Fatullah,, Pangeran and Ir. Teguh Utomo,, M.T. and Ir. Unggul Wibawa,, M.Sc., IPU. (2022) Perbaikan Jatuh Tegangan dan Rugi Daya Pada Penyulang Belanda Sub Penyulang Bukit Kapur Di UP3 Dumai Menggunakan Kapasitor Bank,. Sarjana thesis, Universitas Brawijaya.
Abstract
RINGKASAN Pangeran Fatullah, Departemen Teknik Elektro, Fakultas Teknik Universitas Brawijaya, Juni 2022, Perbaikan Jatuh Tegangan dan Rugi Daya Pada Penyulang Belanda Sub Penyulang Bukit Kapur Di UP3 Dumai Menggunakan Kapasitor Bank, Dosen Pembimbing: Teguh Utomo dan Unggul Wibawa. Pada penyulang Belanda sub penyulang Bukit Kapur memiliki total panjang saluran sejauh 96,777 kms serta PT. Harap Panjang memiliki beban induktif yang cukup banyak, sehingga penggunaan energi listrik yang dikonsumsi PT. Harap Panjang pada penyulang Belanda semakin membesar. Maka jatuh tegangan dan rugi daya sering kali terjadi pada penyulang Belanda sub penyulang Bukit Kapur. Oleh karena itu, dilakukan perbaikan menggunakan kapasitor bank melalui software ETAP 16.0. Hasil analisis pertama jatuh tegangan pada penyulang Belanda sub penyulang Bukit Kapur sebesar 11,58% serta rugi daya sebesar 232,2 kW dan 263,2 kVAR. Perbaikan jatuh tegangan dan rugi daya penyulang Belanda sub penyulang Bukit Kapur tersebut dilakukan dengan pemberian kompensasi injeksi daya reaktif menggunakan kapasitor bank sebanyak 6 unit dengan kapasitas yang berbeda-beda melalui analisis OCP (Optimal Capacitor Placement). Hasil perbaikan jatuh tegangan dan rugi daya pada penyulang Belanda sub penyulang Bukit Kapur setelah diberikan kapasitor bank menurun menjadi 4,37% serta rugi daya menurun menjadi 176,7 kW dan 190,7 kVAR. Kata kunci: Jatuh tegangan, rugi daya, kapasitor bank, Optimal Capacitor Placement (OCP)
English Abstract
SUMMARY Pangeran Fatullah, Department of Electrical Engineering, Faculty of Engineering University of Brawijaya, June 2022, Repair Drop Voltage and Power Loss in The Belanda Feeder Sub Bukit Kapur Feeder at UP3 Dumai Using a Capacitor Bank, Academic Supervisor: Teguh Utomo and Unggul Wibawa. Keywords: Drop voltage, power loss, capacitor bank, Optimal Capacitor Placement (OCP) In the Belanda feeder the Bukit Kapur sub feeder has a total channel length of 96,777 kms and PT. Harap Panjang has quite a lot of inductive loads, so the use of electrical energy consumed by PT. Harap Panjang on the Belanda feeder is getting bigger. So drop voltage and power losses often occur in the Belanda feeder the Bukit Kapur sub feeder. Therefore, improvements were made using a capacitor bank through the ETAP 16.0 software. The results of the first analysis showed that the drop voltage on the Belanda feeder the Bukit Kapur sub feeder was 11.58% and the power loss was 232.2 kW and 263.2 kVAR. The improvement of the drop voltage and power loss of the Bukit Kapur Belanda feeder was carried out by compensating for reactive power injection using 6 units of capacitor banks with different capacities through OCP (Optimal Capacitor Placement) analysis. The result of improving the drop voltage and power losss on the Belanda feeder, the Bukit Kapur sub feeder after being given a capacitor bank, decreased to 4.37% and the power loss decreased to 176.7 kW and 190.7 kVAR.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 052307 |
Uncontrolled Keywords: | Jatuh tegangan, rugi daya, kapasitor bank, Optimal Capacitor Placement (OCP) |
Divisions: | Fakultas Teknik > Teknik Elektro |
Depositing User: | Unnamed user with username saputro |
Date Deposited: | 19 Jan 2024 03:13 |
Last Modified: | 19 Jan 2024 09:20 |
URI: | http://repository.ub.ac.id/id/eprint/212364 |
Text (DALAM MASA EMBARGO)
Pangeran Fatullah.pdf Restricted to Registered users only until 31 December 2024. Download (4MB) |
Actions (login required)
View Item |