: Optimalisasi Jadwal Proyek Akibat Logistik Material dan Keterbatasan Tenaga Kerja Menggunakan Metode Constraint Programming (Studi Kasus : Pabrik Kelapa Sawit di Sangatta, Kalimantan Timur).

Daniswara, Hafizh and Saifoe El Unas, ST., MT. and Ir. M. Hamzah Hasyim, ST., M.Eng.Sc. and Dr. Eng. Achfas Zacoeb, ST., MT. (2022) : Optimalisasi Jadwal Proyek Akibat Logistik Material dan Keterbatasan Tenaga Kerja Menggunakan Metode Constraint Programming (Studi Kasus : Pabrik Kelapa Sawit di Sangatta, Kalimantan Timur). Sarjana thesis, Universitas Brawijaya.

Abstract

Ada tiga komponen yang menjadi penentu terhadap keberhasilan dalam pembangunan infrastruktur yaitu mutu, biaya, dan waktu. Beberapa contoh faktor yang mempengaruhi komponen tersebut adalah logistik material dan tenaga kerja. Oleh karena itu dilakukan simulasi dan analisis dalam penentuan tenaga kerja dengan menyesuaikan pengadaan material yang terkendala agar jadwal proyek dapat dipercepat dan mendapatkan durasi yang lebih optimal. Penelitian ini berfokus pada pekerjaan pembangunan bangunan utama Pabrik Kelapa Sawit yang berupa struktur baja dengan tujuan untuk mencari durasi optimal dengan menggunakan beberapa alternatif jumlah tenaga kerja dan pengadaan material. Dalam menentukan durasi pekerjaan yang optimal perlu dihitung jumlah tenaga kerja dan jumlah material dari masing-masing pekerjaan dengan memperhatikan batasan-batasan yang ditentukan. Batasan ini akan digunakan sebagai kendala dalam penganalisaan dan simulasi yang akan dibuat di dalam penelitian ini. Batasan-batasan tersebut diantaranya adalah hubungan antar aktivitas/pekerjaan, jumlah material yang dibutuhkan di masing-masing pekerjaan, dan jumlah tenaga kerja yang dibutuhkan di masing-masing pekerjaan. Analisa yang digunakan adalah metode constraint programming dengan menggunakan IBM ILOG CPLEX Optimization Studio kemudian didapatkan solusi paling optimal yang berupa durasi pekerjaan yakni selama 123 hari dengan pengadaan material dilakukan di awal, dan semua pekerjaan dapat dipercepat dengan penambahan tenaga kerja sebanyak 50% dari jumlah realisasinya di setiap pekerjaan.

English Abstract

There are three components that determine the success of infrastructure development, namely quality, cost, and time. Some examples that influence these components are material logistics and manpower. Therefore, simulation and analysis are carried out in determining the number of manpower by adjusting the procurement of materials that are constrained so that the project shedules can be accelerated and get a more optimal duration. This reaserch focuses on the structural works of the main building of the Palm Oil Mill with the aim of finding the optimal duration by using several alternative amounts of manpower and materials procurement. In determining the optimal duration, it is necessary to calculate the number of manpower and amount of material for each activities based on predetermined limitations. This limitations will be used as a constraint in the analysis and simulation in this research. Among the are predecessor constraint, material constraint, and crew constraint. The analysis used constraint programming method using IBM ILOG CPLEX Optimization Studio and then the most optimal solution is obtained in the form of work duration of 123 days with material procurement carried out at the beginning, and all activities can be accelerated by adding 50% of the manpower in each activites.

Item Type: Thesis (Sarjana)
Identification Number: 0522070322
Uncontrolled Keywords: optimalisasi, jadwal proyek, constraint .- optimization, project schedule, constraint
Subjects: 600 Technology (Applied sciences) > 624 Civil engineering
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Endang Susworini
Date Deposited: 05 Apr 2023 04:32
Last Modified: 05 Apr 2023 04:32
URI: http://repository.ub.ac.id/id/eprint/198004
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
Hafizh Daniswara.pdf
Restricted to Registered users only until 31 December 2024.

Download (4MB)

Actions (login required)

View Item View Item