Fikhoir, Yalim and Prof. Dr. Ir. Pitojo Tri Juwono, MT., IPU., ASEAN.Eng. and Dr. Eng. Ir. Evi Nur Cahya, ST., MT. (2023) Implementasi (Building Information Modelling) BIM 4D Pada Studi Penjadwalan Proyek Rehabilitasi Spillway Bendungan Pacal Di Bojonegoro Dengan Aplikasi Autodesk Naviswork Manage 2023 Dan Ms. Project 2016. Sarjana thesis, Universitas Brawijaya.
Abstract
Proyek Rehabilitasi Spillway Bendungan Pacal adalah suatu proyek yang memiliki batasan waktu dan biaya yang telah ditetapkan sebelumnya. Mengingat tingkat kompleksitasnya yang cukup tinggi, diperlukan manajemen konstruksi yang efisien agar proyek dapat berjalan dengan sukses. Penerapan metode BIM (Building Information Modeling) menjadi solusi untuk mengatasi pengelolaan, penataan, dan pengendalian proyek dengan akurat, sambil tetap memperhatikan aspek waktu dan kualitas. Dalam penelitian ini, dilakukan analisis terhadap penjadwalan untuk mempercepat proyek dengan dua alternatif pendekatan, yaitu dengan menambahkan alat berat atau menambahkan jam kerja. Hasil analisis menunjukkan bahwa kedua alternatif tersebut menghasilkan kurva S baru, masing-masing memberikan percepatan durasi sebesar 10,9% dan pengurangan biaya sebesar 14,3% untuk penambahan alat berat, serta percepatan durasi sebesar 16,3% dan pengurangan biaya sebesar 10,9% untuk penambahan jam kerja. Dibandingkan dengan kondisi eksisting yang memiliki durasi proyek selama 577 hari dan biaya sebesar Rp 50.515.620.342,00, penambahan alat berat memberikan solusi lebih optimal. Penerapan BIM 4D memungkinkan integrasi model bangunan dalam tiga dimensi dengan penjadwalan baru yang telah disusun. Dengan demikian, pemantauan pelaksanaan proyek menjadi lebih mudah karena memungkinkan pengawasan bobot pekerjaan hingga dalam skala harian secara praktis, berbeda dengan pendekatan menggunakan kurva S. Dengan demikian, penggunaan metode BIM dalam proyek Rehabilitasi Spillway Bendungan Pacal memberikan berbagai keuntungan, termasuk optimalisasi pengelolaan, penataan, dan pengendalian proyek, serta memungkinkan pemantauan yang lebih efisien dalam pelaksanaannya.
English Abstract
The Pacal Dam Spillway Rehabilitation Project is a project with predetermined time and cost constraints. Given its considerable complexity, efficient construction management is required for the project to succeed. The implementation of Building Information Modeling (BIM) provides a solution to address accurate project management, planning, and control while still considering time and quality aspects. In this study, an analysis of scheduling was conducted to expedite the project using two alternative approaches: adding heavy equipment or increasing working hours. The analysis revealed that both alternatives resulted in new S-curves, each providing a duration acceleration of 10.9% and cost reduction of 14.3% for the addition of heavy equipment, and a duration acceleration of 16.3% and cost reduction of 10.9% for increasing working hours. Compared to the existing condition with a project duration of 577 days and a cost of Rp 50,515,620,342.00, adding heavy equipment offered a more optimal solution. The implementation of 4D BIM allows for the integration of the three-dimensional building model with the newly developed schedule. As a result, monitoring the project implementation becomes more straightforward, enabling practical daily monitoring of work progress, unlike the approach using S-curves. Thus, the use of BIM in the Pacal Dam Spillway Rehabilitation Project provides various advantages, including optimizing project management, planning, and control, and facilitating more efficient monitoring during project execution.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 0523070406 |
Subjects: | 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.5 Reclamations, Irrigation, related topics > 627.52 Irrigation |
Divisions: | Fakultas Teknik > Teknik Pengairan |
Depositing User: | Endang Susworini |
Date Deposited: | 12 Oct 2023 01:48 |
Last Modified: | 12 Oct 2023 01:48 |
URI: | http://repository.ub.ac.id/id/eprint/203807 |