Rizqi, Muhammad Alfi and Dr. Retno Anggraini, ST., MT. and Yohan Lukmantyo, ST. (2022) Analisa Metode Pelaksanaan serta Penjadwalan terhadap Perubahan Struktur Beton menjadi Struktur Rangka Baja pada Pembangunan Lift Kebakaran Gedung Enterpreneurship dengan mengaplikasikan Building Information Modelling 4D (BIM 4D). Sarjana thesis, Universitas Brawijaya.
Abstract
Salah satu factor kemanan yang harus diperhatikan dengan rinci dalam sebuah perencanaan pembangunan adalah terkait bahaya kebakaran, pentingnya sarana pemadam kebakaran, penyelamatan jiwa penghuni bangunan serta penanganan pasca kebakaran perlu perhatian khusus dalam sebuah perencanaan bangunan gedung tingkat tinggi. Pada bangunan Gedung KDP Entrepreneurship Universitas Brawijaya ini di rencanakan akan menggunakan Gedung lift kebakaran untuk memnuhi factor keamanan pada bangunan ini. Lift kebakaran sendiri akan dibangun diluar bangunan inti Gedung kdp entrepreneurship universitas brawijaya dengan menggunakan system beton bertulang. Namun pada pelaksanaannya terdapat beberapa kendala pada lokasi proyek yang mengurangi kemungkinan bahwa bangunan beton bertulang akan bisa digunakan pada lift kebakaran ini. Sehingga memunculkan opsi metode pelaksanaan menggunakan konstruksi yang bisa menjawab permasalahan pada kondisi proyek, opsi tersebut menggunakan metode struktur baja karena struktur baja sudah biasa diaplikasikan juga pada bangunan Gedung tinggi dan terbukti lebih ringkas serta efisien. Pada penelitian kali ini, dilakukan analisis bagaimana pengaruh perubahan metode pelaksanaan struktur beton konvensional menjadi struktur baja. Pada penelitian ini berfokus pada perubahan metode pelaksanaan tersebut terhadap durasi pekerjaan serta kemudahan / efektivitas pekerjaan pada lapangan / jumlah kebutuhan tenaga kerja yang digunakan untuk mengerjakan bangunan ini dengan total 10 lantai dengan keterbatasan kondisi yang ada. Durasi yang direncanakan akan dikombinasikan dengan metode pelaksanaan serta menyesuaikan dengan tenaga kerja rencana dan kondisi lapangan agar dapat menghasilkan durasi yang efektif serta efisien.
English Abstract
One of the safety factors that must be considered in detail development plan is related to fire hazards, the importance of fire facilities, mental fires, construction, and post-fire handling that need special attention in planning high-rise buildings. In the UB Entrepreneurship KDP Building, it is planned to use a fire elevator building to fulfil the safety factor in this building. The fire elevator itself will be built outside the main building of the Brawijaya University KDP Entrepreneurship Building using a reinforcecd concrete system. However, in practice there are several obstacles at project site which reduce the possibility that reinforced concrete buildings will be able to be used in this fire lift. So that it raises the option of an implementation method using construction that can answer problems in project conditions, this option uses the steel structure method because steel structures are also commonly applied to tall buildings and are proven to be more concise and efficient. In this research, an analysis was carried out on how the effect of changing the implementation method of conventional concrete structures into steel structures was carried out. This study focuses on changing implementation method on the duration of the work as well as the ease / effectiveness of work in the field / the number of labor requirements used to work on this building with a total of 10 floors with limited conditions. The planned duration will be combined with the implementation method and adjust to the planned work force and field conditions in order to produce an effective and efficient duration.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | 0522070237 |
Uncontrolled Keywords: | Manajemen Proyek, Metode Kerja, Perhitungan Waktu, Struktur Beton, Struktur Rangka Baja, Project Management, Work Methods, Time Calculation, Concrete Structures, Steel Frame Structures. |
Subjects: | 600 Technology (Applied sciences) > 624 Civil engineering |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Zainul Mustofa |
Date Deposited: | 14 Oct 2022 03:27 |
Last Modified: | 14 Oct 2022 03:27 |
URI: | http://repository.ub.ac.id/id/eprint/195691 |
![]() |
Text (DALAM MASA EMBARGO)
Muhammad Alfi Rizqi.pdf Restricted to Registered users only until 31 December 2024. Download (8MB) |
Actions (login required)
![]() |
View Item |