Pengaruh Pembangunan Pusat Pengelolaan Sampah dan Limbah B3 (PPSLB3) Terhadap Kuantitas Sumber Air Waduk Cendoro Untuk Pemenuhan Irigasi Sawah di Desa Cendoro Kecamatan Dawarblandong Kabupaten Mojokerto

Harbiyan, Naura Rania Salsabilla and Dr. Ir. Alexander Tunggul Sutan Haji, MT and Fajri Anugroho, STP, M. Agr., Ph.D. (2024) Pengaruh Pembangunan Pusat Pengelolaan Sampah dan Limbah B3 (PPSLB3) Terhadap Kuantitas Sumber Air Waduk Cendoro Untuk Pemenuhan Irigasi Sawah di Desa Cendoro Kecamatan Dawarblandong Kabupaten Mojokerto. Sarjana thesis, Universitas Brawijaya.

Abstract

Salah satu kebutuhan dasar yang diperlukan untuk keperluan industri dan pengembangan wilayah yang semakin meningkat adalah air. Laju pembangunan yang meningkat akan menyebabkan banyak alih fungsi lahan. Untuk mengantisipasi dan mengatasi kebutuhan air yang meningkat, dibutuhkan perhitungan keseimbangan air yang dapat memperkirakan ketersediaan air dan kebutuhan air yang berimbang. Salah satu parameter untuk menentukan ketersediaan air adalah luas Daerah Tangkapan Air (DTA). Dalam penelitian ini, ketersediaan air tersebut ada pada DTA Waduk Cendoro yang digunakan langsung untuk memenuhi kebutuhan irigasi sawah milik penduduk sekitar. Pemenuhan kebutuhan irigasi diperlukan untuk memantau pendayagunaan sumber daya air yang dibutuhkan bagi keperluan lahan sawah. Waduk Cendoro terletak di sekitar lokasi rencana pembangunan fasilitas Pusat Pengelolaan Sampah dan Limbah B3 (PPSLB3). PPSLB3 ini direncanakan memiliki luas lahan sebesar 45 Ha. Lokasi pembangunan PPSLB3 yang dekat dengan wilayah DTA Waduk Cendoro dapat berpengaruh terhadap ketersediaan air, dimana Waduk Cendoro ini merupakan sumber air utama untuk memenuhi kebutuhan air irigasi bagi lahan sawah di sekitar. Dengan kemungkinan munculnya dampak akibat kegiatan pembangunan PPSLB3 yang mempengaruhi kuantitas air waduk, maka perlu dilakukan analisis untuk mengetahui seberapa besar pengaruh dampak yang mungkin terjadi. Penelitian ini bertujuan untuk mengetahui keseimbangan air eksisting pada Waduk Cendoro dan mengetahui besarnya perubahan ketersediaan air akibat pengurangan lahan DTA Waduk Cendoro yang digunakan untuk pembangunan PPSLB3, serta pengaruh perubahan ketersediaan air bagi lahan sawah yang terdampak. Penelitian ini menggunakan metode Mock, neraca air, dan analisis spasial. Hasil yang didapatkan dari analisis spasial menggunakan software ArcGIS yaitu luas DTA Waduk Cendoro sebesar 186,088 Ha dan luas sawah yang dialiri Waduk Cendoro sebesar 47,475 Ha. Kondisi eksisting keseimbangan air Waduk Cendoro mengalami surplus hanya pada bulan Januari, Februari, dan Juli. Nilai surplus terbesar pada bulan Februari dengan 63,695 liter/detik. Nilai defisit tertinggi pada bulan November sebesar -261,756 liter/detik. Neraca air pada lahan DTA yang berkurang mengalami surplus hanya pada bulan Januari, Februari, dan Juli. Nilai surplus terbesar pada bulan Februari dengan 52,049 liter/detik. Sedangkan nilai defisit tertinggi pada bulan November dengan 261,864 liter/detik. Pengurangan lahan pada DTA Waduk Cendoro tidak memiliki dampak yang signifikan, namun harus tetap dilakukan upaya konservasi air dengan metode vegetatif dan mekanik mengingat hasil perhitungan keseimbangan air yang mengalami surplus hanya ada pada bulan Januari, Februari, dan Juli.

English Abstract

One of the basic needs needed for industrial purposes and the increasing rate of regional development is water. The increasing rate of development will cause a lot of land conversion. To anticipate and overcome increasing water needs, water balance calculations which can estimate water availability and water needs in a balanced manner are needed. One of the parameters for determining water availability is catchment area. In this research, the said water availability is in the catchment area of Cendoro Reservoir which is used directly to meet the irrigation needs of rice fields belonging to local residents. Fulfilling irrigation needs is necessary to monitor the utilization of water resources needed for rice fields. Cendoro Reservoir is located around the location of the planned construction of the Waste and Hazardous Waste Management Center (PPSLB3) facilities. PPSLB3 is planned to have a land area of 45 hectares. The PPSLB3 construction location which is close to the catchment area of Cendoro Reservoir can affect its water availability, where Cendoro Reservoir is the main water source to meet irrigation water needs for surrounding rice fields. With the possibility of impacts arising from PPSLB3 construction activities that affect the quantity of Cendoro Reservoir, it is necessary to carry out an analysis to find out how big the impact might be. This research aims to determine the existing water balance in the Cendoro Reservoir and determine the magnitude of changes in its water availability due to the reduction in the catchment area of Cendoro Reservoir used for the construction of PPSLB3, as well as the effect of its land conversion in water availability for affected rice fields. This research uses Mock methods, water balance and spatial analysis. The results obtained from spatial analysis using ArcGIS software are that the catchment area of Cendoro Reservoir itself has 186,088 hectares and the area of rice fields using Cendoro Reservoir as an irrigation source is 47,475 hectares. The existing water balance condition of the Cendoro Reservoir experiences a surplus only in January, February, and July. The largest surplus value was in February with 63,695 liters/second. The highest deficit value was in November at -261,756 liters/second. The water balance on the reduced land in the catchment area of Cendoro Reservoir experienced a surplus only in January, February, and July. The largest surplus value was in February with 52,049 liters/second. Meanwhile, the highest deficit value was in November with -261,864 liters/second. Reducing land in the Cendoro Reservoir’s catchment area does not have a significant impact, but water conservation efforts must still be made using vegetative and mechanical methods considering that the results of the water balance calculation show that there is a surplus only in January, February, and July.

Item Type: Thesis (Sarjana)
Identification Number: 052410
Uncontrolled Keywords: Daerah Tangkapan Air, Waduk Cendoro, PPSLB3, Metode Mock, Neraca Air.-Catchment Area, Cendoro Reservoir, PPSLB3, Mock Method, Water Balance.
Divisions: Fakultas Teknologi Pertanian > Keteknikan Pertanian
Depositing User: Unnamed user with username nova
Date Deposited: 23 Sep 2024 06:57
Last Modified: 23 Sep 2024 06:57
URI: http://repository.ub.ac.id/id/eprint/225834
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
NAURA RANIA SALSABILLA HARBIYAN.pdf
Restricted to Registered users only

Download (3MB)

Actions (login required)

View Item View Item