Dalahmas, Muhammad Diva and Dr. Eng. Tri Budi Prayogo, ST., MT and Ir. Dian Sisinggih, ST., MT., Ph.D. (2023) Analisa Hidrolika Uji Model Test Pelimpah Bendungan Pelosika Kabupaten Konawe Sulawesi Tenggara. Sarjana thesis, Universitas Brawijaya.
Abstract
Kabupaten Konawe merupakan salah satu kabupaten di Provinsi Sulawasi Selatan, yang dimana sebelumnya kabupaten ini bernama kabupaten kendari. Kabupaten Konawe mempunyai beberapa sungai yang cukup potensial untuk pengembangan pertanian, irigasi, dan pembangkit tenaga listrik, salah satunya yaitu sungai Konaweeha, Sungai Lahumbuti, Sungai Lapoa, Sungai Lasolo, Sungai Kokapi, Sungai Toreo, Sungai Andumowu dan Sungai Molawe. Dalam prosesnya sungai-sungai yang potensial ini dapat menjadi sebuah permasalahan pada saat musim penghujan. Hal ini dikarenakan kurangnya pengolahan terhadap sumber daya alam ini yang mengakibatkan kemungkinan terjadinya banjir pada saat musim penghujan semakin tinggi. Salah satu desa yang merasakan dampaknya ialah Desa Wonoamonapa, kecamatan Pondidaha, hal tersebut dilansir di suara.com pada bulan agustus 2021. Salah satu langkah untuk menangani permasalahan pengolahan ini, direncanakan bendungan Pelosika yang berlokasi di Sungai Konaweha, Kabupaten Konawe, Sulawesi Selatan sebagai upaya konservasi air dan pemanfaatan sumber air sebagai pengairan irigasi dan pembangkit tenaga listrik. Dalam menyempurnakan perencanaannya dilakukan uji model fisik di Laboratorium Hidrolika Terapan Universita Brawiajya. Model test Bendungan Pelosika ialah bangunan model berskala lebih kecil dari Bendungan Pelosika dengan mengikuti prinsip kesebangunan hidrolis dengan memenuhi parameter-parameter yang sesuai dengan banjir rancangan yang sudah ditentukan yaitu mulai dari Q100th, Q500th, QPMF. Hal ini bertujuan untuk penyempurnaan desain dari Bendungan Pelosika sesuai dengan kaidah hidrolika yang berlaku. Studi ini dilakukan dengan mula-mula membangun konstruksi model fisik dari Bendungan Pelosika sesuai dengan data teknis Bendungan Pelosika dari konsultan terkait. Kemudian dibangun dengan skala 1:50 yang sudah mempertimbangkan ketelitian dan fasilitas yang tersedia pada Laboratorium Hidrolika Terapan. Setelah itu, dilakukan pengujian pada model test meliputi pengukuran muka air, kecepatan, tekanan hidrostatis, operasi bukaan pintu, dan fenomena yang terjadi pada model fisik Bendungan Pelosika. Mula-mula dilakukan running seri 0 sesuai dengan desain perencanaan awal untuk menilai kaidah hidrolika dari desain awal, kemudian terdapat ketidak sesuain dengan kaidah hidrolika. Kemudian dilakukan penyempurnaan desain diantaranya dengan perbaikan bangunan pengarah.
English Abstract
Konawe Regency is one of the regencies in South Sulawesi Province, where previously it was known as Kendari Regency. Konawe Regency boasts several rivers with significant potential for agricultural development, irrigation, and power generation, such as the Konaweeha River, Lahumbuti River, Lapoa River, Lasolo River, Kokapi River, Toreo River, Andumowu River, and Molawe River. However, these potentially valuable rivers can pose issues during the rainy season due to insufficient management of these natural resources, leading to a heightened risk of flooding. One village experiencing the repercussions is Wonoamonapa Village in the Pondidaha sub-district, as reported by suara.com in August 2021. One step in addressing this processing issue involves the planned construction of the Pelosika Dam situated on the Konaweha River in Konawe Regency, South Sulawesi. This initiative aims to conserve water and utilize the water source for irrigation and power generation purposes. To refine its planning, physical model tests of the Pelosika Dam were conducted at the Applied Hydraulics Laboratory of Brawiajya University. The Pelosika Dam model test comprises a smaller-scale structure following the principles of hydraulic similarity while meeting specified parameters for design floods, ranging from Q100th, Q500th, to QPMF. This aims to perfect the design of the Pelosika Dam in accordance with established hydraulic standards. This study commenced by constructing a physical model of the Pelosika Dam based on technical data obtained from the relevant consultants. The initial model was built to a scale of 1:50, taking into account the precision required and the available facilities in the Applied Hydraulics Laboratory. Subsequently, various tests were conducted on the model, including measurements of water levels, velocity, hydrostatic pressure, gate operations, and phenomena occurring within the physical model of the Pelosika Dam. The testing began with a series of runs (series 0) in line with the initial design plan to evaluate its adherence to hydraulic principles, revealing discrepancies between the design and these principles. Thereafter, design refinements were implemented, primarily involving improvements to the guide structure.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 052307 |
Uncontrolled Keywords: | Bendungan, Model Test, Hidrolika, Operasi Pintu, Dam, Model Test, Hydraulics, Gates Operation. |
Divisions: | Fakultas Teknik > Teknik Pengairan |
Depositing User: | Zainul Mustofa |
Date Deposited: | 11 Jan 2024 01:47 |
Last Modified: | 11 Jan 2024 01:47 |
URI: | http://repository.ub.ac.id/id/eprint/207792 |