Studi Penjadwalan Pelaksanaan Konstruksi Main Dam pada Bendungan Cijurey Kabupaten Bogor Provinsi Jawa Barat dengan Menggunakan Microsoft Project Manager 2016

Arissaputra, Andry Sofyan and Ir. Suwanto Marsudi, MS and Dr. Eng.Ir. Evi Nur Cahya, ST., MT (2022) Studi Penjadwalan Pelaksanaan Konstruksi Main Dam pada Bendungan Cijurey Kabupaten Bogor Provinsi Jawa Barat dengan Menggunakan Microsoft Project Manager 2016. Sarjana thesis, Universitas Brawijaya.

Abstract

Bendungan Cijurey yang terletak di Kecamatan Sukamakmur Kabupaten Bogor adalah salah satu upaya penanganan untuk mengatasi permasalahan pada hilir Sungai Citarum. Dalam pembangunan Bendungan Cijurey, pelaksanaan konstruksi Main Dam merupakan proyek perekayasaan yang berskala besar dengan karakteristik yang berbeda dengan bendungan lainnya karena bendungan ini bertipe RCC (Rolled Compacted Concrete) Dam. Sehingga diperlukan adanya suatu metode pengaturan untuk mengkoordinasikan suatu kegiatan, sumberdaya, dan pihak-pihak yang terlibat di dalamnya, agar proyek dapat mencapai waktu, biaya dan kualitas secara optimal. Dalam studi ini yang dianalisa adalah pelaksanaan Main Dam Bendungan Cijurey. Pekerjaan yang dikaji hanya pekerjaan sipil. Sebelum melakukan penjadwalan Langkah yang dilakukan adalah menentukan metode pelaksaan perkerjaan untuk mendapat jenis- jenis sumber daya yang dibutuhkan. Setelah didapatkan kebutuhan sumber daya maka dilakukan perhitungan produktivitas alat, produktivitas pekerja serta kebutuhan material . Langkah selanjutnya adalah menganalisis Harga Satuan Pekerjan yang digunakan untuk mendapatkan Rencana Anggaran Biaya dengan cara mengalikan harga satuan dengan volume setiap pekerjaan. Kemudian melakukan estimasi durasi dan dilanjutkan dengan membuah hubungan ketergantungan tiap pekerjaan. Setelah itu menganalisis rencana kerja pelaksanaan proyek dengan menggunakan dua alternatif. Alternatif yang dilakukan pada studi ini adalah penambahan jam kerja dan penambahan alat berat. Kemudian melakukan dilakukan penjadwalan menggunak Microsoft Project Manager 2016. Hasil yang didaptkan adalah berupa kurva S, waktu dan jumlah kebutuhan sumber daya yang akan dievaluasi kembali dan dipilih alternatif mana yang paling optimal. Berdasarkan hasil penjadwalan pelaksanaan konstruksi Main Dam Bendungan Cijurey didapat durasi selama 687 hari kerja dengan biaya Rp 2.701.485.517.151 (Dua Triliyun Tujuh Ratus Satu Milyar Empat Ratus Delapan Puluh Lima Juta Lima Ratus Tujuh Belas Seratus Lima Puluh Satu Rupiah). Setelah dilakukan percepatan jadwal menggunakan alternatif penambahan jam kerja didapat durasi selama 534 hari kerja dengan biaya Rp 2.682.888.355.711 (Dua Triliyun Enam Ratus Delapan Puluh Dua Milyar Delapan Ratus Delapan Puluh Delapan Juta Tiga Ratus Lima Puluh Lima Ribu Tujuh Ratus Sebelas Rupiah). Sedangkan dengan alternatif penambahan alat berat didapat durasi selama 550 hari kerja dengan biaya Rp 2.682.888.355.711 (Dua Triliyun Enam Ratus Delapan Puluh Dua Milyar Delapan Ratus Delapan Puluh Delapan Juta Tiga Ratus Lima Puluh Lima Ribu Tujuh Ratus Sebelas Rupiah). Berdasarkan alternatif tersebut maka alternatif yang dipilih untuk percepatan jadwal pelaksanaaan konstruksi Main Dam Bendungan Cijurey adalah alternatif dengan penambahan jam kerja.

English Abstract

Cijurey Dam, located in Sukamakmur District, Bogor Regency, is one of the handling efforts to overcome problems in the lower reaches of the Citarum River. In the construction of the Cijurey Dam, the construction of the Main Dam is a large-scale engineering project with characteristics that are different from other dams because this dam is of the RCC (Rolled Compacted Concrete) Dam type. So that a regulatory method is needed to coordinate an activity, resources, and parties involved in it, so that the project can achieve optimal time, cost, and quality. In this study, the analysis was the implementation of the Cijurey Dam Main Dam. The work studied is only civil work. Before scheduling The step is to determine the method of implementing the work to get the types of resources needed. After obtaining the need for resources, tool productivity, worker productivity, and material needs are calculated. The next step is to analyze the Unit Price of The Worker used to obtain the Cost Budget Plan by multiplying the unit price by the volume of each work. Then estimate the duration and continue by producing a dependency relationship for each job. After that analyze the work plan of project implementation using two alternatives. Alternatives made in this study were the addition of working hours and the addition of heavy equipment. Then scheduling is carried out using Microsoft Project Manager 2016. The results are in the form of an S curve, time, and the number of resource needs that will be reevaluated and selected for which alternative is the most optimal. Based on the results of scheduling the construction of the Cijurey Dam Main Dam, a duration of 687 working days was obtained for Rp. 2,701,485,517,151 (Two Triliyun Seven Hundred One Billion Four Hundred Eighty-Five Million Five Hundred Seventeen One Hundred and Fifty-One Rupiah). After accelerating the schedule using the alternative of adding working hours, the duration of 534 working days was obtained for Rp. 2,682,888,355,711 (Two Triliyun Six Hundred Eighty-Two Billion Eight Hundred Eighty-Eight Million Three Hundred Fifty-Five Thousand Seven Hundred Eleven Rupiah). Meanwhile, with the alternative of adding heavy equipment, a duration of 550 working days is obtained for Rp. 2,682,888,355,711 (Two Triliyun Six Hundred Eighty- Two Billion Eight Hundred Eighty-Eight Million Three Hundred Fifty-Five Thousand Seven Hundred Eleven Rupiah). Based on these alternatives, the alternative chosen to accelerate the construction schedule for the Cijurey Dam Main Dam is an alternative with additional working hours.

Item Type: Thesis (Sarjana)
Identification Number: 0522070284
Uncontrolled Keywords: Penjadwalan, Jam Kerja, Alat Berat, Microsoft Project Manager 2016 .- Scheduling, Working Hours, Heavy Equipment, Microsoft Project Manager 2016
Subjects: 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.5 Reclamations, Irrigation, related topics > 627.52 Irrigation
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Endang Susworini
Date Deposited: 03 Apr 2023 06:23
Last Modified: 03 Apr 2023 06:23
URI: http://repository.ub.ac.id/id/eprint/197832
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
ANDRY SOFYAN ARISSAPUTRA.pdf
Restricted to Registered users only until 31 December 2024.

Download (22MB)

Actions (login required)

View Item View Item