Muttafaq, Warid (2017) Perencanaan Bangunan Pelimpah Samping (Side Channel Spillway) Bendungan Budong-Budong Kabupaten Mamuju Tengah Provinsi Sulawesi Barat. Sarjana thesis, Universitas Brawijaya.
Abstract
Dalam rangka memenuhi kebutuhan irgasi dan air baku penduduk Kabupaten Mamuju Tengah maka akan di rencanakan suatu bendungan yang akan menampung air guna memenuhi kebutuhan tersebut. Sehingga akan direncanakan Bendungan Budong-Budong yang berada di Kabupaten Mamuju Tengah. Secara teknis komponen-komponen utama bendungan adalah tubuh bendungan (main dam), pintu pengambilan (intake), dan pelimpah (spillway). Pelimpah merupakan bangunan pelengkap artinya bangunan beserta instalasinya yang memungkinkan beroperasinya bendungan dengan baik, bila bangunan ini tidak berfungsi/tidak ada maka dapat membahayakan konstruksi bendungan. Sehubungan dengan hal tersebut, maka perlu dilakukan kajian untuk merencanakan pembangunan Bendungan Budong-Budong. Salah satunya yaitu dengan melakukan Kajian Perencanaan Bangunan Pelimpah Bendungan Budong-Budong, Kabupaten Mamuju Tengah. Tahapan awal dari studi ini yaitu merencanakan pelimpah sesuai dengan kondisi hidrologi, geoteknik dan topografi. Setelah itu dilakukan analisa mengenai stabilitas guling, geser, eksentrisitas dan daya dukung tanah dari bangunan ambang pelimpah dan dinding penahan. Dari hasil analisa stabilitas didapatkan keadaan bangunan dan desain yang memenuhi persyaratan keamanan, dalam studi ini bangunan ambang pelimpah dan dinding penahan menggunakan konstruksi beton bertulang. Dari hasil studi didapatkan analisis berupa desain pelimpah samping dengan perencanaan hidrolika pelimpah telah memenuhi untuk kondisi Q100th, Q1000th, dan QPMF. Selanjutnya merencanakan bentuk dinding penahan dengan menggunakan dinding penahan tipe gravity wall. Selanjutnya analisis berupa stabilitas dan daya dukung ambang pelimpah dan dinding penahan memenuhi persyaratan. Daya dukung tanah pada ambang pelimpah dan dinding penahan dapat menahan tegangan yang terjadi pada bangunan. Pada konstruksi ambang pelimpah dan dinding penahan direncanakan beton f’c = 25 MP dan fy = 400 MPa.
English Abstract
In order to meet the needs of irrigation and water for Central Mamuju Regency society, a dam which is expected to accommodate water to meet those needs will be planned. So, Budong-Budong Dam will be planned located in Central Mamuju Regency. Technically, the main components of the dam are the main dam, intake, and spillway. The spillway is a supporting building which means the building and its installation allow the dam to operate well, if this building is not working or not exist then it can endanger the dam construction. Relating to those circumstances, it is necessary to conduct a study to plan the Budong-Budong Dam. One of them is by conducting Study of Spillway Planning of Budong-Budong Dam, Central Mamuju Regency. The initial stage of the study is to plan the appropriate spillway construction relating to hydrology, geotechnics and topography. The next step is to analyze the possibility of overturning, shear stability, eccentricity and bearing capacity of the spillway and retaining walls. According to the result of stability analysis, it is found that the building conditions have met the safety requirements, in this study the spillway and retaining walls are using reinforced concrete construction. The result of the analysis showed that the side channel spillway which designed through hydraulic planning has met the condition for Q100th, Q1000th, QPMF. Furthermore, planning of retaining wall using gravity wall type. Moreover, the analysis of overturning stability and bearing capacity for the spillway and retaining walls have met the requirements. However, the bearing capacity of spillway and retaining walls can overcome the stress of the building. The construction of spillway and retaining walls are planned to use of concrete with f'c = 25 MPa and steel reinforcement with fy = 400 Mpa.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | SKR/FT/2017/1032/051711618 |
Uncontrolled Keywords: | pelimpah samping, side channel spillway, dinding penahan, dan beton bertulang. |
Subjects: | 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.8 Dams and reservoirs |
Divisions: | Fakultas Teknik > Teknik Pengairan |
Depositing User: | Budi Wahyono Wahyono |
Date Deposited: | 12 Dec 2017 07:06 |
Last Modified: | 16 Jun 2022 02:18 |
URI: | http://repository.ub.ac.id/id/eprint/6880 |
Text
WARID MUTTAFAQ.pdf Download (12MB) |
Actions (login required)
View Item |