Bendungan Sepaku Semoi merupakan salah satu prasarana bangunan sumber daya air yang terkoneksi dalam pembangunan di wilayah rencana Kawasan Ibu Kota Negara (KIKN) yang berfungsi baik sebagai menyediakan air baku sebesar 2.500 liter per detik dan pengendalian banjir di Sungai Tengin. Studi ini bertujuan untuk menganalisa pola operasi pengendalian banjir pada Bendungan Sepaku Semoi yang paling optimal dengan strategi early release menurunkan elevasi muka air waduk dari muka air waduk kondisi normal sebelum datangnya musim hujan berdasarkan peringatan dini dari BMKG yang terjadi selama 7 hari kedepan melalui sistem pengeluaran pada pipa pembuangan darurat atau system emergency release dengan katup Gate Valve. Dari hasil analisa untuk pengendalian banjir di Bendungan Sepaku Semoi yang paling optimal dilakukan dengan memilih skenario tinggi bukaan saluran emergency outlet dengan katup Gate Valve pada bukaan 100% untuk menurunkan Muka Air Waduk (MAW) sebesar 1 (satu) meter dari elevasi +22.00 mdpl turun ke elevasi + 21.00 mdpl dengan volume tampungan sebesar 3,159 juta m3 dan debit outflow sebesar 98,61 m3 /dt selama 6,94 hari yang mampu menambah reduksi banjir sebesar 17,6% dari 51,3% menjadi 68,9% pada kala ulang100th .
English Abstract
The Sepaku Semoi Dam is one of the connected water resource building infrastructure in development in the National Capital Region (KIKN) plan area which functions well as providing raw water of 2,500 liters per second and flood control on the Tengin River. This study aims to analyze the most optimal pattern of flood control operations at the Sepaku Semoi Dam with an early release strategy to reduce the reservoir water level from the normal condition of the reservoir water level before the arrival of the rainy season based on early warnings from the BMKG which occur during the next 7 days through the release system in. From the results of the analysis for flood control at the Sepaku Semoi Dam, the most optimal method is to choose the scenario of the height of the emergency outlet channel opening with the Gate Valve at 100% opening to lower the Reservoir Water Level (MAW) by 1 (one) meter from an elevation of +22.00 meters above sea level down to an elevation of + 21.00 meters above sea level with a storage volume of 3.159 million m3 and an outflow discharge of 98.61 m3 /s for 6.94 days which was able to increase flood reduction by 17.6% from 51.3% to 68.9% at the 100th return period.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 052407 |
Uncontrolled Keywords: | Waduk, Sistem Peringatan Dini, Perilisan Awal - Reservoir, Early Warning System, Early Release |
Divisions: | Fakultas Teknik > Teknik Pengairan |
Depositing User: | soegeng sugeng |
Date Deposited: | 11 Jul 2024 08:35 |
Last Modified: | 11 Jul 2024 08:35 |
URI: | http://repository.ub.ac.id/id/eprint/222470 |
Text (DALAM MASA EMBARGO)
Arvin Hafizh Zypa.pdf Restricted to Registered users only Download (10MB) |
Actions (login required)
View Item |