Studi Perencanaan Manajemen Pelaksanaan Penjadwalan Pengembangan Jaringan Distribusi Air Dan Sambungan Rumah (Sr) Desa Warungdowo Kabupaten Pasuruan Provinsi Jawa Timur Dengan Menggunakan Microsoft Project Manager 2016.

Alamsyah, Muh Arsyil and Prof. Dr. Ir. Pitojo Tri Juwono, MT., IPU., ASEAN Eng and Dr. Eng. Ir. Evi Nur Cahya, ST., MT. (2023) Studi Perencanaan Manajemen Pelaksanaan Penjadwalan Pengembangan Jaringan Distribusi Air Dan Sambungan Rumah (Sr) Desa Warungdowo Kabupaten Pasuruan Provinsi Jawa Timur Dengan Menggunakan Microsoft Project Manager 2016. Sarjana thesis, Universitas Brawijaya.

Abstract

Dalam pembangunan infrastruktur diperlukan manajemen konstruksi sebagai cara agar proyek berjalan dan mencapai hasil waktu, biaya, dan mutu yang terbaik. Mengoptimalkan sumber daya secara efektif dengan menerapkan fungsi / tujuan manajemen (seperti perencanaan, penjadwalan, dan kontrol). Penulisan studi ini bertujuan untuk menganalisa percepatan proyek pengembangan jaringan distribusi dan sambungan rumah (SR) Desa Warungdowo Kecamatan Pohjentrek Kabupaten Pasuruan Provinsi Jawa Timur menggunakan Microsoft Project Manager 2016. Data didapat akan digunakan untuk perhitungan perbandingan dua alternatif analisis yang berbeda yaitu penambahan jam kerja dan penambahan alat berat dalam optimalisasi pengerjaan proyek. Hasil analisis didapatkan percepatan alternatif Pembangunan infrastruktur proyek pengembangan jaringan distribusi dan sambungan rumah (SR) Desa Warungdowo Kecamatan Pohjentrek Kabupaten Pasuruan Provinsi Jawa Timur, dengan biaya kontrak infrastuktur awal Rp.13.935.140.000,00 dengan lama pengerjaan 150 hari. Kemudian didapatkan hasil analisis menggunakan microsoft projek dalam alternatif penambahan jam kerja biaya didapatkan sebesar Rp 11,078,673,598.52 dengan durasi pengerjaan selama 147 hari. Kemudian untuk alternatif penambahan alat berat didapatkan biaya sebesar Rp 11,276,749,127.83 dengan durasi pengeerjaan selama 126 Hari. Sehingga alternatif penambahan jam kerja merupakan altenatif paling efektif dalam Pembangunan infrastruktur proyek pengembangan jaringan distribusi dan sambungan rumah (SR) Desa Warungdowo Kecamatan Pohjentrek Kabupaten Pasuruan Provinsi Jawa Timur.

English Abstract

In infrastructure development, construction management is needed as a way for projects to run and achieve the best time, cost, and quality results. Optimize resources effectively by implementing management functions/objectives (such as planning, scheduling, and control). The writing of this study aims to analyze the acceleration of the project to develop a distribution network and house connection (SR) Warungdowo Village, Pohjentrek District, Pasuruan Regency, East Java Province, using Microsoft Project Manager 2016. The data obtained will be used for comparative calculations of two different alternative analyses, namely the addition of working hours and the addition of heavy equipment in optimizing project work. The results of the analysis found an alternative acceleration of infrastructure development for the distribution network and house connection (SR) development project Warungdowo Village, Pohjentrek District, Pasuruan Regency, East Java Province, with an initial infrastructure contract cost of Rp.13,935,140,000.00 with a duration of 150 days. Then the results of the analysis using Microsoft Project in the alternative of adding working hours cost was obtained at Rp 11,078,673,598.52 with a duration of work for 147 days. Then for the alternative addition of heavy equipment, a fee of Rp 11,276,749,127.83 was obtained with a duration of work for 126 days. So that the alternative of increasing working hours is the most effective alternative in infrastructure development, distribution network development and house connection (SR) projects, Warungdowo Village, Pohjentrek District, Pasuruan Regency, East Java Province.

Item Type: Thesis (Sarjana)
Identification Number: 052307
Uncontrolled Keywords: -
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Zainul Mustofa
Date Deposited: 10 Jan 2024 02:58
Last Modified: 10 Jan 2024 02:58
URI: http://repository.ub.ac.id/id/eprint/207137
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
MUH ARSYIL ALAMSYAH.pdf
Restricted to Registered users only until 31 December 2025.

Download (50MB)

Actions (login required)

View Item View Item