Studi Perencanaan Embung Banyuurip Kecamatan Kalidawir Kabupaten Tulungagung Provinsi Jawa Timur

Santoso, Muhammad Bagus Hari (2017) Studi Perencanaan Embung Banyuurip Kecamatan Kalidawir Kabupaten Tulungagung Provinsi Jawa Timur. Sarjana thesis, Universitas Brawijaya.

Abstract

Embung adalah bangunan yang berfungsi menampung air hujan untuk persediaan suatu desa/wilayah di musim kering. Mengacu pada Indikasi Program Pembangunan Rencana Tata Ruang Wilayah Kabupaten Tulungagung 2011-2031 dengan waktu pelaksanaan RPJM- 2 (tahun 2015-2019) serta hasil analisis kondisi daerah potensial yang ada, maka rencana pembangunan Embung Banyuurip merupakan salah satu alternatif pemecahan masalah kebutuhan air baku masyarakat di Desa Banyuurip. Kondisi eksisting di daerah rencana Embung Banyuurip ini tidak memiliki baseflow atau sungai yang mengalir sepanjang tahun sehingga pada saat musim kemarau masyarakat kesulitan untuk memperoleh air baku dan hanya mengharapkan dari sumber dari air hujan saja sehingga sangat diperlukan suatu tampungan air yang diharapkan dapat penuh selama musim penghujan dan dioperasikan selama musim kemarau. Analisis dalam studi perencanaan ini dimaksudkan untuk mendapatkan dimensi bangunan utama yaitu tubuh embung dan spillway beserta rencana anggara biaya yang harus dialokasikan dengan volume efektif yang direncanakan dapat memenuhi jumlah kebutuhan air baku penduduk sesuai dengan jumlah penduduk yang telah diproyeksikan selama 25 tahun ke depan. Jenis embung yang digunakan pada perencanaan ini adalah embung dengan pasangan beton (cyclopean concrete) karena berdasarkan pertimbangan ketersediaan material, geologi tanah (jenis pondasi batu), lebar lembah yang relatif sempit, dan pertimbangan biaya. Cyclopean concrete merupakan jenis beton yang sama dengan beton normal biasa, perbedaannya hanya pada beton ini digunakan ukuran agregat yang relatif besar. Ukuran agregat kasar dapat mencapai 20 cm, namun proporsi agregat yang lebih besar dari biasanya ini sebaiknya tidak lebih dari 20 persen dari agregat seluruhnya. Sedangkan untuk penentuan volume tampungan embung akan membandingkan antara 3 komponen, yaitu volume kebutuhan air, volume tampung topografi, dan volume ketersediaan air. Dalam perencanaan ini banyak digunakan kriteria-kriteria yang mengacu dalam Pedoman Kriteria Desain Embung Kecil untuk Daerah Semi Kering Indonesia. Adapun setelah dilakukan analisis, didapatkan tinggi embung 6 meter dengan volume tampungan efektif sebesar 12433.29 m3. Untuk bangunan spillway yang digunakan mengalirkan kelebihan air ketika terjadi banjir, digunakan overflow type dengan lebar 12 m dan tingi muka air maksimum yang direncanakan sebesar 0.50 m yang didapat dengan melakukan flood routing spillway menggunakan debit banjir rancangan kala ulang 50 tahun. Bangunan pelimpah ini nantinya akan menjadi satu dengan tubuh embung. Sehingga didapatkan biaya yang harus dialokasikan untuk pembangunan embung sebesar Rp 4,797,249,608.00 (Empat milyar tujuh ratus sembilan puluh tujuh dua ratus empat puluh sembilan enam ratus delapan rupiah)

English Abstract

Small dam is a building that serves to collect rain water for the supply of a village / region in the dry season. Referring to the Indication of Development Program of Tulungagung Regency Spatial Planning 2011-2031 with the implementation time of RPJM- 2 (2015-2019) and the result of analysis of potential local condition, the development plan of Banyuurip Small Dam is one of the alternative solutions to the problem of community raw water needs in Banyuurip Village. Existing conditions in the area of Banyuurip Small Dam plan has no baseflow or river that flows throughout the year so that during the dry season people find it difficult to obtain raw water and only expect from the source of rain water alone so it is necessary a water reservoir is expected to be full during the rainy season and operated during the dry season. The analysis in this planning study is intended to obtain the main building dimension of the small dam body and spillway along with the cost plan that must be allocated with effective storage that is planned to meet the amount of raw water demand of the population in accordance with the projected population for the next 25 years. The type of embung used in this plan is a concrete pit (cyclopean concrete) because it is based on consideration of material availability, soil geology (rock type foundation), narrow valley width, and cost consideration. Cyclopean concrete is the same type of concrete as normal concrete, the only difference in this concrete is the relatively large size of aggregate. The size of the coarse aggregate may be up to 20 cm, but this larger-than-usual aggregate proportion should be no more than 20 percent of the total aggregate. As for the determination of volume of embung pond will compare between 3 component, that is volume of water requirement, volume of topography, and volume of water availability. In this plan many criteria are used in reference to the Criteria of Small Dam Design for Semi Dry Indonesia Area. As after the analysis, obtained a high 6 meter embung with an effective volume of 17541.67 m3. For spillway buildings used to drain excess water during floods, overflow type is used with a width of 12 m and maximum water level planned for 0.50 m obtained by flood routing spillway using flood discharge 50 year re-design draft. This overflow building will become one with the body of small dam. So the cost that must be allocated for the construction of the small dam is Rp 4,797,249,608.00 (Four billion seven hundred ninety seven two hundred forty nine six hundred eight rupiah)

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2017/463/051705426
Uncontrolled Keywords: embung, spillway, cyclopean concrete
Subjects: 600 Technology (Applied sciences) > 628 Sanitary engineering > 628.1 Water supply > 628.14 Collection and distribution systems > 628.142 Collection systems
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Budi Wahyono Wahyono
Date Deposited: 30 Aug 2017 07:16
Last Modified: 08 Oct 2020 07:35
URI: http://repository.ub.ac.id/id/eprint/1918
[thumbnail of BAGIAN DEPAN.pdf]
Preview
Text
BAGIAN DEPAN.pdf

Download (683kB) | Preview
[thumbnail of 1.BAB I.pdf] Text
1.BAB I.pdf
Restricted to Repository staff only

Download (98kB)
[thumbnail of 2.BAB II.pdf] Text
2.BAB II.pdf
Restricted to Repository staff only

Download (750kB)
[thumbnail of 3.BAB III.pdf] Text
3.BAB III.pdf
Restricted to Repository staff only

Download (973kB)
[thumbnail of 4.BAB IV.pdf] Text
4.BAB IV.pdf
Restricted to Repository staff only

Download (4MB)
[thumbnail of 5.BAB V.pdf] Text
5.BAB V.pdf
Restricted to Repository staff only

Download (10kB)
[thumbnail of 0.DAFTAR PUSTAKA.pdf] Text
0.DAFTAR PUSTAKA.pdf
Restricted to Repository staff only

Download (9kB)

Actions (login required)

View Item View Item