Analisis Monitoring Pelaksanaan Pekerjaan Proyek Pasar Rakyat Bareng Kota Malang

Andardi, Faris Rizal (2017) Analisis Monitoring Pelaksanaan Pekerjaan Proyek Pasar Rakyat Bareng Kota Malang. Magister thesis, Universitas Brawijaya.

Abstract

Pekerjaan proyek pasar Rakyat Bareng dilakukan monitoring untuk melihat kemajuan yang telah dicapai dan biaya yang dikeluarkan. Monitoring pekerjaan pembangunan memerlukan sebuah metode pendekatan, seperti kurva S, Earned value, dan Tracking. Ketiga metode diatas digunakan untuk analisis monitoring pelaksanaan pekerjaan proyek pasar Rakyat Bareng kota Malang. Setelah dilakukan analisa terhadap pasar Rakyat Bareng di kota Malang dengan metode kurva S didapatkan bahwa pada minggu ke-1 sampai minggu ke-16 proyek mengalami percepatan, sedangkan pada minggu ke-17,18, dan 19 proyek mengalami keterlambatan. Pada minggu ke-20 pekerjaan proyek mengalami percepatan sampai pada minggu terakhir yaitu minggu ke 22. Hasil analisa menggunakan metode Earned value, penyimpangan jadwal yang berbeda dengan rencana terjadi pada minggu ke 17,18,19 atau terjadi keterlambatan, dan sisa minggu lainnya mengalami percepatan. Sedangkan, hasil analisa menggunakan metode tracking pada saat minggu ke-1 sampai minggu ke-3 proyek mengalami percepatan, dan sisa minggu lainnya proyek mengalami keterlambatan. Berdasarkan pada analisa perhitungan menggunakan ketiga metode yaitu kurva S, Earned value, dan Tracking, kurva S dan Earned value mempunyai kekurangan jika dibandingkan dengan metode tracking sehingga rekomendasi metode monitoring yang sesuai untuk pasar Rakyat Bareng adalah Tracking. Selanjutnya, metode Kurva S dan Earned value dilakukan pendekatan pengembangan sederhana sederhana guna menjawab indikator yang sebelumnya dibuat oleh peneliti.

English Abstract

The Project of Rakyat Bareng market in Malang is conducted to monitor progress and costs. Development monitoring work requires a method approach, such as the S curve, Earned Value, and Tracking. The above three methods are used to monitor the analysis of market project implementation in Pasar Malang. After analyzing the Project of Rakyat Bareng market with the S curve method it is found that in the first week until the 16th week the project is accelerated, while in the 17th and 18th week, and 19 projects are late. At the 20th week of the project work is accelerated until the last week of the 22nd week. The results of analysis using Earned Value method, deviation schedule is different from the plan that occurred at week 17,18,19 or late, and the rest accelerated. Meanwhile, the analysis results using the tracking method in the first week until the 3rd week of the project is accelerated, and the rest is late. Based on the calculation analysis using the three S curve method, Earned Value, and Tracking, the S curv and Earned value have deficiencies when compared to the tracking method so that the recommendation of the appropriate monitoring method for the project of Rakyat Bareng is Tracking. Furthermore, Curve S and Earned Value method is done with a simple development approach to answer indicators previously made by researchers.

Item Type: Thesis (Magister)
Identification Number: TES/711.552 /AND/a/2017/041705304
Uncontrolled Keywords: MARKETS - PLANNING, INDONESIA - MALANG
Subjects: 700 The Arts > 711 Area planning (civic art) > 711.5 Specific kinds of areas > 711.55 Functional areas > 711.552 Commercial and industrial areas
Depositing User: Nur Cholis
Date Deposited: 21 Jul 2017 02:23
Last Modified: 22 Dec 2020 00:49
URI: http://repository.ub.ac.id/id/eprint/457
[thumbnail of BAGIAN DEPAN.pdf] Text
BAGIAN DEPAN.pdf
Restricted to Repository staff only

Download (994kB)
[thumbnail of 6.BAB I.pdf] Text
6.BAB I.pdf
Restricted to Repository staff only

Download (103kB)
[thumbnail of 7.BAB II.pdf] Text
7.BAB II.pdf
Restricted to Repository staff only

Download (1MB)
[thumbnail of 8.BAB III.pdf] Text
8.BAB III.pdf
Restricted to Repository staff only

Download (267kB)
[thumbnail of 9.BAB IV.pdf] Text
9.BAB IV.pdf
Restricted to Repository staff only

Download (779kB)
[thumbnail of 10.BAB V.pdf] Text
10.BAB V.pdf
Restricted to Repository staff only

Download (2MB)
[thumbnail of 11.BAB VI.pdf] Text
11.BAB VI.pdf
Restricted to Repository staff only

Download (94kB)
[thumbnail of 12.DAFTAR PUSTAKA.pdf] Text
12.DAFTAR PUSTAKA.pdf
Restricted to Repository staff only

Download (201kB)

Actions (login required)

View Item View Item