Silitonga, Kevin D. E. and Ir. M. Hamzah Hasyim, ST., M.Eng.Sc. and Dr. Ir. Wisnumurti, MT. (2024) Analisis Pengoptimasian Material Baja Tulangan pada Struktur Beton Bertulang Proyek Pembangunan UIN Maulana Malik Ibrahim Malang Tahap II Gedung Fakultas Farmasi Menggunakan Metode Integer Programming. Sarjana thesis, Universitas Brawijaya.
Abstract
Suatu negara yang masuk dalam negara berkembang pasti diikuti dengan perkembangan di bidang konstruksi, perkembangan di bidang konstruksi meliputi perkembangan teknologi, inovasi dan metode. Di konstruksi, setiap penggunaan inovasi dan teknologi baru bertujuan untuk meningkatkan penggunaan material, biaya, dan waktu yang tepat. namun, masalah yang paling sering muncul dalam industri konstruksi saat ini adalah waste dari material yang digunakan. Pada penelitian ini berfokus untuk mengatasi masalah waste material baja tulangan dengan tujuan mengoptimalkan waste material baja tulangan melalui pola kombinasi alternatif baja tulangan dan persamaan integer programming. Dalam menanggulangi waste baja tulangan diawali dengan pembuatan bar bending schedule yang didasarkan pada gambar DED, pembuatan bar bending schedule didasarkan pada pengelompokan jenis pekerjaan masing-masing dan dikelompokkan lagi berdasarkan diameter tulangan. Dari bar bending schedule diperoleh kebutuhan potongan dan variasi panjang potongan tulangan. Dilanjutkan dengan pembuatan pola alternatif yang akan menjadi fungsi tujuan, fungsi pembatas dan variabel keputusan, dan dilakukan pengoptimasian dengan software QM for Windows. Dari proses pengoptimasian dengan metode integer programming yang dilakukan diperoleh pola alternatif yang paling optimal pada proyek pembangunan UIN Maulana Malik Ibrahim Malang Tahap II Gedung Fakultas Farmasi. Dengan hasil akhir kebutuhan baja tulangan sebanyak 16987 Batang (203844000 mm) Dengan Waste 1250257 mm (0,61%).
English Abstract
A developing country is typically accompanied by growth in the construction sector, which includes advancements in technology, innovation, and methods. In construction, the use of new innovations and technologies aims to optimize material usage, costs, and time efficiency. However, one of the most frequent issues in the construction industry today is the waste of materials used. This study focuses on addressing the problem of reinforcement steel material waste by optimizing it through alternative reinforcement steel combination patterns and the integer programming equation. To address the waste of reinforcement steel, the process begins with the creation of a bar bending schedule based on detailed engineering design (DED) drawings. The bar bending schedule is developed by grouping types of work and further categorizing them based on reinforcement diameters. From the bar bending schedule, the required cuts and variations in reinforcement lengths are determined. This is followed by the creation of alternative patterns that will serve as the objective function, constraint functions, and decision variables, and optimization is performed using QM for Windows software. Through the optimization process using the integer linear programming method, the most optimal alternative pattern was determined for the UIN Maulana Malik Ibrahim Malang Phase II, Faculty of Pharmacy Building construction project. The final result showed a requirement of 16,987 reinforcement bars with a waste of 1,250,257 mm or 0.61%.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 0524071462 |
Uncontrolled Keywords: | Optimalisasi, baja tulangan, integer programming. |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | S Sucipto |
Date Deposited: | 22 Oct 2024 02:48 |
Last Modified: | 22 Oct 2024 02:48 |
URI: | http://repository.ub.ac.id/id/eprint/231895 |
Text (DALAM MASA EMBARGO)
Kevin D. E. Silitonga.pdf Restricted to Registered users only Download (26MB) |
Actions (login required)
View Item |