AdityaWiharsa, Ida (2017) Perencanaan Bangunan Reservoir dan Jaringan Pipa Distribusi Air Bersih di desa Randugading Kecamatan Tajinan Malang. Sarjana thesis, Universitas Brawijaya.
Abstract
Desa Randugading, merupakan salah satu desa yang terletak di kecamatan Tajinan, Kabupaten Malang. Pada daerah tersebut terdapat mata air Ngembul yang digunakan untuk memenuhi kebutuhan domestik dan non-domestik penduduk setempat. Akan tetapi, elevasi pada desa Randugading lebih tinggi bila dibandingkan dengan elevasi mata air Ngembul. Sehingga digunakan pompa hydrum untuk dapat mendistribusikan air bersih dari mata air menuju rumah penduduk. Sebelum air bersih dapat terdistribusikan dengan baik menuju rumah penduduk diperlukan proyeksi kebutuhan domestik dan non-domestik untuk mengetahui seberapa besar debit yang dibutuhkan untuk memenuhi kebutuhan tersebut. Selain itu juga direncanakan berapa besarnya dimensi bangunan reservoir yang berguna untuk menampung air bersih sebelum disalurkan menuju rumah penduduk dan agar dapat memenuhi besarnya debit kebutuhan air bersih pada jam puncak. Selain itu direncanakan pula pipa induk distribusi air bersih agar air bersih yang telah ditampung oleh reservoir dapat dimanfaatkan oleh penduduk sekitar. Desa Randugading terdiri dari dua pemukiman penduduk, sehingga dalam perencanaannya bangunan reservoir dibangun pada dua tempat yang berbeda, masing-masing dari pemukiman direncanakan memiliki bangunan reservoir sesuai dengan besarnya kebutuhan air bersih pada jam puncak pada masing-masing daerah, yaitu sebesar 0,00153 m3/detik atau sebesar 5,508 m3/ jam dan 0,00076 m3/detik atau sebesar 2,736 m3/jam. Sedangkan untuk pipa distribusi direncanakan memiliki head tekan pipa terjauh sebesar 19,597 meter dan 52,598 meter untuk masing-masing daerah.
English Abstract
Randugading village, is one of the villages located in the district Tajinan, Malang. In the area there are springs Ngembul used to meet the needs of domestic and non-domestic locals. However, the village Randugading elevation higher than the elevation springs Ngembul. So that the pump is used hydraulic ram pump can transform and distribute clean water from the spring to the house residents. Before the water can be distributed properly to the home population projection is required domestic demand and non-domestic to know how big the discharge required to meet those needs. It is also planned how the magnitude of the dimensions of the building to accommodate a useful reservoir of clean water before it is piped to the houses and in order to meet the amount of discharge water needs at peak hours. In addition it also planned to pipe water distribution mains in order to clean water that has been accommodated by the reservoir can be used by people around. Randugading village consists of two settlements, so that in the plan of building a reservoir was built in two different places, each of the residential building is planned to have reservoir in accordance with the amount of water needs at peak hours in each region, which amounted to 0.00153 m3 / sec or at 5.508 m3 / h and 0.00076 m3 / sec or at 2,736 m3 / h. As for the planned distribution pipe has a head pipe farthest press of 19.597 meters and 52,598 meters for each region.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | SKR/FT/2017/67/051701220 |
Subjects: | 600 Technology (Applied sciences) > 624 Civil engineering |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Sugiantoro |
Date Deposited: | 24 Feb 2017 15:11 |
Last Modified: | 24 Oct 2021 10:11 |
URI: | http://repository.ub.ac.id/id/eprint/145620 |
Preview |
Text
1_COVER.pdf Download (1MB) | Preview |
Preview |
Text
2_ISI.pdf Download (2MB) | Preview |
Preview |
Text
7._DAFTAR_ISI.pdf Download (1MB) | Preview |
Preview |
Text
13._BAB_I.pdf Download (1MB) | Preview |
Preview |
Text
11._RINGKASAN.pdf Download (1MB) | Preview |
Preview |
Text
12._SUMMARY.pdf Download (1MB) | Preview |
Preview |
Text
14._BAB_II.pdf Download (2MB) | Preview |
Preview |
Text
15._BAB_III.pdf Download (1MB) | Preview |
Preview |
Text
16._BAB_IV.pdf Download (2MB) | Preview |
Preview |
Text
17._BAB_V.pdf Download (1MB) | Preview |
Preview |
Text
18._DAFTAR_PUSTAKA.pdf Download (1MB) | Preview |
Preview |
Text
19._LAMPIRAN.pdf Download (2MB) | Preview |
Preview |
Text
1._JUDUL.pdf Download (1MB) | Preview |
Actions (login required)
View Item |