Perhitungan Harga Pokok Produksi Dengan Metode Job Order Costing (Studi Kasus Pada Home Industry Kerajinan Berbahan Dasar Kain Perca “Pelangi Nusantara” Di Kab. Malang)

Assalam, Hafish (2017) Perhitungan Harga Pokok Produksi Dengan Metode Job Order Costing (Studi Kasus Pada Home Industry Kerajinan Berbahan Dasar Kain Perca “Pelangi Nusantara” Di Kab. Malang). Sarjana thesis, Universitas Brawijaya.

Abstract

Pelangi Nusantara adalah Home Industry dalam bidang kerajinan berbahan dasar kain perca yang bersifat sociopreneur dimana dalam menjalankan bisnisnya Pelangi Nusantara juga bertujuan untuk memberdayakan kaum perempuan. Penentuan harga jual dalam Home Industry Kerajinan Berbahan Dasar Kain Perca “Pelangi Nusantara” sudah menjadikan perhitungan harga pokok produksi (HPP) sebagai dasar namun perhitungan HPP yang telah dilakukan perusahan masih belum memasukan keseluruhan komponen-komponen biaya, sehingga perhitungan HPP cenderung lebih kecil dengan realisasi biaya yang dikeluarkan, terutama untuk biaya overhead pabrik. Penelitian ini bertujuan untuk mengetahui dan membandingkan perhitungan HPP pesanan tas totebag aplikasi batik menurut perusahan dan perhitungan HPP dengan metode job order costing. Penelitian ini adalah penelitian deskriptif dengan pendekatan studi kasus Sumber data menggunakan data primer dan sekunder sedangkan jenis datanya adalah data kuantitatif dan kualitatif. Tekhnik pengumpulan data yaitu dengan wawancara dan dokumentasi.Tekhnik analisis data yang digunakan adalah perhitungan HPP dengan metode Job order costing. Berdasarkan hasil penelitian, perhitungan HPP menurut perusahaan sebesar Rp 22.860,00 dan berdasarkan metode job order costing sebesar Rp 27.977,28 sehingga terdapat selisih sebesar Rp 5.117,28. Sedangkan untuk harga jual menurut perusahan sebesar Rp 30.000,00 dan harga jual berdasarkan metode job order costing sebesar Rp 36.370,46 sehingga terdapat selisih sebesar Rp 6.370,46. Perbedaan perhitungan HPP dan harga jual menurut perusahaan yang lebih rendah ini dikarenakan perusahaan belum memasukan keseluruhan komponen biaya tenaga kerja langsung dan biaya overhead pabrik

English Abstract

Pelangi Nusantara is a home industry producing patchwork crafts. The objective of this sociopreneurship business is to empower women. This company has used COGM calculation to determine the selling price of its product, but not all components have been included in the calculation, so its result is smaller than the cost they have actually paid, especially the factory’s overhead cost. This research aims to analyze the COGM calculation for batik-applications totebag that is done by the company and compare it with COGM calculation using job order costing method. This descriptive research uses case study approach, in which its primary and secondary data are quantitative and qualitative ones, which were collected through interview and documentation. The result of the company’s calculation on the COGM of the product is IDR 22,860.00, while the result of the calculation using job order costing method is IDR 27,977.28, so the difference between the two is IDR 5,177.28. The selling price determined by the company is IDR 30,000.00, while the price according to job order costing method is IDR 36,370.46, so the difference is IDR 6,370.46. The differences occur because the company has not included all components of direct labor cost and factory overhead cost.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FE/2017/709/051711894
Uncontrolled Keywords: Harga Pokok Produksi, Job order costing, calculation of cost of goods manufactured, job order costing
Subjects: 600 Technology (Applied sciences) > 658 General management > 658.1 Organization and financial management > 658.15 Financial management > 658.151 Financial control > 658.151 1 Managerial accounting
Divisions: Fakultas Ekonomi dan Bisnis > Manajemen
Depositing User: Nur Cholis
Date Deposited: 18 Dec 2017 01:34
Last Modified: 07 Dec 2021 04:49
URI: http://repository.ub.ac.id/id/eprint/7127
[thumbnail of 2.BAB I.pdf]
Preview
Text
2.BAB I.pdf

Download (283kB) | Preview
[thumbnail of 1.Bagian Depan.pdf]
Preview
Text
1.Bagian Depan.pdf

Download (1MB) | Preview
[thumbnail of 4.BAB III.pdf]
Preview
Text
4.BAB III.pdf

Download (196kB) | Preview
[thumbnail of 3.BAB II.pdf]
Preview
Text
3.BAB II.pdf

Download (292kB) | Preview
[thumbnail of 5.BAB IV.pdf]
Preview
Text
5.BAB IV.pdf

Download (661kB) | Preview
[thumbnail of 6.BAB V.pdf]
Preview
Text
6.BAB V.pdf

Download (189kB) | Preview
[thumbnail of 7.Daftar Pustaka.pdf]
Preview
Text
7.Daftar Pustaka.pdf

Download (184kB) | Preview

Actions (login required)

View Item View Item