Studi Perencanaan Pola Operasi Waduk Semantok Untuk Kebutuhan Air Irigasi Dan Air Baku Kabupaten Nganjuk Jawa Timur

Firdaus, Gemma (2020) Studi Perencanaan Pola Operasi Waduk Semantok Untuk Kebutuhan Air Irigasi Dan Air Baku Kabupaten Nganjuk Jawa Timur. Sarjana thesis, Universitas Brawijaya.

Abstract

Dibawah Satuan Kerja Balai Besar Wilayah Sungai (BBWS) Brantas sedang berlangsung proyek pembangunan Bendungan Semantok yang terjadwal dari Desember 2017 dan direncanakan selesai pada 2021. Terletak di Desa Sambikerep, Kecamatan Rejoso, Kabupaten Nganjuk Jawa Timur, pembangunan bendungan tersebut direncanakan memiliki kapasitas tamppungan waduk sebesar 18,3 juta m3 yang digunakan sebagai pasokan air irigasi dan air baku. Supaya kegiatan pengelolaan alokasi air dapat terpenuhi secara maksimal diperlukan suatu pola pengoperasian waduk. Pada studi ini, pendekatan pola pengoperasian yang digunakan adalah pendekatan tahunan (one year return) dan pedoman lepasan air berdasarkan status tampungan. Lepasan yang diatur jumlahnya adalah lepasan untuk irigasi, sementara lepasan untuk air baku besarnya konstan sepanjang tahun sebesar 312 lt/detik sesuai perencanaan. Debit inflow yang digunakan merupakan debit andalan hasil tranformasi data curah hujan menggunakan metode FJ Mock dengan empat kondisi aliran, yaitu debit cukup, debit normal, debit rendah, dan debit kering. Sedangkan kebutuhan air irigasi dihitung menggunakan metode standar perencanaan PU dengan pola tata tanam padi-padi-palawija dan lahan irigasi seluas 1825 ha sesuai dengan perencanaan. Hasil dari simulasi menunjukkan untuk kondisi debit cukup (keandalan debit 27,27%) kebutuan irigasi terpenuhi sebesar 100%, kondisi debit normal (keandalan debit 50,00%) kebutuhan irigasi terpenuhi sebesar 100%, kondisi debit rendah (keandalan debit 77,27%) kebutuhan irigasi terpenuhi sebesar 68%, dan kondisi debit kering (keandalan debit 95,45%) kebutuhan irigasi hanya terpenuhi 26%.

English Abstract

As part of the Balai Besar Wilayah Sungai (BBWS) Brantas Work Unit, the ongoing construction of the Semantok dam is planned for December 2017 and should be completed in 2021. The construction of the dam in the village of Sambikerep, Rejoso District, Nganjuk Regency, East Java, is said to have a storage capacity of 18.3 million m3, which will be used for the supply of irrigation water and raw water. A reservoir operating pattern is required to maximize the water distribution management activities. This study uses the annual approach (one year return) and water release guidelines based on the status of the reservoir as the operational model approach. The regulated quantities are those for irrigation, while the release for raw water is constant throughout the year as planned at 312 lt/s. The inflow load used is dependable flow of the results of the precipitation data transformation using the FJ mock method with four flow conditions, namely, sufficient discharge, normal discharge, low discharge and dry discharge. Irrigation water requirements are calculated using the standard PU (Dinas Pekerjaan Umum) planning method, with “padi-padi-palawija” crop pattern and irrigation land over an area of 1825 hectares. The results of the simulation show that with sufficient discharge conditions (27.27% discharge reliability) the irrigation requirement is 100% covered, with normal discharge conditions (50.00% discharge reliability) the irrigation requirement is 100% covered and with low discharge conditions (77.27% discharge reliability). The irrigation needs are covered to 68% and the irrigation needs for dry discharge (95.45% discharge reliability) is only met to 26%.

Other obstract

-

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2020/7/052003609
Uncontrolled Keywords: pola operasi waduk, simulasi, FJ Mock, debit andalan, Reservoir operation pattern, simulation, FJ Mock, dependable flow
Subjects: 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.5 Reclamations, Irrigation, related topics > 627.52 Irrigation
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Nur Cholis
Date Deposited: 22 Oct 2020 14:12
Last Modified: 11 Apr 2023 01:31
URI: http://repository.ub.ac.id/id/eprint/181707
[thumbnail of DALAM MASA EMBARGO] Text (DALAM MASA EMBARGO)
Gemma Firdaus.pdf
Restricted to Registered users only until 31 December 2023.

Download (10MB)

Actions (login required)

View Item View Item