Wulandari, Violla Audina and Prof. Dr. Ir. Qomariyatus Sholihah, ST., M.Kes., IPU., ASEAN.Eng (2023) Analisis Risiko Keselamatan dan Kesehatan Kerja pada Proses Produksi PT.X dengan Menggunakan Metode HIRADC. Sarjana thesis, Universitas Brawijaya.
Abstract
PT. X adalah salah satu perusahaan Joint venture yang memproduksi produk kayu setengah jadi dan produk jadi yang mengkhususkan diri dalam pembuatan pintu kayu berkualitas tinggi dengan keahlian di sebagian besar produk kayu. Perusahaan belum pemah melakukan identifikasi bahaya, penilaian risiko dan pengendalian risiko terhadap aktivitas kerja pada masing-masing proses produksi tetapi perusahaan telah melakukan monitoring aspek keselamatan dan kesehatan kerja melalui program pengelolaan dan pemantauan lingkungan hidup yang dilakukan oleh Dinas Lingkungan Hidup (DLH) selama kisaran Waktu 6 bulan sekali. Hasil dari monitoring pada program pengelolaan dan pemantauan lingkungan hidup diketahui bahwa PT.X memiliki tingkat kebisingan yang melebihi nilai ambang batas yaitu lebih dari 85dBA selain itu suhu pada ruang kerja perusahaan juga termasuk dalarn kategori tinggi karena lebih dari 350 C. Hasil monitoring yang dilakukan oleh DLH tersebut juga menjabarkan bahwa adanya peningkatan potensi kecelakaan kerja serta peningkatan potensi bahaya kebakaran. Monitoring yang dilakukan oleh DLH tersebut hanya dilakukan pada titik-titik tertentu saja tidak dilakukan secara menyelumh sehingga tidak dapat dilakukan identifikasi sumber bahaya yang menyebabkan meningkatnya potensi kecelakaan kerja pada proses produksi PT.X. Oleh karena itu diperlukan manajemen risiko sebagai bentuk upaya pencegahan dan pengendalian risiko keselamatan dan kesehatan kerj a pada perusahaan. Pengendalian risiko keselamatan dan kesehatan kerja dilakukan dengan menggunakan metode Hazard Identification Risk Assessment and Determining Controls (HIRADC). Metode HIRADC digunakan agar dapat lebih rnemahami tahapan kerja pada proses produksi PT. X dan mengetahui risiko bahaya yang dimiliki pada tahapan kerja tersebut sehingga dapat rnengatasi risiko bahaya yang ada dan mengurangi peluang adanya kecelakaan kerja Hasil dari penelitian menunjukkan bahwa 20 proses produksi PT.X yang telah dilakukan identifikasi bahaya, terdapat 134 potensi bahaya yang teridentifikasi dari 66 pekerjaan yang kemudian dilakukan penggolongan hasil identifikasi bahaya sehingga diperoleh potensi bahaya sebanyak 47 bahaya. Berdasarkan hasil wawancara dan pengamatan Iangsung penilaian risiko yang diperoleh memiliki 3 level yaitu risiko rendah, risiko sedang, dan risiko tinggi. Dari hasil penilaian risiko didapatkan risiko rendah sejmnlah 4 risiko dari total 47 risiko sehingga memiliki persentase sekitar 9%. Sedangkan risiko sedang yang dihasilkan dari penilaian risiko memiliki jumlah sebesar 17 risiko dari total 47 risiko sehingga memiliki persentase sekitar 36%. Risiko tinggi yang dihasilkan dari penilaian risiko memiliki jumlah sebesar 26 risiko dari total 47 risiko sehingga memiliki persentase sekitar 55%
English Abstract
PT. X is one of the Joint venture companies producing semi-finished and finished Wood products specializing in manufacturing high quality wooden doors with expertise in most of wood products. The company has never carried out hazard identification, risk assessment and risk control of work activities in each production process, but the company has monitored occupational safety and health aspects through an environmental management and monitoring program conducted by the Environment Agency (DLH) for a period of time. once every 6 months. The results of monitoring in the environmental management and monitoring program show that PT.X has a noise level that exceeds the threshold value, which is more than 85dBA, besides that the temperature in the compa.ny‘s work space is also included in the high category because it is more than 350 C. The results of monitoring carried out by The DLH also explained that there is an increase in the potential for work accidents and an increase in the potential for fire hazards. The monitoring carried out by DLH was only carried out at certain points and was not carried out thoroughly so that it was not possible to identify the source of the hazard which caused an increase in the potential for work accidents in the production process of PT.X. Therefore, risk management is needed as a fonn of prevention and control of occupational safety and health risks in the company. Occupational safety and health risk control is carried out using the Hazard Identification Risk Assessment and Determining Controls (HIRADC) method. The HIRADC method is used in order to better understand the stages of work in the production process of PT. X and know the risk of hazards that are owned at the work stage so that they can overcome the existing hazard risks and reduce the chance of work accidents The results of the study showed that in the 20 PT.X production processes that had carried out hazard identification, there were 134 potential hazards identified from 66 jobs which were then classified according to the results of hazard identification so that 47 potential hazards were obtained. Based on the results of interviews and direct ObSC1'V3tl01’l, the risk assessment obtained has 3 levels, namely low risk, medium risk and high risk. From the results of the nsk assessment, it was found that there were 4 low risks out of a total of 47 risks, so that the percentage was around 9%. Meanwhile, the moderate risk resulting from the risk assessment has a total of l7 risks out of a total of 47 risks, so it has a percentage of around 36%. The high risk resulting from the risk assessment has a total of 26 risks out of a total of 47 risks so that it has a percentage of around 55%.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 0523070401 |
Uncontrolled Keywords: | : Keselamatan dan kesehatan kerja, HIRADC, Hazard Identification, Risk Assessment, |
Subjects: | 600 Technology (Applied sciences) > 670 Manufacturing |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Endang Susworini |
Date Deposited: | 11 Oct 2023 07:07 |
Last Modified: | 11 Oct 2023 07:07 |
URI: | http://repository.ub.ac.id/id/eprint/203796 |
Text (DALAM MASA EMBARGO)
Violla Audina Wulandari.pdf Restricted to Registered users only until 31 December 2025. Download (7MB) |
Actions (login required)