menggunakan pondasi dalam berupa tiang bor. Pada studi analisis ini dilakukan perencanaan ulang pondasi dengan menggunakan pondasi dalam berupa pondasi sumuran. Hasil studi analisis ini didapatkan berdasarkan uji lapangan Standart Penetration Test (SPT) yang diperoleh dari data sekunder atau konsultan perencana. Daya dukung ijin pondasi sumuran yang didapatkan dari perhitungan analitis menggunakan metode IRC dan IS 3955 pada pondasi dengan diameter 1 m sebesar 1135,33 kN, diameter 1,5 m sebesar 2596,561 kN dan pada pondasi diameter 2 m sebesar 4690,884 kN . Kemudian pada program Plaxis 2D didapatkan nilai daya dukung sebesar 3570,655 kN kN/m2 untuk pondasi diameter 2 m, 26525,904 kN untuk pondasi dengan diameter 1,5 m, dan 2686,424 kN/m2 untuk pondasi berdiameter 1 m. Pondasi ini dapat dinyatakan aman, karena nilai daya dukung lebih besar dari beban yang bekerja. Nilai penurunan juga relatif kecil yaitu sebesar 0,0023 m untuk pondasi sumuran berdiameter 1 m dan 2 m, sedangkan pondasi sumuran berdiameter 1,5 m sebesar 0,0022 m. Analisis biaya konstruksi menunjukkan bahwa penggunaan pondasi sumuran lebih ekonomis sejumlah Rp. 6.551.268.291,26 dibandingkan pondasi tiang bor yang mencapai Rp. 8.463.126.337,15. Analisis ini dapat disimpulkan bila memperhatikan aspek daya dukung, penurunan, dan biaya konstruksi pemakaian pondasi sumuran pada gedung laboratorium vokasi dan industri kreatif Universitas Brawijaya kampus Dieng dianjurkan karena selain pondasi aman digunakan dan biaya yang lebih murah.

English Abstract

The foundation is a construction under a structure or building planned to receive and distribute loads above to the ground under the structure of the building. The Vocational and Creative Industry Laboratory Building University of Brawijaya Dieng Campus is one of the infrastructures that is being built at University of Brawijaya Dieng Campus. It’s planned to use a bored pile foundation at this building. In this analysi sstudy, the foundation is re-planned by using a deep foundation, specifically a well foundation. The results of this study were obtained through a Standard Penetration Test (SPT) from secondary data. The allowable bearing capacity of well foundation obtained from analytical calculations using the IRC and IS 3955 methods with diameter of 1 m is 1135.33 kN, 1.5 m diameter is 2596,561 kN and 2 m diameter is 4690,884 kN. In Plaxis 2D program, the bearing capacity with diameter of 2 m is 3570,655 kN kN, 1,5 m diameter is 26525,904 kN and 1 m diameter is 2686,424 kN. The results show that the use of this foundation is safe because the allowable bearing capacity is greater than the load. The settlement is also relatively small, only 0.0023 m for well foundation with diameters of 1 m and 2 m, while the settlement of well foundation with diameter of 1.5 m is 0.0022 m. Analysis of construction costs shows that the use of a well foundation is more economical of Rp 6,551,268,291.26, compared to the bored pile foundation which reached Rp. 8,463,126,337.15. From this analysis, it can be concluded that the use of well foundation is more recommended for the building because this foundation is sturdier and more economical than the bored pile foundation, based on allowable bearing capacity, settlement, and cost aspects.

Other obstract

-

Item Type: Thesis (Sarjana)
Identification Number: 0520070207
Uncontrolled Keywords: Pondasi sumuran, pondasi tiang bor, daya dukung, penurunan, biaya konstruksi well foundation, bored pile foundation, bearing capacity, settlement, cost
Subjects: 600 Technology (Applied sciences) > 624 Civil engineering > 624.1 Structural engineering and underground construction > 624.15 Foundation engineering and engineering geology
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Users 31 not found.
Date Deposited: 28 Feb 2021 04:11
Last Modified: 30 Sep 2024 06:58
URI: http://repository.ub.ac.id/id/eprint/183070
[thumbnail of Febrina Sagita Cintya.pdf] Text
Febrina Sagita Cintya.pdf

Download (9MB)

Actions (login required)

View Item View Item