Abstract

Waduk merupakan alternatif dari sistem penyediaan air yang dibangun untuk menampung kelebihan air di musim hujan yang nantinya akan dipergunakan pada musim kemarau. Air tampungan tersebut akan dimanfaatkan untuk menyuplai air baku, irigasi, industri, PLTA dan juga dapat digunakan untuk mengurangi debit banjir. Dalam menyuplai air secara optimal maka diperlukan pedoman pola operasi waduk agar air dapat teralokasi secara proporsional. Waduk Budong - Budong terletak di Kabupaten Mamuju Tengah Provinsi Sulawesi Barat. Waduk Budong - Budong dibangun dengan tujuan agar dapat melayani kebutuhan irigasi, air baku, dan PLTMH. Waduk Budong - Budong terletak di wilayah sungai Kalukku Karama. Data yang digunakan dalam studi ini yaitu data curah hujan, jumlah penduduk, klimatologi, pola tata tanam, dan teknis waduk. Data curah hujan dan klimatologi digunakan dalam analisa perhitungan debit sungai dengan metode FJ. Mock. Hal ini dikarenakan daerah studi tidak terdapat data debit pengukuran. Debit FJ. Mock inilah yang diolah dengan metode karakteristik aliran tahun dasar empat keandalan (26,02%, 50,68%, 75,34%, 97,30%) sehingga menjadi debit inflow. Data jumlah penduduk tahun terakhir digunakan dalam memproyeksikan jumlah penduduk selama 40 tahun kedepan untuk menghitung kebutuhan air baku. Data pola tata tanam digunakan dalam menghitung kebutuhan air irigasi. Sehingga kebutuhan air irigasi dan air baku merupakan outflow yang harus dipenuhi oleh waduk. Outflow tersebut yang dipakai untuk membangkitkan daya PLTMH. Dalam merencanakan pedoman pola operasi waduk, semua inputan data tersebut dianalisa menggunakan metode simulasi pola operasi waduk berdasarkan karakteristik tampungan (Rule Curve). Dari perhitungan debit andalan, didapatkan debit rata-rata sebesar 4,411 m3/detik. Untuk kebutuhan air irigasi diperoleh debit rata-rata sebesar 0,852 lt/dt/ha atau 4,260 m3/detik dan air baku sebesar 0,853 m3/detik. Sehingga dari hasil simulasi pola operasi waduk Budong - Budong menghasilkan debit rata-rata sebesar 32,091 m3/detik dari berbagai kondisi keandalan (26,02%, 50,68%, 75,34%, 97,30%). Dengan debit lepasan sebesar 32,091 m3/detik menghasilkan rata-rata daya sebesar 0,624 MW dan energi listrik sebesar 14,983 MWh.

English Abstract

Reservoir is an alternative to the water supply system built to accommodate excess water in the rainy season which will be used in the dry season. The water will be utilized to supply raw water, irrigation, industry, hydropower and can also be used to reduce flood discharge. In supplying water optimally it is necessary guidance of operation rules of reservoir so that water can be allocated proportionally. Budong - Budong Reservoir is located in Central Mamuju Regency of West Sulawesi Province. Budong - Budong Reservoir is built with the aim to serve the needs of irrigation, raw water, and PLTMH. Budong - Budong Reservoir is located in the Kalukku Karama river region. Data used in this study are rainfall data, population, climatology, planting rules, and technical reservoir. Rainfall and climatology data are used in the analysis of river flow calculations by the FJ. Mock method. This is because the study area there is no debit measurement / AWLR data. Debit FJ. Mock is processed by the method of characteristic flow of base year four reliability (26,02%, 50,68%, 75,34%, 97,30%) to become the inflow debit. Population data last year is used in projecting the population over the next 40 years to calculate raw water requirements. Data on planting rules is used to calculate irrigation water requirement. So the need for irrigation water and raw water is the outflow that must be fulfilled by the reservoir. Outflow is used to generate power PLTMH. In planning the reservoir operation rules, all data inputs are analyzed using simulation method of operation rules of reservoir based on Rule Curve characteristics. From the calculation of the dependable debit, obtained average debit of 4,411 m3/sec. For irrigation water requirements obtained an average discharge of 0,852 lt/dt/ha or 4,260 m3/sec and raw water of 0,853 m3/sec. The result of simulation result of Budong – Budong dam operation rules resulted average debit 32,091 m3/sec from various condition of reliability (26,02%, 50,68%, 75,34%, 97,30%). With a discharge discharge of 32,091 m3/sec yields an average power of 0,624 MW and an electrical energy of 14.983 MWh.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2017/1031/051711617
Uncontrolled Keywords: Keandalan Debit, Simulasi Waduk, Pedoman Operasi, Pola Operasi Waduk
Subjects: 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.8 Dams and reservoirs
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Budi Wahyono Wahyono
Date Deposited: 12 Dec 2017 07:01
Last Modified: 08 Oct 2020 07:08
URI: http://repository.ub.ac.id/id/eprint/6879
Full text not available from this repository.

Actions (login required)

View Item View Item