Pemodelan Pengaruh Pengoperasian Feedwater Heater terhadap Kinerja Pembangkit Listrik Tenaga Uap Menggunakan Gatecycle

Fathurrahman, Muhammad and Dr. Eng. Lilis Yuliati, ST., MT. and Dr. Purnami, ST., MT. (2022) Pemodelan Pengaruh Pengoperasian Feedwater Heater terhadap Kinerja Pembangkit Listrik Tenaga Uap Menggunakan Gatecycle. Sarjana thesis, Universitas Brawijaya.

Abstract

Pembangkit Listrik Tenaga Uap (PLTU) di Indonesia sebagian besar berbahan bakar batu bara. Dengan PLTU yang masih menyumbang tinggi energi listrik di Indonesia, dalam pengoperasiannya kita harus mempertimbangkan berbagai faktor yang dapat mempengaruhi kinerja PLTU. Salah satunya adalah penggunaan feedwater heater untuk meningkatkan efisiensi PLTU. Feedwater heater adalah komponen yang digunakan untuk memanaskan air pengisi ketel sebelum masuk ke boiler. Dikarenakan penggunaannya dapat meningkatkan efisiensi siklus PLTU, tidak heran banyak PLTU yang menggunakan feedwater heater. Dalam siklusnya, PLTU Paiton Unit 1 memiliki 3 buah low pressure feedwater heater. Dalam pengoperasiannya dapat terjadi suatu kondisi dimana salah satu atau beberapa low pressure feedwater heater mengalami kendala sehingga harus dimatikan atau dikondisikan off service. Penelitian ini dilakukan dengan tujuan untuk mengetahui efek variasi jumlah low pressure feedwater heater yang digunakan terhadap kinerja PLTU yang dihasilkan dengan daya yang tetap. Pengujian variasi dilakukan menggunakan perangkat lunak simulasi GateCycle supaya tidak mengganggu operasional dari PLTU Paiton Unit 1. Hasil dari pengujian menunjukkan bahwa kondisi dengan kinerja terbaik adalah pada kondisi operasional dengan keadaan seluruh low pressure feedwater heater dalam kondisi on service dengan konsumsi batu bara sebesar 239577,24 kg/h, efisiensi siklus sebesar 36,56%, serta heat rate sebesar 2351,66 kcal/kWh. Sementara kondisi dengan kinerja terendah adalah pada kondisi semua low pressure feedwater heater dalam kondisi off service dengan konsumsi batu bara sebesar 243712,00 kg/h, efisiensi siklus sebesar 35,94%, serta heat rate sebesar 2392,19 kcal/kWh. Selain itu dengan data hasil variasi lainnya juga menunjukkan bahwa penambahan jumlah low pressure feedwater heater yang dikondisikan off service menyebabkan kecenderungan menurunnya kinerja PLTU.

English Abstract

Steam power plants in Indonesia are mostly coal-fired. With steam power plants which still contributes a lot of electrical energy in Indonesia, in its operation we must consider various factors that can affect the performance of the steam power plants. One of them is the use of a feedwater heater to increase the cycle efficiency of the power plant. Feedwater heater is a component used to heat boiler feedwater before entering the boiler. Because its use can increase the efficiency of the steam power plants cycle, it is not surprising that many steam power plants use feedwater heaters. In its cycle, Unit 1 of Paiton Steam Power Plant has 3 low pressure feedwater heaters. In its operation, a condition can occur where one or several low pressure feedwater heaters experience problems so they must be conditioned to be off service. This research was conducted with the aim of knowing the effect of variations in the number of low pressure feedwater heaters used on the performance of the steam power plant produced with a fixed power. The variation test is carried out using GateCycle simulation software so as not to interfere with the operation of Unit 1 of Paiton Steam Power Plant. The results of the test show that the best performance conditions are operational conditions with all low pressure feedwater heaters in on service condition with coal consumption of 239577.24 kg/h, cycle efficiency of 36.56%, and heat rate of 2351.66 kcal/kWh. Meanwhile, the conditions with the lowest performance are all low pressure feedwater heaters in off service conditions with coal consumption of 243712,00 kg/h, cycle efficiency of 35.94%, and heat rate of 2392.19 kcal/kWh. In addition, the results of other variations also show that the addition of the number of low pressure feedwater heaters which are conditioned to be off service causes a tendency to decrease the performance of the steam power plant.

Item Type: Thesis (Sarjana)
Identification Number: 0522070366
Uncontrolled Keywords: Pembangkit Listrik Tenaga Uap, feedwater heater, efisiensi, heat rate, batu bara, GateCycle. .- Steam power plants, feedwater heater, efficiency, heat rate, coal, GateCycle.
Subjects: 600 Technology (Applied sciences) > 621 Applied physics > 621.8 Machine engineering
Divisions: Fakultas Teknik > Teknik Mesin
Depositing User: Endang Susworini
Date Deposited: 11 Apr 2023 02:32
Last Modified: 11 Apr 2023 02:32
URI: http://repository.ub.ac.id/id/eprint/198130
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
Muhammad Fathurrahman.pdf
Restricted to Registered users only until 31 December 2024.

Download (7MB)

Actions (login required)

View Item View Item