Dipayani, Ketut Ayu Santhi and Dr. Eng. Akhmad Adi Sulianto, STP., MT., M. Eng and Dr. Ir. Alexander Tunggul Sutan Haji, MT. (2024) Perencanaan Tempat Pengolahan Sampah Reduce, Reuse, Recycle (TPS 3R) di Desa Mambal Kabupaten Badung. Sarjana thesis, Universitas Brawijaya.
Abstract
Tingkat pertumbuhan penduduk di Indonesia merupakan salah satu faktor yang sangat mempengaruhi volume sampah yang dihasilkan. Jumlah penduduk yang tinggi, jenis kegiatan dan konsumsi material akan menghasilkan sampah yang banyak. Rendahnya kapasitas TPA menyebabkan berkurangnya kemampuan TPA dalam menampung sampah. Oleh karena itu, penerapan konsep Reuse, Reduce dan Recyle (3R) merupakan salah satu cara dalam menangani sekaligus mengolah sampah mulai dari sumber atau skala kawasan Pada penelitian ini, akan dilakukan perencanaan TPS 3R di Desa Mambal, Kabupaten Badung. Desa Mambal hingga saat ini belum memiliki tempat pembuangan sampah yang layak sehingga sampah open burning dan/atau dibuang langsung di tanah kosong atau jurang. Tujuan tugas akhir adalah untuk mengetahui kondisi timbulan dan komposisi sampah di Desa Mambal Kabupaten Badung dan mengetahui hasil desain layout tempat pengolahan sampah tempat pengolahan sampah dengan prinsip reduce, reuse, dan recycle (TPS 3R) di Desa Mambal Kabupaten Badung. Perencanaan TPS 3R dilakukan dengan menggunakan metode deskriptif kuantitatif dengan beberapa analisis diantaranya analisis proyeksi jumlah penduduk, analisis proyeksi timbulan sampah, analisis komposisi sampah, analisis recovery factor (RF), analisis mass balance, analisis kebutuhan unit pengolahan/sarana prasarana dan analisis luas kebutuhan lahan. Timbulan sampah yang dihasilkan di Desa Mambal sebesar 0,503 kg/orang/hari atau 3,25 liter/orang/hari. Terdiri atas 64% sampah organik, 20% sampah plastik, 7% sampah kardus, 3% sampah kertas, 3% sampah sterofoam, 1% kaca, 1% kain dan 1% lainnya. TPS 3R yang direncanakan memili luas lahan sebesar 812,05 m2 yang terbagi menjadi dari 18 unit/ruang yaitu ruang penerimaan dan pemilahan sampah, ruang penerimaan dan pemilahan sampah organik, ruang pencacahan sampah organik, ruang pengomposan, ruang pengayakan kompos, tempat kompos ruang penerimaan sampah plastik, ruang pemilahan sampah plastik, ruang penerimaan sampah kardus dan kertas, ruang pemilahan sampah kardus dan kertas. Terdapat sarana penunjang yaitu gudang, ruang residu, kantor, WC, pos jaga, garasi, toko dan tempat alat.
English Abstract
The population growth rate in Indonesia is one of the factors that greatly affect the volume of waste generated. A high population, types of activities, and material consumption will generate a lot of waste. The low capacity of the landfill causes a reduction in the ability of the landfill to accommodate waste. Therefore, the application of the Reuse, Reduce, and Recycle (3R) concept is one way to handle and process waste starting from the source or regional scale In this study, a TPS 3R planning will be carried out in Mambal Village, Badung Regency. Until now, Mambal Village does not have a proper landfill so the waste is open burning and/or disposed of directly on vacant land or ravines. The purpose of the final project is to determine the condition of waste generation and composition in Mambal Village, Badung Regency, and to determine the results of the layout design of a waste processing site for waste processing with the principles of reduction, reuse, and recycling (TPS 3R) in Mambal Village, Badung Regency. TPS 3R planning is carried out using quantitative descriptive methods with several analyses including analysis of population projections, analysis of waste generation projections, analysis of waste composition, recovery factor (RF) analysis, mass balance analysis, analysis of processing unit needs/infrastructure facilities, and analysis of land requirements. The waste generated in Mambal Village is 0.503 kg/person/day or 3.25 liters/person/day. It consists of 64% organic waste, 20% plastic waste, 7% cardboard waste, 3% paper waste, 3% styrofoam waste, 1% glass, 1% cloth and 1% others. The planned TPS 3R has a land area of 812.05m2 which is divided into 18 units/rooms, namely the waste reception and sorting room, organic waste reception and sorting room, organic waste shredding room, composting room, compost sifting room, compost bin, plastic waste reception room, plastic waste sorting room, cardboard and paper waste reception room, cardboard and paper waste sorting room. There are supporting facilities, namely a warehouse, residue room, office, restroom, guard post, garage, shop, and tool shed.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 0524100029 |
Uncontrolled Keywords: | Perencanaan, Persampahan, Tempat Pengolahan Sampah 3R.Design, Garbage, 3R Garbage Treatment Plant |
Divisions: | Fakultas Teknologi Pertanian > Keteknikan Pertanian |
Depositing User: | soegeng sugeng |
Date Deposited: | 29 Apr 2024 08:15 |
Last Modified: | 29 Apr 2024 08:15 |
URI: | http://repository.ub.ac.id/id/eprint/218131 |
Text (DALAM MAS EMBARGO)
Ketut Ayu Santhi Dipayani.pdf Restricted to Registered users only Download (4MB) |
Actions (login required)
View Item |