Studi Manajemen Konstruksi Proyek Pembangunan Pelimpah Pada Bendungan Bendo Kabupaten Ponorogo Menggunakan Aplikasi Microsoft Project Manager 2019 .

Muhammad, Dien Azmi and Prof. Dr. Ir. Pitojo Tri Juwono,, MT., IPU., ASEAN.Eng. and Dr. Eng. Ir. Evi Nur Cahya, ST., MT. (2023) Studi Manajemen Konstruksi Proyek Pembangunan Pelimpah Pada Bendungan Bendo Kabupaten Ponorogo Menggunakan Aplikasi Microsoft Project Manager 2019 . Sarjana thesis, Universitas Brawijaya.

Abstract

Pemerintah kabupaten Ponorogo sendiri sangat ingin mengembangkan daerahnya termasuk di bidang sumber daya air guna memenuhi berbagai keperluan masyarakat diantaranya seperti penyediaan air irigasi dan pengendalian banjir. Dengan memperhatikan kondisi yang demikian maka Pemerintah Indonesia melalui Kementerian Pekerjaan Umum dan Perumahan Rakyat melaksanakan pembangunan Bendungan Bendo yang terletak di Kali Keyang Desa Ngindeng Kecamatan Sawo Kabupaten Ponorogo. Proyek Pembangunan Pelimpah Pada Bendungan Bendo Kabupaten Ponorogo dimana dalam pelaksanaanya memiliki banyak sub item sehingga diperlukan manajemen kontruksi yang tepat agar pembangunannya dapat mencapai target secara efektif dan efisien. Waktu, biaya dan mutu merupakan tiga hal penting yang harus diperhatikan dalam suatu proyek konstruksi. . Pada studi ini untuk mempercepat waktu penyelesaian proyek digunakan metode fasttrack dan crashing. Hal tersebut dilakukan dengan cara merekayasa lintasan kritis dan melakukan percepatan penjadwalan sehingga berdampak pada efektivitas durasi proyek. Dari hasil analisa dengan metode fasttrack, dilakukan optimasi dengan menghasilkan durasi proyek yang lebih efektif yaitu 5,9% dari durasi awal kontrak dan menghasilkan biaya proyek yang lebih efisien yaitu 0,3% dari biaya proyek. Dengan menggunakan metode crashing, dilakukan optimasi dengan menambah jam kerja selama 2 jam pada sumberdaya manusianya. Dari optimasi tersebut dengan menghasilkan durasi proyek yang lebih efektif yaitu 2,9% dari durasi awal kontrak dan menghasilkan biaya proyek yang lebih efisien yaitu 0,51% dari biaya proyek. Dari hasil optimasi didapatkan hasil bahwa metode fasttrack lebih unggul dalam segi optimasi jadwal proyek. Sedangkan, metode crashing lebih unggul dalam proyeksi anggaran (biaya akhir proyek).

English Abstract

The government of Ponorogo Regency is eager to develop its region including in the field of water resources to fulfill various community needs such as irrigation water supply and flood control. By paying attention to such conditions, the Government of Indonesia through the Ministry of Public Works and Public Housing carried out the construction of the Bendo Dam which is located in Kali Keyang, Ngindeng Village, Sawo District, Ponorogo Regency. Construction project implementation requires careful planning so that it can be completed effectively and efficiently. The Spillway Development Project at the Bendo Dam in Ponorogo Regency, which has many sub-items in its implementation, requires proper construction management so that the construction can reach the target effectively and efficiently. Time, cost and quality are three important things that must be considered in a construction project. In this study, to speed up the project completion time, the fasttrack and crashing methods were used. This is done by engineering critical paths and accelerating scheduling so that it has an impact on the effectiveness of the project duration. From the results of the analysis using the fasttrack method, optimization is carried out by producing a more effective project duration, namely 5,9% the duration of the initial contract and producing a more efficient project cost, namely 0,3% of the project cost. By using the crashing method, optimization is carried out by adding 2 hours of working hours to the human resources. From this optimization, it results in a more effective project duration, namely 2,1% the duration of the initial contract and produces a more efficient project cost, namely 0,51% of the project cost. From the optimization results, it was found that the fasttrack method is superior in terms of project schedule optimization. Meanwhile, the crashing method is superior in budget projections (final project cost).

Item Type: Thesis (Sarjana)
Identification Number: 052307
Uncontrolled Keywords: Manajemen Konstruksi, Fasttrack, Crashing-Construction Management, Fasttrack, Crashing
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Unnamed user with username suprihatin
Date Deposited: 10 Jan 2024 08:23
Last Modified: 10 Jan 2024 08:23
URI: http://repository.ub.ac.id/id/eprint/207631
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
Dien Azmi Muhammad.pdf
Restricted to Registered users only until 31 December 2025.

Download (18MB)