Evaluasi Kinerja Sistem Pemeliharaan Bengkel Stamping Menggunakan Overall Measurement of Maintenance Performance

Nabila, Asyfa (2017) Evaluasi Kinerja Sistem Pemeliharaan Bengkel Stamping Menggunakan Overall Measurement of Maintenance Performance. Sarjana thesis, Universitas Brawijaya.

Abstract

PT. PINDAD (Persero) adalah perusahaaan industri manufaktur Indonesia yang bergerak dalam bidang produk militer dan produk komersial. Divisi Munisi PT. PINDAD (Persero) di Turen memproduksi beberapa produk munisi dan produk pendukung, salah satunya adalah metalix box. Produksi metalix box di bengkel stamping seringkali terkendala oleh kerusakan mesin yang menimbulkan downtime. Kerusakan mesin ini juga menimbulkan waste waiting time karena seringkali kerusakan tidak langsung ditangani oleh departemen pemeliharaan. Tingginya waste yang dihasilkan membuat perusahaan perlu melakukan evaluasi sistem pemeliharaan untuk mengetahui bagaimana kondisi kinerja pemeliharaan yang ada di PT.PINDAD (Persero). Pada penelitian ini dilakukan evaluasi pada kinerja sistem pemeliharaan menggunakan metode Overall Measurement of Maintenance Performance (OMMP) yang dilakukan di bengkel stamping Sub Departemen Produksi Perkakas dan Pendukung yang dimulai dari penyesuaian dan validasi Key Performance Indicator (KPI) dengan kondisi perusahaan dimana dari 23 indikator 12 diantaranya merupakan indikator tervalidasi, kemudian melakukan pembobotan KPI dan pembuatan konstruksi Analysis Hierarchy Process (AHP). Langkah selanjutnya adalah perhitungan nilai pencapaian indikator secara aktual berdasarkan konsep perhitungan OMMP dan menggunakan scoring system OMAX. Berdasarkan hasil OMAX, nilai pencapaian indikator akan dikelompokan menjadi 10 ranking yang kemudian dikelompokan lagi dengan menggunakan Traffic Light System dimana akan dihasilkan indikator pada zona hijau, kuning dan merah. Indikator yang berada pada zona kuning dan merah memerlukan rekomendasi perbaikan agar pencapaian nilai indikator bisa meningkat. 12 indikator tervalidasi 4 diantaranya terdapat pada zona hijau, 4 indikator pada zona kuning dan 4 lainnya pada zona merah. Nilai total indeks pada perhitungan OMAX sebesar 2.1224 yang berarti secara keseluruhan pencapaian kinerja sistem pemeliharaan berada pada zona merah dengan indikator terendah yaitu predictive dan preventive maintenance coverage sebesar 0,9. Rekomendasi perbaikan diberikan pada indikator yang berada pada zona kuning dan merah.

English Abstract

PT. PINDAD (Persero) is indonesian industrial manufacturing company which is make military product and commercial products. PT. PINDAD (Persero) ammunition division in Turen produces several munitions and supporting products, which one is metalix box. The production of metalix box in the stamping workshop is often constrained because the machine damage that leads downtime. Machines damage also generates waste waiting time because the damage often not directly handled by the maintenance departement. The high waste generated makes the company need to do evaluation on the maintenance system to find out how the condition of existing maintenance performance in PT. PINDAD (Persero). In this research, performance of maintenance system was evaluated using overall measurement of maintenance performance method in the workshop stamping sub departement of tooling and supporting production starting from the adjustment and validation of key performance indicator with the condition of the company where from 23 indicator 12 is validated indicator, then do KPI weighting and make construction of Analytical Hierarchy Process (AHP). The next step in OMMP calculation and use OMAX scoring system. Based on the result of OMAX, the value of the achievement of the indicator will be gruped again using Traffic Light System which will generate indicator on green zone, yellow zone and red zone. 12 indicators validated 4 in the green zone, 4 indicators in the yellow zone and 4 in the red zone. The total value of index performance calculation of OMAX is 2.1224 which means the overall achievement of system maintenance performance is in the red zone with the lowest value of indicator is predictive and preventive maintenance coverage of 0.9. Improvement recommendations are given to indicators located in the yellow zone and red zone.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2017/373/051704396
Uncontrolled Keywords: waste, Overall Measure of Maintenance Performance, Key Performance Indicator, Analytical Hierarchy Process, Objective Matrix, Traffic Light System
Subjects: 600 Technology (Applied sciences) > 658 General management > 658.5 Management of production
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Budi Wahyono Wahyono
Date Deposited: 31 Aug 2017 07:34
Last Modified: 13 Nov 2024 03:06
URI: http://repository.ub.ac.id/id/eprint/1971
[thumbnail of ASYFA NABILA.pdf] Text
ASYFA NABILA.pdf

Download (3MB)

Actions (login required)

View Item View Item