Evaluation Of Schedule Delay Approaches To Indonesia Construction Project

Kamandang, Zetta Rasullia (2017) Evaluation Of Schedule Delay Approaches To Indonesia Construction Project. Magister thesis, Universitas Brawijaya.

Abstract

Keterlambatan penjadwalan proyek adalah salah satu masalah yang mengkhawatirkan dalam industri konstruksi. Aktivitas-aktivitas yang mengalami keterlambatan dapat meningkatkan durasi dan biaya proyek serta tak jarang menyebabkan perselisihan antara pihak-pihak proyek konstruksi dalam menentukan klaim tanggungjawab keterlambatan. Beberapa metode telah dikembangkan oleh penelitian-penelitian terdahulu guna menganalisis dan menghitung keterlambatan jadwal proyek, namun sebagian besar metode tersebut mengandung asumsi dan penilaian yang subjektif. Sehingga, uji ketahanan atau robustness test terhadap penelitian terdahulu adalah hal penting untuk harus dilakukan dengan menerapkan metode-metode tersebut pada kasus proyek di Indonesia yang memiliki beragam hubungan antar aktivitas dan frekuensi concurrent delay yang cukup tinggi. Selain itu, penelitian ini bertujuan untuk menyediakan panduan yang dapat digunakan oleh praktisi proyek konstrukai di Indonesia dalam memilih metode analisis keterlambatan jadwal proyek yang paling sesuai serta menemukan karakteristik metode-metode yang dapat memperoleh hasil concurrent delay yang merupakan salah satu isu penting terkait keterlambatan jadwal proyek. Dalam penelitian ini, mengumpulkan dan menganalisis informasi aktual penjadwalan proyek, mengidentifikasi aktivitas-aktivitas yang mengalami keterlambatan jadwal, melakukan analisis keterlambatan (schedule delay analysis) dan membandingkan hasil analisis yang diperoleh telah selesai dilakukan guna memeriksa kemungkinan penerapan metode-metode yang ada dalam memperoleh hasil yang tepat. Wawancara dengan pakar-pakar proyek konstruksi di Indonesia juga telah dilakukan untuk mengumpulkan informasi, saran dan opini agar dapat menyajikan panduan dalam memilih metode analisis keterlambatan jadwal proyek yang relevan dan dapat diterima. Penelitian ini menyimpulkan bahwa sebagian besar metode dapat digunakan untuk proyek konstruksi di Indonesia. Penerapan metode-metode tersebut adalah berdasarkan pada seberapa rinci hasil yang diharapkan dan seberapa lengkap data proyek yang tersedia. Penelitian ini juga menyajikan panduan yang terdiri dari tiga tahap, yaitu sebelum, sedang, dan sedang/setelah proyek konstruksi berlangsung. Sebelum proyek konstruksi dimulai, menyiapkan klausa berkaitan dengan concurrent delay, kepemilikan float dan pengelompokan jenis keterlambatan proyek adalah hal perlu dilakukan saat penyusunan kontrak proyek. Pengelompokan jenis keterlambatan lebih baik dilakukan saat proyek konstruksi sedang berlangsung, sedangkan penyusunan as-planned schedule, as-built schedule, dan waktu/jenis keterlambatan proyek menjadi satu tabel perbandingan dapat dilakukan saat sedang/setelah proyek konstruksi berlangsung. Guna memperoleh hasil concurrent delay yang terjadi, membagi jadwal menjadi beberapa kerangka berdasarkan interval durasi proyek dan melibatkan perspektif owner dan kontraktor secara berkelanjutan dalam satu perhitungan adalah hal penting yang harus dilakukan.

English Abstract

Schedule delay is one of the worrying problems in the construction industry. Activity delays might increase project duration, cost and sometimes cause delay claim disputes between participants in construction projects. Some methods have been developed for analyzing and measuring project schedule delays, but most of those methods contain assumptions and subjective assessments. Furthermore, conducting a study that processes a robustness test of previous researches is noteworthy. In order to analyze and examine schedule delay approaches to support the research robustness, this study implements popular schedule delay analysis methods into a real project case in Indonesia which has varied relationships among activities and high frequency of concurrent delays. Moreover, this research aims to provide a guideline in choosing the suitable schedule delay analysis method(s) for Indonesia construction practitioners and discover the characteristics of method(s) that can obtain concurrent delay result since the concurrent delay is one of important issues in schedule delay. In this study, collecting and analyzing actual project schedule information, identifying delay events, executing delay analysis and comparing analytical results have been completed to examine the possibilities of applying available methods to provide reasonable or even correct outcomes. Interviews with domain experts in Indonesia were also conducted to collect some information, advices and opinions in order providing a relevant guideline. This study concludes that most of schedule delay analysis methods can be used for Indonesia construction project. The applicability depends on the needed results and the available data. This study also provides a guideline consisting of three phases, before, during, and during/after construction project. Before construction, preparing concurrent delay, float ownership and delay categorizing issues is necessary in the contract. Categorizing schedule delay type is preferable during the construction and arranging the as-planned schedule, as-built schedule and delay time/types into one comparison table can be performed during or after the construction. In term of obtaining concurrent delay results, dividing schedule into several time frames and including the owner’s and contractor’s perspective continuously into one calculation are essential.

Item Type: Thesis (Magister)
Identification Number: TES/624/KAM/e/2017/041705667
Uncontrolled Keywords: CONSTRUCTION PROJECTS, PRODUCTION SCHEDULING, CONSTRUTION INDUSTRY - MANAGEMENT
Subjects: 600 Technology (Applied sciences) > 624 Civil engineering
Divisions: S2/S3 > Magister Teknik Sipil, Fakultas Teknik
Depositing User: Nur Cholis
Date Deposited: 27 Jul 2017 04:07
Last Modified: 14 Dec 2020 13:00
URI: http://repository.ub.ac.id/id/eprint/701
[thumbnail of BAGIAN DEPAN.pdf] Text
BAGIAN DEPAN.pdf
Restricted to Repository staff only

Download (952kB)
[thumbnail of CHAPTER 1.pdf] Text
CHAPTER 1.pdf
Restricted to Repository staff only

Download (252kB)
[thumbnail of CHAPTER 2.pdf] Text
CHAPTER 2.pdf
Restricted to Repository staff only

Download (489kB)
[thumbnail of CHAPTER 3.pdf] Text
CHAPTER 3.pdf
Restricted to Repository staff only

Download (1MB)
[thumbnail of CHAPTER 4.pdf] Text
CHAPTER 4.pdf
Restricted to Repository staff only

Download (754kB)
[thumbnail of CHAPTER 5.pdf] Text
CHAPTER 5.pdf
Restricted to Repository staff only

Download (391kB)
[thumbnail of CHAPTER 6.pdf] Text
CHAPTER 6.pdf
Restricted to Repository staff only

Download (254kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf
Restricted to Repository staff only

Download (261kB)

Actions (login required)

View Item View Item