Kajian Biaya Penggunaan Alat Berat Untuk Pekerjaan Pengangkutan Dan Penimbunan Pada Proyek Perumahan Villa Bukit Tidar Malang Dengan Program Linier Metode Simpleks

Wibowo, Satrio Agung (2017) Kajian Biaya Penggunaan Alat Berat Untuk Pekerjaan Pengangkutan Dan Penimbunan Pada Proyek Perumahan Villa Bukit Tidar Malang Dengan Program Linier Metode Simpleks. Sarjana thesis, Universitas Brawijaya.

Abstract

Proyek Villa Bukit Tidar Cluster E34 adalah salah satu proyek Perumahan Cluster baru di Perumahan Villa Bukit Tidar. Proyek ini memiliki luas 3,2 ha. Sebelumnya kawasan ini merupakan lahan kosong dengan bekas aliran sungai. Area tersebut memerlukan penimbunan material agar elevasi pembangunan dapat dicapai. Pelaksanaan penimbunan dan pengangkutan material tentu saja memerlukan beberapa alat berat sehingga pembangunan dapat selesai sesuai dengan rencana. Oleh karenanya dibutuhkan perhitungan optimal agar biaya minimum dalam pelaksanaan pekerjaan dapat dicapai. Tugas akhir ini dilakukan untuk menentukan biaya minimum penggunaan alat berat pada Proyek Villa Bukit Tidar Cluster E34, yang berfokus pada pengangkutan dan penimbunan material. Penelitian ini melibatkan variabel keputusan yaitu jumlah jam operasional alat berat dengan fungsi tujuan berupa meminimumkan biaya. Beberapa kendala yang diperhitungkan dalam perhitungan biaya proyek antara lain kendala waktu, kendala sewa alat berat, kendala waktu penyelesaian pekerjaan, dan kendala volume. Berdasarkan hasil analisis perhitungan, maka biaya minimum yang dibutuhkan untuk pekerjaan pengangkutan tanah adalah Rp.248.296.400, dan untuk pekerjaan penimbunan dengan bulldozer dibutuhkan biaya minimum sebesar Rp.111.571.400.

English Abstract

Project Villa Bukit Tidar Cluster E34 is one of the new cluster project in Villa Bukit Tidar Housing. The project is about 3,2 ha. Previously this area is an empty land with a former stream. Such areas require hoarding of material in order for the construction elevation to be achieved. Implementation hoarding and transport material of course requires several heavy equipment that construction can be completed in accordace with the plan. Therefore, an optimal calculation is required that minimum cost in the implementation of work can be achieved. The final project aims to determine the minimum cost of heavy equipment used in the Villa Bukit Tidar Cluster E34 Project, which focuses the transportation and hoarding of materials. This research involves decision variables that is the number of hours oh heavy equipment operation with the objective function of minimizing costs. Some of the constraints calculated in the project cost calculation include time constraints, heavy equipment rental constraints, time constraints of work completion, and volume constraints. Based the calculation result, minimum cost required for land transportation is Rp248.296.400, and for hoarding the minimum cost is Rp111.571.400.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2017/1123/051712671
Uncontrolled Keywords: Alat Berat, Metode Simpleks, Program Linier, Optimasi
Subjects: 600 Technology (Applied sciences) > 692 Auxiliary construction practices > 692.5 Estimates of labor, time, materials
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Yusuf Dwi N.
Date Deposited: 08 Jan 2018 06:45
Last Modified: 08 Oct 2020 07:41
URI: http://repository.ub.ac.id/id/eprint/7762
Full text not available from this repository.

Actions (login required)

View Item View Item