Perencanaan Tempat Penyimpanan Sementara (TPS) Limbah Bahan Berbahaya Dan Beracun (B3) PT. Pelabuhan Indonesia (Persero) Regional II Banten

Rifky Achmad, Mustasyar, and Putri Setiani, ST, MES, Ph.D and Satwika Desantina M., ST, MT (2023) Perencanaan Tempat Penyimpanan Sementara (TPS) Limbah Bahan Berbahaya Dan Beracun (B3) PT. Pelabuhan Indonesia (Persero) Regional II Banten. Sarjana thesis, Universitas Brawijaya.

Abstract

Pelabuhan merupakan akses dari transportasi laut yang memungkinkan pengiriman barang dalam jumlah yang sangat besar, baik itu antar daerah atau antara negera dengan menggunakan kapal. Pelabuhan Banten merupakan pintu masuk utama bagi komoditas gandum yang berasal dari mancanegara. Limbah B3 industri merupakan salah satu sumber yang dapat menimbulkan pencemaran lingkungan.. Pemerintahan Nomor 22 Tahun 2021 menjelaskan bahwa setiap orang atau perusahaan yang menghasilkan limbah B3 wajib melakukan penyimpanan limbah B3. Oleh karena itu, peneliti melakukan perencanaan pengelolaan limbah B3 dan perancangan tempat penyimpanan sementara (TPS) limbah B3 sesuai dengan Pemerintahan Nomor 22 Tahun 2021. Metode yang digunakan pada penelitian ini adalah metode analisis Kuantitatif Desktriptif. Hasil penelitian ini adalah Pelindo Banten, limbah B3 yang masuk dihasilkan berasal dari masing-masing anak perusahaan. Lalu, limbah tersebut diangkut menggunakan mobil operasional, dan disimpan oleh masing –masing anak perusahaan. Limbah Bahan Berbahaya dan Beracun (B3) yang dihasilkan oleh PT. Pelabuhan Indonesia (Pelindo) terdapat 2 jenis yaitu spesifik dan non – spesifik. Berat total limbah B3 PT Pelabuhan Indonesia Regional Banten selama setahun adalah sebesar 3.804,96 kg. Direncanakan adanya perubahan pada bangunan Reception Facilities (RF) terdiri dari 4 bangunan utama. Bangunan pertama direncanakan rekonstruksi tempat cuci kendaraan angkut B3, bangunan kedua direncanakan penguatan bangunan 2 yaitu TPS limbah B3 dan dilanjut dengan bangunan ketiga yaitu gudang RF. Dan pembangunan bangunan yang terakhir adalah rumah untuk secondary tank .Berdasarkan perhitungan RAB untuk perencanaan TPS limbah B3 terdapat 6 jenis pekerjaan yaitu, pekerjaan persiapan, lalu kedua terdapat pekerjaan pondasi, ketiga terdapat pekerjaan struktur, keempat terdapat kegiatan pekerjaan dinding, kelima terdapat kegiatan pekerjaan lantai, dan yang terakhir kegiatan pekerjaan atap. Total estimasi rencana anggaran biaya pada pembangunan TPS B3 sebesar Rp 629.649.102.

English Abstract

The port is an access to sea transportation that allows the delivery of goods in very large quantities, be it between regions or between countries by ship. The Port of Banten is the main entry point for wheat commodities originating from abroad. Industrial B3 waste is a source that can cause environmental pollution. Government Number 22 of 2021 explains that every person or company that produces B3 waste is required to store B3 waste. Therefore, the researchers carried out a B3 waste management plan and designed a temporary B3 waste storage area (TPS) in accordance with Government Number 22 of 2021. The method used in this research is descriptive quantitative analysis method. The results of this study are Pelindo Banten, the incoming B3 waste comes from each subsidiary. Then, the waste is transported using operational cars, and stored by each subsidiary. Hazardous and Toxic Waste (B3) produced by PT. There are 2 types of Indonesian Ports (Pelindo), namely specific and non-specific. The total weight of B3 waste from PT Pelabuhan Indonesia Regional Banten for a year is 3,804.96 kg. It is planned that there will be changes to the Reception Facilities (RF) building consisting of 4 main buildings. The first building is planned for the reconstruction of the washing place for B3 transport vehicles, the second building is planned for the strengthening of building 2, namely the B3 waste TPS and continued with the third building, namely the RF warehouse. And the construction of the last building is a house for the secondary tank. Based on the calculations of the RAB for the B3 waste TPS planning, there are 6 types of work, namely, preparatory work, second is foundation work, third is structural work, fourth is wall work, fifth is floor work. , and finally roofing work activities. The total estimated budget plan for the construction of TPS B3 is IDR 629,649,102.

Item Type: Thesis (Sarjana)
Identification Number: 052310
Uncontrolled Keywords: Pengelolaan Limbah B3, Perencanaan Tempat Penampungan Sementara, PT. Pelabuhan Indonesia II (Persero) Regional Banten. Hazardous Waste Management, Temporary Shelter Planning, PT. Pelabuhan Indonesia II (Persero) Regional Banten.
Divisions: Fakultas Teknologi Pertanian > Keteknikan Pertanian
Depositing User: Unnamed user with username verry
Date Deposited: 18 Jan 2024 02:10
Last Modified: 18 Jan 2024 02:10
URI: http://repository.ub.ac.id/id/eprint/211811
[thumbnail of Dalam Masa Embargo] Text (Dalam Masa Embargo)
Rifky Achmad Mustasyar.pdf
Restricted to Registered users only until 31 December 2025.

Download (6MB)

Actions (login required)

View Item View Item