Studi Perencanaan Sistem Distribusi Air Bersih Di Kecamatan Lawang, Kabupaten Malang Dengan Menggunakan Bantuan Aplikasi Watercad V8. I

Prayuda, Rozaky Cahyo (2017) Studi Perencanaan Sistem Distribusi Air Bersih Di Kecamatan Lawang, Kabupaten Malang Dengan Menggunakan Bantuan Aplikasi Watercad V8. I. Sarjana thesis, Universitas Brawijaya.

Abstract

Kecamatan Lawang terdiri dari 12 Desa yaitu Desa Sidoluhur, Srigading, Sidodadi, Bedali, Kalirejo, Mulyoarjo, Sumber Ngepoh, Sumber Porong, Turirejo, Ketindan, Wonorejo dan Lawang. Dari jumlah penduduk 102.979 jiwa tersebut masih ada sekitar 8.410 KK belum terlayani air minum dengan sistem perpipaan (PDAM dan Swadaya/lainnya) atau sekitar 65 %. Pada saat ini IKK Lawang dengan perkembangan kota urban yang semakin pesat terdapat permintaan kebutuhan air minum yang semakin meningkat namun demikian dengan kapasitas produksi yang terbatas. Menyikapi hal ini dalam studi ini membahas perencanaan jaringan air bersih untuk Kecamatan Lawang yang memanfaatkan debit mata air Krabyakan sebesar 50 liter/detik. Dalam studi ini, dilakukan analisa jaringan air bersih dengan bantuan program WaterCAD v8i untuk mengetahui kondisi hidrolis jaringan perpipaan. Ada 3 Alternatif perencanaan, pertama menggunakan 1 buah tandon dan 2 buah pompa berkapasitas 50 l/detik dengan pola operasi pompa yaitu 13,5 jam/ hari beroperasi secara bersamaan. Kedua, menggunakan 1 buah tandon dan 4 buah pompa berkapasitas 50 l/detik dengan pola operasi pompa yaitu 14 jam/ hari beroperasi secara bersamaan. Ketiga, menggunakan 1 buah tandon dan 4 buah pompa berkapasitas 25 l/detik dengan pola operasi pompa yaitu 18 jam/ hari beroperasi secara bergantian per dua pompa. Dari hasil simulasi dengan bantuan WaterCAD v8i, bahwa sistem jaringan perpipaan dapat berjalan dengan baik. Hal ini berdasarkan kondisi tekanan pada alternatif pertama 0,1- 7,9 atm, alternatif kedua 0,1-7,9 atm, dan alternatif ketiga 0,1-8 atm ,headloss gradient alternatif pertama 0,03-6,27 m/km, alternatif kedua 0,1-7,47 m/km, dan alternatif ketiga 0,1- 7,5 m/km, dan kecepatan alternatif pertama 0,1-0,8 m/detik, alternatif kedua 0,1-1,2 m/detik, dan alternatif ketiga 0,1-1,2 m/detik. Hasil ini sudah sesuai dengan syarat perencanaan. Anggaran biaya untuk alternatif pertama sebesar Rp 8,256,076,000.00, alternatif kedua sebesar Rp 8,129,576,000.00, sedangkan alternative ketiga Rp 8,088,267,000.00.

English Abstract

Lawang sub district consist of 12 villages, Sidoluhur, Srigading, Sidodadi, Bedali, Kalirejo, Mulyoarjo, SUmber Ngepoh, SUmber Porong, Turi Rejo, Ketindan, Wonorejo and Lawang. From population of 103.979 people there are 8.410 family heads who are not served by drinking water with piping system (PDM and self-help/others) or about 65%. Today, IKK of Lawang with the rapid urban development there is drinking water need which increases but with still limited production capacity. To respond the matters, in the study discuss about clean water network planning for Lawang sub district that use water spring of Krabyakan of 50 lite/second. In the study, it was done analysis of clean water with aid of WaterCAD v8i to know the hydraulic condition from the piping network. There are 3 alternatives of planning, first by using 1 tank and 2 pumps with capacity of 50 1/second with operation pattern of pumps of 13.5 hours/day operation simultaneously. Second, by using 1 tank and 4 pump of 50 l/second with operation pattern of pump 15 hour/day operation simultaneously. Third, by using 1 tank and 4 pump with capacity of 15 l/second with pump operation pattern of 18 hours/day operation alternately per two pumps. From the simulation results with aid of WaterCAD v8i, that the piping network can run well. It is based on the pressure condition at the first alternative 0.1-7.9 atm, second alternative 0.1-7.9 atm, and third alternative 0.1-8 atm, head loss gradient for first alternative 0.03-6.27 m/km, second alternative 0.1-7.47 m/km, and third alternative 0.1-7.5 m/km, and speed for first alternative 0.1-0.8 m/second, second alternative 0.1-1.2 m/second, and third alternative 0.1-1.2 m/second. The results suitable with the planning requirement. The budget for first alternative of Rp 8.256.076.000,00, second alternative of Rp 8.129.576.000,00 and third alterative of Rp 8.088.267.000,00

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2017/1062/051711920
Uncontrolled Keywords: WaterCAD V.8i, Rencana Anggaran Biaya, waterCAD v8i, cost budget plan
Subjects: 600 Technology (Applied sciences) > 628 Sanitary engineering > 628.1 Water supply
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Nur Cholis
Date Deposited: 04 Jan 2018 01:41
Last Modified: 13 Oct 2020 03:14
URI: http://repository.ub.ac.id/id/eprint/7697
Full text not available from this repository.