Perencanaan Sistem Drainase Stadion Utama Pekan Olahraga Nasional XX/2020 di Distrik Sentani Timur, Kabupaten Jayapura, Provinsi Papua

Utami R, Tresna Asih (2019) Perencanaan Sistem Drainase Stadion Utama Pekan Olahraga Nasional XX/2020 di Distrik Sentani Timur, Kabupaten Jayapura, Provinsi Papua. Sarjana thesis, Universitas Brawijaya.

Abstract

Stadion utama yang akan digunakan untuk acara Pekan Olahraga Nasional (PON) XX di Kampung Harapan, Distrik Sentani Timur, Kabupaten Jayapura Provinsi Papua ini merupakan hal yang sangat penting bagi kota Papua itu sendiri. Sistem drainase stadion harus diperhatikan dengan baik agar menjaga berlangsungnya acara tersebut. Perencanaan sistem drainase stadion terbagi menjadi dua, yaitu sistem drainase bawah permukaan dan sistem drainase permukaan. Langkah awal yang dilakukan dalam perencanaan drainase adalah analisis hidrologi. Tahapan analisis hidrologi ini dimulai dengan pengumpulan data curah hujan dari Stasiun Sentani. Kemudian dilakukan perhitungan uji konsistensi data dan perhitungan curah hujan rancangan dengan kala ulang 5 tahun. Setelah didapat hasil curah hujan rancangan dengan kala ulang 5 tahun, dilakukan perencanaan struktur tanah pada lapangan sepak bola. Penggunaan bahan geosintetik seperti geokomposit direkomendasikan dalam perencanaan struktur tanah lapangan sepak bola. Setelah direncanakan struktur tanah pada lapangan sepak bola, dilakukan perhitungan jarak pipa drain, diameter pipa, dan kapasitas pipa drain pada lapangan sepak bola. Setelah melakukan perencanaan sistem drainase bawah permukaan, dilakukan perhitungan debit limpasan untuk mendapatkan perencanaan sistem drainase permukaan. Selain debit limpasan, debit air kotor dari tribun juga diperhitungkan. Hasil perhitungan curah hujan rancangan dengan kala ulang 5 tahun distribusi Log Pearson III didapat besarnya 134,39 mm. Hasil perencanaan struktur tanah pada lapangan sepak bola didapat lapisan paling atas di bawah muka rumput adalah pasir urug dan pupuk kandang (4:1) dengan tebal 15 cm. Lapisan kedua adalah pasir urug dengan tebal 10 cm. Pasir murni dibawahnya dengan tebal 5 cm. Lalu bahan geokomposit dengan tebal 1,17 cm. Kemudian batu koral diameter 3 – 10 mm dengan tebal 5 cm. Batu koral dengan diameter 10 – 20 mm tebal 15 cm. Setelah itu digunakan pipa pvc aw diameter 5” yang berada di bawah batu koral. Untuk perencanaan sistem drainase permukaan, terdapat 3 saluran utama, yaitu saluran I, II, dan III. Saluran I direncanakan dengan dimensi lebar = 0,35 m dan tinggi = 0,8 m. Saluran II direncanakan dengan dimensi lebar = 0,25 m dan tinggi = 0,3 m. Saluran III direncanakan dengan dimensi lebar = 1,0 m dan tinggi = 1,0 m. Selain saluran, terdapat tampungan untuk mengumpulkan air dari saluran. Bak penampung saluran I direncanakan dengan dimensi panjang =0,6 m, lebar = 0,6 m, dan tinggi = 1,0 m. Box Penampung saluran II direncanakan dengan dimensi panjang = 0,7 m, lebar = 0,7 m, dan tinggi = 1 m. Untuk mengalirkan air dari tampungan, digunakan pipa pvc aw dengan diameter 17” untuk aliran dari bak penampung menuju box penampung. Dan pipa dengan diameter 19” untuk mengalirkan air dari box penampung menuju saluran III. Setelah dari saluran III, air akan masuk ke tampungan dengan dimensi panjang = 3 m, lebar = 1,0 m, dan tinggi = 1 m sebelum menuju ke saluran pembuang. Saluran pembuang rencana dari hasil debit total yang masuk direncanakan dengan dimensi lebar = 1,75 m dan tinggi = 1,0 m.

English Abstract

The main stadium to be used for the XX National Sports Week (PON) in Kampung Harapan, East Sentani District, Jayapura District, Papua Province is very important for the city of Papua itself. The stadium drainage system must be considered carefully in order to maintain the ongoing event. Planning of stadium drainage system is divided into two, namely the subsurface drainage system and the surface drainage system. The first step in planning drainage is hydrological analysis. This stage of hydrological analysis begins with rainfall data collection from Sentani Station. Then the data consistency test and design rainfall calculations were calculated with a 5 year return period. After obtaining the results of the design rainfall with a 5-year return period, soil structure planning is carried out on the soccer field. The use of geosynthetic materials such as geocomposites is recommended in planning the soil structure of a soccer field. After the planned soil structure on the soccer field, the distance of the drain pipe, pipe diameter and drain pipe capacity are calculated on the soccer field. After planning the subsurface drainage system, a runoff discharge calculation is carried out to get a planned surface drainage system. In addition to runoff discharge, the discharge of dirty water from the stands is also taken into account. The results of the design rainfall calculation with a 5-year return period of the Log Pearson III distribution obtained an amount of 134.39 mm. The results of soil structure planning on the soccer field obtained the uppermost layer below the face of the grass is urug sand and manure (4: 1) with a thickness of 15 cm. The second layer is urug sand 10 cm thick. Pure sand below with 5 cm thick. Then the geocomposite material is 1.17 cm thick. Then coral diameter 3 - 10 mm with a thickness of 5 cm. Coral stone with a diameter of 10-20 mm 15 cm thick. After that, we use aw diameter 5 "pvc pipe under the coral. For planning the surface drainage system, there are 3 main channels, namely channels I, II, and III. Channel I is planned with dimensions of width = 0.35 m and height = 0.8 m. Channel II is planned with dimensions of width = 0.25 m and height = 0.3 m. Channel III is planned with dimensions of width = 1.0 m and height = 1.0 m. Apart from the channel, there is a pool to collect water from the canal. The first channel reservoir is planned with dimensions of length = 0.6 m, width = 0.6 m, and height = 1.0 m. Channel II container box is planned with dimensions of length = 0.7 m, width = 0.7 m, and height = 1 m. To drain water from the reservoir, use a pvc pipe aw with a diameter of 17 "for the flow from the reservoir to the container box. And a pipe with a diameter of 19 "to drain water from the container box to channel III. After channel III, the water will enter the reservoir with dimensions of length = 3 m, width = 1.0 m, and height = 1 m before heading to the drainage canal. The planned drainage channels from the total incoming discharge are planned with dimensions of width = 1.75 m and height = 1.0 m.

Other obstract

-

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2019/52/051904532
Uncontrolled Keywords: drainase, stadion, geokomposit, pipa, saluran, drainage, stadium, geocomposite, pipe, channel
Subjects: 600 Technology (Applied sciences) > 625 Engineering of railroads and roads > 625.7 Roads > 625.73 Earthwork > 625.734 Drainage
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Budi Wahyono Wahyono
Date Deposited: 05 Aug 2020 07:32
Last Modified: 05 Aug 2020 07:32
URI: http://repository.ub.ac.id/id/eprint/173606
Full text not available from this repository.

Actions (login required)

View Item View Item