Analisis Sisa Material Konstruksi Berbasis Konsep Ekonomi Sirkular (Studi Kasus : Proyek Pembangunan Gedung Tower At-Ta’awun UMS dan Proyek Pembangunan Gedung Smart Automation Workshop PENS)

Zahra, Salsabila Yurita Permata and Ir. Kartika Puspa Negara, ST., MT., Ph.D and Ir. M. Hamzah Hasyim, ST., M.Eng.Sc. (2023) Analisis Sisa Material Konstruksi Berbasis Konsep Ekonomi Sirkular (Studi Kasus : Proyek Pembangunan Gedung Tower At-Ta’awun UMS dan Proyek Pembangunan Gedung Smart Automation Workshop PENS). Sarjana thesis, Universitas Brawijaya.

Abstract

Seiring dengan pertumbuhan infrastruktur gedung yang terus meningkat, produksi sisa material konstruksi pun juga ikut meningkat sehingga sektor ini dapat menjadi penyumbang besar sisa material dan memiliki potensi daur ulang yang signifikan. Timbulnya sisa material konstruksi pada suatu proyek dapat berpotensi sebagai ancaman serius bagi pihak proyek, masyarakat, dan lingkungan. Perencanaan bangunan yang kurang tepat dan proses bongkar muat material yang kurang baik dapat menimbulkan kerusakan yang membuat material tersebut tidak dapat digunakan kembali. Disisi lain, ketersediaan lahan proyek yang kurang memadai dapat menyulitkan penyimpanan material dan dapat menurunkan kualitas material. Munculnya sisa material konstruksi atau yang disebut dengan waste material construction dapat memicu permasalahan baru serta pembengkakan pada sektor pembiayaan. Untuk meminimalisir dampak negatif terhadap lingkungan pada bidang konstruksi, dapat dilakukan dengan menerapkan konsep keberlanjutan dalam seluruh siklus proyek, mulai dari tahap perencanaan dan desain, konstruksi, tahap operasi dan renovasi untuk pembongkaran pada akhirnya. Salah satu upaya untuk mewujudkan konsep keberlanjutan dalam bidang konstruksi yaitu dengan menerapkan konsep ekonomi sirkular. Penelitian ini dilakukan pada Proyek Pembangunan Gedung Tower At-Ta’awun UMS dan Proyek Pembangunan Gedung Smart Automation Workshop PENS dengan metode pengumpulan data berupa penyebaran kuesioner dan wawancara. Tujuan dari penelitian ini adalah mengetahui sisa material dominan, penyebab sisa material dominan, dan solusi yang dapat dilakukan untuk meminimalisir sisa material konstruksi dominan dengan konsep ekonomi sirkular pada proyek yang bersangkutan. Hasil dari penelitian ini menunjukkan bahwa sisa material dominan adalah material kayu dan keramik, penyebab sisa material kayu disebabkan oleh kesalahan pemesanan dan penyebab sisa material keramik disebabkan oleh sisa pemotongan material tidak dapat digunakan lagi. Solusi yang dapat dilakukan untuk meminimalisir sisa material konstruksi dengan konsep ekonomi sirkular adalah dengan cara selektif dalam mencari material yang dapat didaur ulang atau digunakan kembali (Rethink), melakukan pengolahan/pemulihan pada material sisa yang masih dapat digunakan untuk memperpanjang masa pakai material tersebut (Refurbish), eminimalisir penggunaan material untuk menekan jumlah sisa material yang dihasilkan (Reduce), dan menggunakan kembali material (Reuse)

English Abstract

As building infrastructure continues to grow, the production of material waste construction is also increasing, this sector can become a large contributor to waste material and has significant recycling potential. The emergence of leftover construction materials in a project can potentially be a serious threat to the project, the community, and the environment. Inappropriate building planning and poor material loading and unloading processes can cause damage that makes the material unusable. On the other hand, inadequate availability of project land can complicate material storage and reduce material quality. The appearance of leftover construction materials or what is known as waste material construction can trigger new problems and swelling in the financing sector. To minimize negative impacts on the environment in the construction sector, this can be done by applying the concept of sustainability in the entire project cycle, starting from the planning and design stages, construction, operation and renovation stages to eventual demolition. One of the efforts to realize the concept of sustainability in the construction sector is by applying the circular economy concept. This research was conducted at the UMS At-Ta'awun Tower Building Project and Smart Automation Workshop PENS Project with data collection methods in the form of distributing questionnaires and interviews. The purpose of this study is to find out the dominant material residue, the causes of the dominant material residue, and solutions that can be made to minimize the dominant construction material residue with the concept of circular economy in the project concerned. The results of this study show that the dominant remaining material is wood and ceramic material, the cause of the remaining wood material is due to ordering errors and the cause of the remaining ceramic material is caused by the remaining cutting material that cannot be used anymore. The solution that can be done to minimize the remaining construction materials with the circular economy concept is by being selective in finding materials that can be recycled or reused (Rethink), processing/recovering the remaining materials that can still be used to extend the useful life of these materials (Refurbish ), minimize the use of material to reduce the amount of remaining material produced (Reduce), and reuse material (Reuse).

Item Type: Thesis (Sarjana)
Identification Number: 052307
Uncontrolled Keywords: Infrastruktur, proyek pembangunan gedung, sisa material, penyebab sisa material, konsep ekonomi sirkular-Infrastructure, building construction projects, waste materials, causes waste materials, circular economy concept
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Emy Sukartini
Date Deposited: 17 Jan 2024 04:38
Last Modified: 17 Jan 2024 04:38
URI: http://repository.ub.ac.id/id/eprint/211398
[thumbnail of Dalam masa EMBARGO] Text (Dalam masa EMBARGO)
Salsabila Yurita Permata Zahra.pdf
Restricted to Registered users only until 31 December 2025.

Download (5MB)

Actions (login required)

View Item View Item