Harso, Reni Meidha and Dr.Eng. Ir. Riyanto Haribowo, ST., MT., IPM. and Emma Yuliani, ST., MT., Ph.D. (2022) Perencanaan Sistem Distribusi Air Bersih di Desa Kemiri Kecamatan Jabung Kabupaten Malang. Sarjana thesis, Universitas Brawijaya.
Abstract
Desa Kemiri Kecamatan Jabung Kabupaten Malang merupakan daerah pedesaan yang terletak di kaki Gunung Bromo. Penduduk desa yang mayoritas adalah peternak sapi perah dan penduduk desa masih mengandalkan pengambilan air secara manual untuk pemenuhan kebutuhan air sehari hari karena memang belum ada jaringan perpipaan yang memfasilitasi pendistribusian air bersih di desa tersebut, yang mana di desa tersebut pada saat musim kemarau sering mengalami krisis air bersih. Menyikapi hal tersebut dalam skripsi ini membahas tentang perencanaan sistem distribusi air bersih yang diharapkan dapat memfasilitasi dari pemenuhan kebutuhan air bersih bagi masyarakat Desa Kemiri. Rencana pendistribusian ini akan menggunakan sumber air Coban Sisir yang terletak di Desa Taji Kecamatan Jabung Kabupaten Malang yang memiliki debit sebesar 51,3 liter/detik yang digunakan untuk pendistribusian air bersih ke tiga desa. Perencanaan jaringan air bersih dalam studi ini menggunakan aplikasi WaterCAD V8.i. Selain itu, dilakukan perhitungan Rencana Anggaran Biaya (RAB) yang akan dibutuhkan dalam pembangunan jaringan air bersih, meliputi pekerjaan pipa dan pekerjaan tandon. Dari hasil perhitungan Rencana Anggaran Biaya (RAB), kemudian dilakukan analisa ekonomi yaitu BCR (Benefit Cost Ratio), NPV (Net Present Value), IRR (Internal Rate Return), analisa pengembalian (payback period), dan analisa sensitivitas. Hasil pemodelan dan simulasi jaringan air bersih menggunakan aplikasi software WaterCAD V8.i menunjukan kondisi hidraulik sebagai berikut, kecepatan aliran dalam pipa berkisar 0,10 – 0,50 m/dt, kehilangan tinggi tekan dalam pipa berkisar 0,10 – 11,57 m/km, dan tekanan pada junction berkisar 3,661 - 8,705 atm. Perhitungan Rencana Anggaran Biaya (RAB) yang akan dibutuhkan dalam pekerjaan pembangunan sistem jaringan distribusi air bersih adalah sebesar Rp 2.992.525.000,00 terbilang dua milyar sembilan ratus sembilan puluh dua juta lima ratus dua puluh lima ribu. Perhitungan analisa ekonomi dengan tingkat suku bunga 5,25% dan usia guna pembangunan 20 tahun menyatakan bahwa nilai BCR (Benefit Cost Ratio) sebesar 1,16617, nilai NPV (Net Present Value) sebesar Rp 52.204.374,37/tahun, nilai IRR (Internal Rate Return) sebesar 7,1%, analisa payback period adalah 10 tahun, dan harga jual airnya sebesar Rp 4.200,00.
English Abstract
Kemiri Village, Jabung District, Malang Regency is a rural area located at the foot of Mount Bromo. The majority of the villagers are dairy farmers and the villagers still rely on manual water extraction to meet their daily water needs because there is no piping network that facilitates the distribution of clean water in the village, which in the village during the dry season often experiences a crisis. clean water. Responding to this, this thesis discusses the planning of a clean water distribution system which is expected to facilitate the fulfillment of clean water needs for the people of Kemiri Village. This distribution plan will use the Coban Sisir water source located in Taji Village, Jabung District, Malang Regency which has a discharge of 51.3 liters/second which is used to distribute clean water to three villages. The planning of the clean water network in this study uses the WaterCAD V8.i application. In addition, the calculation of the Budget Plan (RAB) that will be needed in the construction of the clean water network, includes pipe work and reservoir work. From the results of the calculation of the Budget Plan (RAB), then carried out economic analysis, namely BCR (Benefit Cost Ratio), NPV (Net Present Value), IRR (Internal Rate Return), analysis of returns (payback period), and sensitivity analysis. The results of modeling and simulation of clean water networks using the WaterCAD V8.i software application show the following hydraulic conditions, the flow velocity in the pipe ranges from 0.10 to 0.50 m/s, the pressure loss in the pipe ranges from 0.10 to 11.57 m /km, and the pressure at the junction ranges from 3,661 - 8,705 atm. The calculation of the Budget Plan (RAB) that will be needed in the construction of a clean water distribution network system is Rp. 2,992,525,000.00, which is two billion nine hundred ninety-two million five hundred and twenty-five thousand. The calculation of the economic analysis with an interest rate of 5.25% and a development age of 20 years states that the BCR (Benefit Cost Ratio) value is 1.16617, the NPV (Net Present Value) value is Rp. 52,204,374.37/year, the IRR value (Internal Rate Return) is 7.1%, the payback period analysis is 10 years, and the selling price of water is Rp. 4,200.00.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 0522070392 |
Uncontrolled Keywords: | WaterCAD, Rencana Anggaran Biaya, Analisa Ekonomi .- WaterCAD, Budget Plan, Economic Analysis |
Subjects: | 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.5 Reclamations, Irrigation, related topics > 627.52 Irrigation |
Divisions: | Fakultas Teknik > Teknik Pengairan |
Depositing User: | Endang Susworini |
Date Deposited: | 12 Apr 2023 02:52 |
Last Modified: | 12 Apr 2023 02:52 |
URI: | http://repository.ub.ac.id/id/eprint/198184 |
![]() |
Text (DALAM MASA EMBARGO)
RENI MEIDHA HARSO.pdf Restricted to Registered users only until 31 December 2024. Download (11MB) |
Actions (login required)
![]() |
View Item |