Luthfiyana, Hana and Prof. Dr. Ir. Bambang Suharto,, MS and Dr. Ir. Alexander Tunggul Sutan Haji,, MT (2024) Analisis Penyiapan Lahan Pada Pembangunan Pusat Pengolahan Sampah Dan Limbah B3 (PPSLB3) di Kabupaten Mojokerto, Provinsi Jawa Timur. Magister thesis, Universitas Brawijaya.
Abstract
Permasalahan lingkungan yang ada di Provinsi Jawa Timur yaitu belum optimalnya pengelolaan sampah dan limbah Bahan Berbahaya dan Beracun (B3) serta belum tersedianya pusat pengelolaan limbah B3. Provinsi Jawa Timur Berdasarkan Rencana Induk Pembangunan Industri Nasional (RIPIN), merupakan salah satu Wilayah Pusat Industri (WPI) Nasional. Karena hal tersebut perlu adanya pengelolaan limbah B3 di Provinsi Jawa Timur, Pengelolaan Limbah B3 sendiri adalah kegiatan yang meliputi pengurangan, penyimpanan, pengumpulan, pengangkutan, pemanfaatan, pengolahan, dan/atau penimbunan. Pengelolaan Limbah B3 diatur dalam Peraturan Menteri Lingkungan Hidup No. 6 Tahun 2021, tentang tata cara dan persyaratan pengelolaan Limbah B3. Berdasarkan kondisi tersebut, peneliti melakukan kajian dan studi terkait penyiapan lahan yang dibutuhkan dalam pembangunan Pusat Pengolahan Sampah dan Limbah B3 (PPSLB3). Penyiapan lahan yang dilakukan dilihat berdasarkan kebijakan, kondisi, dan persyaratan yang dibutuhkan dalam pembangunan PPSLB3. Metode penelitian ini menggunakan metode deskriptif kuantitatif, dimana deskriptif dijelaskan dengan metode analisis spasial dan kuantitatif dihasilkan dari analisis karakteristik, kriteria persyaratan, dan kriteria kesesuaian lahan, berupa output adalah rencana pengelolaan Limbah B3 dan perencanaan penyiapan lahan yang dibutuhkan pada lokasi pembangunan PPSLB3 Provinsi Jawa Timur. Hasil dari penelitian yaitu lokasi pembangunan PPSLB3 merupakan lokasi yang sesuai menurut peraturan yang ada dan RTRW, serta dibutuhkan adanya penyiapan lahan untuk pembangunan PPSLB3 yaitu land clearing lahan, cut and fill lahan, pembuatan tanggul batas area landfill, pembuatan sistem saluran drainase, dan pembuatan saluran lindi.
English Abstract
Environmental problems in East Java Province include the lack of optimal management of waste and hazardous and toxic waste (B3) and the unavailability of a B3 waste management center. Based on the National Industrial Development Master Plan (RIPIN), East Java Province is one of the National Industrial Center Regions. Because of this, it is necessary to manage B3 waste in East Java Province. B3 waste management itself is an activity that includes reduction, storage, collection, transportation, utilization, processing, and/or landfill. B3 Waste Management is regulated in Minister of Environment Regulation No. 6 of 2021, concerning procedures and requirements for managing B3 waste. Based on these conditions, researchers conducted studies and research related to preparing the land needed for the construction of the B3 Waste and Waste Processing Center (PPSLB3). The land preparation carried out is based on the policies, conditions, and requirements needed for the construction of PPSLB3. This research method uses a quantitative descriptive method, where the descriptive method is explained using spatial and quantitative analysis methods resulting from analysis of characteristics, requirement criteria, and land suitability criteria, in the form of output is a B3 Waste management plan and land preparation planning required at the PPSLB3 construction site in East Java Province. The results of the research are that the PPSLB3 construction location is a suitable location according to existing regulations and the RTRW, and land preparation is required for the construction of PPSLB3, namely land clearing land, cutting, and filling land, making embankments bordering the landfill area, making a drainage system, and making channels leachate.
Item Type: | Thesis (Magister) |
---|---|
Identification Number: | 042410 |
Uncontrolled Keywords: | Limbah B3, Penyiapan Lahan, Provinsi Jawa Timur, PPSLB3 |
Divisions: | S2/S3 > Magister Keteknikan Pertanian, Fakultas Teknologi Pertanian |
Depositing User: | Unnamed user with username nova |
Date Deposited: | 05 Mar 2024 06:29 |
Last Modified: | 05 Mar 2024 06:29 |
URI: | http://repository.ub.ac.id/id/eprint/216889 |
![]() |
Text (DALAM MASA EMBARGO)
Hana Luthfiyana.pdf Restricted to Registered users only Download (47MB) |
Actions (login required)
![]() |
View Item |