iPerencanaan iAnggaran iBiaya iDan iTime iSchedule iDengan iIntegrasi iBuilding iInformation iModelling iPada iPembangunan iJembatan iWai iEla iDi iProvinsi iMaluku.

Lasinta, Kurniasih iRahmadhani and Ir. Agus Suharyanto, M.Eng., Ph.D and Ir. Kartika Puspa Negara, ST., MT., Ph.D (2022) iPerencanaan iAnggaran iBiaya iDan iTime iSchedule iDengan iIntegrasi iBuilding iInformation iModelling iPada iPembangunan iJembatan iWai iEla iDi iProvinsi iMaluku. Magister thesis, Universitas Brawijaya.

Abstract

Perencanaan ianggaran ibiaya idan itime ischedule iproyek iadalah isuatu ihal iyang ipenting idalam ipelaporan isuatu ipembangunan ikonstruksi iagar iproyek iberjalan isesuai irencana idan imengontrol iketerlambatan iyang iterjadi iuntuk ipemilihan isolusi iyang iefisien. iNamun ibiaya idan ijadwal iyang idibuat idalam iperencanaan iharus iterlebih idahulu idilakukan iperhitungan iyang ijelas iuntuk imenghindari ireworks isehingga imeningkatkan iperencanaan ibiaya idan ijadwal iproyek iyang idiaplikasikan isaat ipelaksanaan isecara itepat. iTujuan ipenelitian iini iadalah iuntuk imenentukan ipembiayaan idan ipenjadwalan idengan iintegrasi iBuilding iInformation iModeling i(BIM) idan iProgam iEvaluation iReviewiTechnique i(PERT) idengan iperbandingan itiga idurasi iwaktu iberdasarkankan ihasil iwawancara iresponden, irencana ijadwal imenggunakan isumberdaya ipercobaan ike-1 idan ipercobaan ike-2, imembandingkan ijadwal iyang idibuat imenggunakan i3 iestimasi ibiaya idan iwaktu iyang idiperoleh isaat iwawancara idilapangan, idan imenganalisis iefisiensi ipenjadwalan isesuai ipersyaratan. iPenelitian iini ijuga imengahasilkan ibiaya iberdasarkan ihasil iprogram irevit idiperoleh iRp. iRp26.274.877.152. Jadwal ipada ipembangunan iJembatan iWai iEla idi iProvinsi iMaluku iberdasarkan iwawancara idapat iselesai iselama i541,55 ihari, iefisiensi i22,44%iberdasarkan irencana iawal idan i6,46% iberdasarkan irealisasi, iuntuk ipercobaan ike-1 idapat iselesai iselama i374,97 ihari, iefisiensi i10,72% iberdasarkan irencana iawal idan i35,24% iberdasarkan irealisasi. iDan iuntuk ipercobaan ike-2 idapat iselesai iselama i437 ihari, iefisiensi i4,048% iberdasarkan irencana iawal idan i24,53% iberdasarkan irealisasi. iDari iketiga iperhingan ijadwal idipilih idengan iintegrasi iBIM imenggunakan isoftware iRevit idan iNavisworks iterlihat ivisualisasi ibangunan ijembatan iyang imemenuhi ikategori iefisisensi iberdasakan ipersyaratan inilai iefisisensi iminimum idan idari iaspek ibiaya idan iwaktu ijuga iefisien iadalah ijadwal ike�2

English Abstract

Abstract. iPlanning ia iproject ibudget iand itime ischedule iis ithe iimportant imatter iin ia ireporting ia iconstruction idevelopment iso ithat ithe iproject igoes iaccording ito iplan iand icontrols idelays ithat ioccur ifor iselectingiefficient isolutions. iHowever, icost iand ischedule imade iin ithe i planningimust ifirst ibe icalculated ito iavoid ireworks ito icorrectly iimprove ithe ibudget iand ithe iproject ischedule iplanning ithat iis iapplied iduring iimplementation. iThe ipurpose iof ithis istudy iwas ito idetermine ischeduling iwith ithe iintegration iof iBuilding iInformation iModeling i(BIM) iand iProgram iEvaluation iReview iTechnique i(PERT) iwith ia icomparison iof ithree-time idurations ibased ion ithe ischedule iplan iusing iresources, iestimates iobtained iduring ifield iinterviews, iand ianalyze ischeduling iefficiency iaccording ito irequirements. ihis iresearch i also iresulted iin i costs i based ion ithe iresults iofithe irevit iprogram iobtained iRp. i26,274,877,152. The iresult iis ithree iplan iof ianalyze iPERT iand iBIM inetwork ischedules iin ithe iform iof i3D iand i4D ivisual ion istudy iresulted iin ia ischeduleifor ithe iconstruction iof ithe iWai iEla iBridge iin iMaluku iProvince ifor ischedule iplan-3, iit ican ibe icompleted iin i541.55 idays, iefficiency iis i22.44%ibased ion ithe iinitial iplan iand i6.46% ibased ion irealization, ifor ischedule iplan-1 ito ibe icompleted iin i374.97 idays, iefficiency iof i10.72% ibased ion itheinitial iplan iand i35.24% ibased ion irealization, iand ifor ischedule iplan-2, iit ican ibe icompleted iin i437 idays, iefficiency iis i4.048% ibased ion ithe iinitial iplan i and i 24.53% i based i on i realization. iFrom i the i three i scheduleicalculations iusing iPERT inetwork ianalysis iselected iwith iBIM iintegration iusing iRevit iand iNavisworks isoftware, ithe ivisualization iof ibridge ibuildings iaccording ito ithe icharacteristics iof ithe iproject ithat imeets ithe iefficiency icategory iof icompletion itime ibased ion ithe iminimum iefficiency ivalue ifor iefficiency i> i5% iand iefficiency ilevel i(i) i< i60% iand ifrom ithe iaspect iof iresources ialso iefficient ito ibe iapplied iin ithe ifield iis ithe iplan-2 iof iPERT ischedule.

Item Type: Thesis (Magister)
Identification Number: 0422070020
Uncontrolled Keywords: Biaya, iwaktu, iKeterlambatan, iEfisiensi .- iCost, iSchedule, iDelays, iEfficiency.
Subjects: 600 Technology (Applied sciences) > 624 Civil engineering
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Endang Susworini
Date Deposited: 06 Apr 2023 03:19
Last Modified: 06 Apr 2023 03:19
URI: http://repository.ub.ac.id/id/eprint/198069
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
Kurniasih Rahmadhani Lasinta.pdf
Restricted to Registered users only until 31 December 2024.

Download (18MB)

Actions (login required)

View Item View Item