Studi Evaluasi Kapasitas Tampungan Embung A Kipp Wilayah Ikn Kabupaten Penajam Paser Utara Provinsi Kalimantan Timur.

Viraz, Rizki Meitrio and Dr. Ir. Very Dermawan, ST., MT., IPM. and Emma Yuliani, ST., MT., Ph.D. (2024) Studi Evaluasi Kapasitas Tampungan Embung A Kipp Wilayah Ikn Kabupaten Penajam Paser Utara Provinsi Kalimantan Timur. Sarjana thesis, Universitas Brawijaya.

Abstract

Berdasarkan rencana pemerintah dalam rangka untuk melakukan pemanfaatan sumber daya air dalam menyokong kebutuhan air tanaman di KIPP (Kawasan Inti Pusat Pemerintahan), maka pemerintah berencana untuk menyediakan fasilitas penyediaan kebutuhan air untuk kawasan KIPP karena kurangnya ketersediaan air di wilayah tersebut. Salah satu upaya penyediaan kebutuhan air tersebut adalah dengan melakukan pembangunan Embung A KIPP. Bangunan penyimpan air cadangan untuk musim kemarau sangat diperlukan di daerah ini. Secara kondisi umum, KIPP berada di wilayah yang bergelombang, dilalui oleh beberapa alur sungai, dan memiliki iklim hutan tropika basah. Sehingga, pembuatan embung di wilayah ini merupakan hal yang sesuai. Dalam pembuatan desainnya, bangunan ini direncanakan oleh perusahaan konsultan Jepang dengan standar negara tersebut. Oleh karena itu, dibutuhkan analisis lebih lanjut untuk mengevaluasi debit banjir dan tinggi tubuh embung sesuai dengan pedoman atau Standar Nasional Indonesia (SNI) terhadap kondisi eksisting embung yang telah dibangun dengan standar Jepang. Analisis perhitungan studi evaluasi embung ini dilakukan agar dapat mengetahui tampungan efektif, neraca air dan tingkat keandalan embung, serta tinggi tubuh embung yang sesuai pedoman atau SNI. Adapun tahapan awal dalam evaluasi adalah melakukan analisis hidrologi untuk mendapatkan debit banjir rancangan dengan berbagai kala ulang, dan debit andalan. Selanjutnya melakukan analisis laju erosi dan sedimentasi dengan metode USLE untuk memperkirakan tampungan mati. Kemudian melakukan analisis terhadap kebutuhan air layanan embung, analisis tampungan efektif, simulasi neraca air tampungan efektif dan mencari tinggi muka air banjir sehingga bisa menghitung tinggi tubuh embung yang sesuai. Berdasarkan hasil analisis, kapasitas tampungan efektif pada Embung A KIPP didapatkan dengan mengasumsi nilai terendah dari perbandingan antara 3 parameter, yaitu tampungan berdasarkan ketersediaan air (Vh), tampungan berdasarkan kebutuhan air (Vn) dan tampungan berdasarkan topografi (Vp), sehingga diperoleh volume tampungan efektif yang sesuai adalah sebesar 54.665,38 m3 dan terletak pada elevasi +17,50 m. Hasil simulasi neraca air pada tampungan efektif Embung A KIPP dengan debit andalan Q80% dan Q90% dapat diketahui bahwa embung ini mampu melayani kebutuhan air tanaman dan pemeliharaan sungai, dengan tingkat keandalan mencapai 100%. Hasil perhitungan tinggi tubuh Embung A KIPP setelah dilakukan penjumlahan tinggi muka air kolam saat kondisi penuh, tinggi muka air banjir, tinggi jagaan dan pondasi didapatkan tinggi total embung yang sesuai adalah sebesar 7,1 m.

English Abstract

Based on the government's plan in order to utilize water resources in supporting plant water needs in KIPP (Kawasan Inti Pusat Pemerintahan), the government plans to provide water supply facilities for the KIPP area due to the lack of water availability in the area. One of the efforts to provide water needs is to build Embung A KIPP. A backup water storage building for the dry season is needed in this area. In general conditions, KIPP is located in an undulating area, traversed by several river channels, and has a wet tropical forest climate. Thus, the construction of a reservoir in this area is appropriate. In its design, the building was planned by a Japanese consulting company with the country's standards. Therefore, further analysis is needed to evaluate the flood discharge and body height of the reservoir in accordance with the guidelines or Indonesian National Standards (SNI) against the existing condition of the reservoir that has been built with Japanese standards. The calculation analysis of this reservoir evaluation study is carried out in order to determine the effective storage, water balance and reliability of the reservoir, as well as the height of the reservoir body in accordance with the guidelines or SNI. The initial stage in the evaluation is to conduct a hydrological analysis to obtain the design flood discharge with various return times, and the dependable discharge. Then analyze the rate of erosion and sedimentation with the USLE method to estimate dead storage. Then analyze the water needs of the reservoir service, analyze the effective storage, simulate the water balance of the effective storage and look for the flood water level so that it can calculate the appropriate height of the reservoir body. Based on the results of the analysis, the effective storage capacity of Embung A KIPP is obtained by assuming the lowest value of the comparison between 3 parameters, namely storage based on water availability (Vh), storage based on water demand (Vn) and storage based on topography (Vp), so that the appropriate effective storage volume is 54,665.38 m3 and is located at +17.50 m elevation. The results of the water balance simulation on the effective storage of Embung A KIPP with the dependable discharge Q80% and Q90% can be seen that this reservoir is able to serve the water needs of plants and river maintenance, with a reliability level reaching 100%. The results of the calculation of the body height of Embung A KIPP after the summation of the pond water level at full condition, flood water level, guard height and foundation obtained the appropriate total height of the embung is 7,1 m.

Item Type: Thesis (Sarjana)
Identification Number: 0524071358
Uncontrolled Keywords: Embung, Tampungan Efektif, Neraca Air, Tinggi Embung.
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: S Sucipto
Date Deposited: 28 Aug 2024 02:13
Last Modified: 28 Aug 2024 02:13
URI: http://repository.ub.ac.id/id/eprint/229537
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
Rizki Meitrio.pdf
Restricted to Registered users only

Download (24MB)

Actions (login required)

View Item View Item