Pratama, Ivan Kurnia and Ir. Suwanto Marsudi, MS and Dr. Eng.Ir. Evi Nur Cahya, ST., MT (2022) , Studi Penjadwalan Pelaksanaan Konstruksi Conduit Pengelak dan Cofferdam pada Bendungan Cijurey Kabupaten Bogor Provinsi Jawa Barat dengan Menggunakan Microsoft Project Manager 2016. Sarjana thesis, Universitas Brawijaya.
Abstract
Bendungan Cijurey yang terletak di Kecamatan Sukamakmur Kabupaten Bogor Provinsi Jawa Barat merupakan bendungan bertipe RCC (Rolled Compacted Concrete) Dam. Bendungan tipe RCC merupakan bendungan dengan teknologi baru di Indonesia, sehingga dalam pelaksanaan konstruksinya memerlukan metode pekerjaan yang tepat. Tak terkecuali pada proses pelaksanaan konstruksi conduit pengelak dan cofferdam yang merupakan pekerjaan rekayasa berskala besar. Tentu dalam pembangunannya banyak terdapat aktivitas, biaya, sumber daya dan instansi maupun individu yang terlibat langsung dan diperlukan teknik mengatur atau memanajemen terkait hal tersebut. Dalam studi ini yang dianalisa adalah pelaksanaan Conduit dan Cofferdam Bendungan Cijurey. Pekerjaan yang dikaji hanya pekerjaan sipil. Sebelum melakukan penjadwalan langkah yang dilakukan adalah menentukan metode pelaksanaan perkerjaan untuk mendapat jenis-jenis sumber daya yang dibutuhkan. Setelah didapatkan kebutuhan sumber daya maka dilakukan perhitungan produktivitas alat, produktivitas pekerja serta kebutuhan material. Langkah selanjutnya adalah menganalisis Harga Satuan Pekerjan yang digunakan untuk mendapatkan Rencana Anggaran Biaya dengan cara mengalikan harga satuan dengan volume setiap pekerjaan. Kemudian melakukan estimasi durasi dan dilanjutkan dengan membuat hubungan ketergantungan tiap pekerjaan. Setelah itu menganalisis rencana kerja pelaksanaan proyek dengan menggunakan dua alternatif. Alternatif yang dilakukan pada studi ini adalah penambahan alat berat dan penambahan jam kerja. Kemudian dilakukan penjadwalan menggunakan Microsoft Project Manager 2016. Hasil yang didapatkan adalah berupa kurva S, waktu dan jumlah kebutuhan sumber daya yang akan dievaluasi kembali dan dipilih alternatif mana yang paling optimal. Berdasarkan hasil penjadwalan pelaksanaan konstruksi Conduit dan Cofferdam Bendungan Cijurey didapat durasi selama 95 hari kerja dengan biaya Rp 128.991.788.957 (Seratus Dua Puluh Delapan Milyar Sembilan Ratus Sembilan Puluh Satu Juta Tujuh Ratus Delapan Puluh Delapan Ribu Sembilan Ratus Lima Puluh Tujuh Rupiah). Setelah dilakukan percepatan jadwal menggunakan alternatif penambahan alat berat didapat durasi selama 76 hari kerja dengan biaya Rp 126.138.732.531 (Seratus Dua Puluh Enam Milyar Seratus Tiga Puluh Delapan Juta Tujuh Ratus Tiga Puluh Dua Ribu Lima Ratus Tiga Puluh Satu Rupiah). Sedangkan dengan alternatif penambahan jam kerja didapat durasi selama 74 hari kerja dengan biaya Rp 125.263.904.422 (Seratus Dua Puluh Lima Milyar Dua Ratus Enam Puluh Tiga Juta Sembilan Ratus Empat Ribu Empat Ratus Dua Puluh Dua Rupiah) Berdasarkan alternatif tersebut maka alternatif yang dipilih untuk percepatan jadwal pelaksanaaan konstruksi Conduit dan Cofferdam Bendungan Cijurey adalah alternatif dengan penambahan jam kerja.
English Abstract
Cijurey Dam, which is located in Sukamakmur District, Bogor Regency, West Java Province, is an RCC (Rolled Compacted Concrete) Dam-type dam. RCC-type dams are dams with new technology in Indonesia, so the implementation of their construction requires the right method of work. No exception is the process of implementing the construction of evasive conduits and cofferdams which are large-scale engineering work. Of course, in its construction, there are many activities, costs, resources, and agencies and individuals who are directly involved and techniques are needed to regulate or manage related to this matter. In this study, the analysis was the implementation of the Cijurey Dam Conduit and Cofferdam. The work studied is only civil work. Before scheduling the step is to determine the method of implementing the work to get the types of resources needed. After obtaining the need for resources, tool productivity, worker productivity, and material needs are calculated. The next step is to analyze the Unit Price of The Worker used to obtain the Cost Budget Plan by multiplying the unit price by the volume of each work. Then estimate the duration and continue by producing a dependency relationship for each job. After that analyze the work plan of project implementation using two alternatives. Alternatives made in this study were the addition of working hours and the addition of heavy equipment. Then scheduling is carried out using Microsoft Project Manager 2016. The results are in the form of an S curve, time, and the number of resource needs that will be reevaluated and selected for the most optimal alternative. Based on the results of the scheduling of the construction of the Conduit and Cofferdam Cijurey Dam, a duration of 95 working days was obtained for Rp. 128,991,788,957 (One Hundred Twenty-Eight Billion Nine Hundred and Ninety-One Million Seven Hundred Eighty�Eight Thousand Nine Hundred and Fifty-Seven Rupiah). After accelerating the schedule using the alternative of adding heavy equipment, the duration of 76 working days was obtained for Rp. 126,138,732,531 (One Hundred Twenty-Six Billion One Hundred Thirty-Eight Million Seven Hundred Thirty-Two Thousand Five Hundred thirty-One Rupiah). Meanwhile, with the alternative of adding working hours, a duration of 74 working days is obtained for Rp. 125,263,904,422 (One Hundred Twenty-Five Billion Two Hundred and Sixty-Three Million Nine Hundred Four Thousand Four Hundred and Twenty-Two Rupiah). Based on these alternatives, the alternative chosen to accelerate the construction schedule of the Conduit and Cofferdam Cijurey Dam is an alternative with additional working hours.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 0522070335 |
Uncontrolled Keywords: | Penjadwalan, Jam Kerja, Alat Berat, Microsoft Project Manager 2016 .- Scheduling, Working Hours, Heavy Equipment, Microsoft Project Manager 2016 |
Subjects: | 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.5 Reclamations, Irrigation, related topics > 627.52 Irrigation |
Divisions: | Fakultas Teknik > Teknik Pengairan |
Depositing User: | Endang Susworini |
Date Deposited: | 06 Apr 2023 02:24 |
Last Modified: | 06 Apr 2023 02:24 |
URI: | http://repository.ub.ac.id/id/eprint/198051 |
![]() |
Text (DALAM MASA EMBARGO)
IVAN KURNIA PRATAMA.pdf Restricted to Registered users only until 31 December 2024. Download (18MB) |
Actions (login required)
![]() |
View Item |