Cahyani, Yunike Dwi (2017) Analisis Kelayakan Ekonomi Tinggi Tanggul Ekonomis Pengendali Banjir Sungai Citanduy Kecamatan Wanareja Jawa Tengah. Sarjana thesis, Universitas Brawijaya.
Abstract
Daerah yang merupakan Daerah Aliran Sungai (DAS) Citanduy, khususnya kecamatan Wanareja terdapat suatu sungai yang hamper setiap musim hujan mengalami banjir. Air banjir akan menggenangi daerah persawahan dan pemukiman warga. Banjir ersebut mengakibatkan kerugian hingga milyaran rupiah di daerah Wanareja, sehingga daerah ini perlu di bangun pengendali banjir agar tehindar dari bahaya banjir. Pembangunan bangunan pengendali sungai pada daerah Wanareja ini merupakan pembangunan tanggul. Langkah awal yang dilakukan dalam studi perencanaan bangunan pengandali sungai pada Wanareja adalah analisa hidrologi. Untuk mendapatkan debit banjir rancangan digunakan metode hidrograf satuan sintetis Nakayasu untuk kala ulang 2, 10, 25, 50, 100 tahun. Menghitung tinggi muka air dengan menggunakan rumus Manning kala ulang 2, 10, 25, 50 dan 100 tahun. Untuk mengetahui apakah dimensi tanggul yang direncanakan aman, maka dipelukan suatu perhitungan kestabilan lereng. Dalam kajian ini perhitungan stabilitas lereng menggunakan metode Fellenius. Dengan menggunakan Metode HSS Nakayasu dengan kala ulang 2, 10, 25, 50 dan 100 tahun didapat debit banjir sebesar 107,961 m3/detik, 163,613 m3/detik, 191,620 m3/detik, 212,399 m3/detik dan 233,024 m3/detik. Dengan mengunakan rumus Manning kita dapat mengitung tinggi muka air dengan kala ulang 2, 10, 25, 50 dan 100 tahun. Tinggi muka air tersebut dapat digunakan untuk mengetahui tinggi tanggul yang akan direncanakan sesuai dengan kala ulang. Probabilitas pada kala ulang tersebut dapat mempengaruhi biaya resiko. Pemilihan tanggul yang paling ekonomis sangat dipengaruhi oleh biaya resiko dan biaya tahunan. Perhitungan tinggi tanggul ekonomis membuat kala ulang 25 tahun menjadi tanggul yang paling ekonomis, dengan debit 191,620 m3/detik dan tinggi tanggul 3 m. Kala Ulang 25 tahun membutuhkan total biaya sebesar Rp 3.104.246.561,50. Tinggi tanggul pada kala ulang 25 tahun ersebut dinyatakan aman dengan faktor aman tanggul sebesar 3,169.
English Abstract
The area which is Citanduy watershed (DAS), especially Wanareja district there is a river which had flood almost in every rainy season. The flood would swamp fields and residential areas. The flood effected disadvantage until billion rupiah at Wanareja, in this area need to be built flood controller so it can be spared by floods. The construction of river controller at Wanareja is embankment construction. The first step that was done in the planning of river controller in Wanareja was hydrology analysis. Getting flood discharge design was using hydrograph method Nakayasu synthetic unit for repeated 2, 10, 25, 50, 100 years. Calculating water level was using Manning formula for repeated 2, 10, 25, 50, 100 years. To know was the embankment dimension safe, it was needed a calculating of slope stability. In this review the calculating of slope stability was using Fellenius method. By using HSS Nakayasu method for repeated 2, 10, 25, 50, 100 years, flood discharge is 107,961 m3/s, 163,613 m3/s, 191,620 m3/s, 212,399 m3/detik dan 233,024 m3/s. Calculating water level was using Manning formula for repeated 2, 10, 25, 50, 100 years. Water level is used to know embankment height that will be planned same as the repeated. Probability of the repeated can affect risk cost. To choose the most economic embankment was affected by risk cost and annual fee. The calculation of economic embankment height makes repeated 25 year to be the most economic embankment, the discharge is 191,620 m3/s and embankment height is 3m. The repeated 25 years needed total cost Rp 3.104.246.561,50. Embankment height for repeated 25 years is declared safe with safe factor of embankment 3,169.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | SKR/FT/2017/991/051708834 |
Uncontrolled Keywords: | Tinggi Tanggul Ekonomis, Tanggul Banjir, Sungai Citanduy |
Subjects: | 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.4 Flood control |
Divisions: | Fakultas Teknik > Teknik Pengairan |
Depositing User: | Budi Wahyono Wahyono |
Date Deposited: | 29 Sep 2017 01:50 |
Last Modified: | 28 Nov 2024 06:37 |
URI: | http://repository.ub.ac.id/id/eprint/2966 |