Analisis Produktivitas Menggunakan Pendekatan Fungsi Produksi Cobb-Douglas dan Model Marvin E. Mundel (Studi Observasi: PT Maxzer Solusi Steril Malang)

Purnama, Chintia Indah (2019) Analisis Produktivitas Menggunakan Pendekatan Fungsi Produksi Cobb-Douglas dan Model Marvin E. Mundel (Studi Observasi: PT Maxzer Solusi Steril Malang). Sarjana thesis, Universitas Brawijaya.

Abstract

Produktivitas merupakan suatu ukuran dimana faktor produksi dapat digunakan dengan baik sehingga tercapai hasil tertentu yang diinginkan. Input produksi berupa tenaga kerja (gaji dan jam kerja), energi (pemakaian listrik pada mesin) dan material (material plat stainless steel dan inventory) menjadi aspek penting dalam produktivitas pada PT Maxzer Solusi Steril Malang. Hal ini perlu dilakukan penelitian analisis produktivitas dikarenakan faktor produksi tersebut belum digunakan secara optimal sehingga menimbulkan pemborosan (production waste). Pemborosan produksi berupa waktu kerja karyawan yang berlebihan dan tidak sesuai dengan waktu kerja reguler yang mengakibatkan penurunan etos kerja karyawan, pemborosan energi pada pemakaian listrik mesin produksi, kekurangan dan kelebihan bahan baku pada inventory dan terdapatnya sisa plat stainless steel yang tidak terpakai menjadi fokus penting perusahaan untuk memperbaiki sistem produksi menjadi lebih optimal. Analisis produktivitas ini bertujuan untuk mengetahui nilai dan kondisi produktivitas perusahaan dan dapat dilakukan perbaikan terhadap masalah produktivitas yang terjadi. Pada penelitian ini dilakukan analisis produktivitas tenaga kerja (input: gaji dan jam kerja), energi listrik dan material (plat stainless steel dan inventory) menggunakan fungsi produksi Cobb-Douglas untuk mengetahui koefisien fungsi produksi, indeks efisiensi produksi dan return to scale yang menggambarkan elastisitas produksi. Selain itu, metode analisis regresi linear juga dilakukan untuk menguji apakah input produksi berpengaruh terhadap output produksi. Uji ini terdiri dari uji asumsi regresi (uji autokorelasi, heteroskedastisitas dan multikolinearitas) dan uji koefisien regresi (uji F, uji t dan R2). Analisa permasalahan produktivitas perusahaan adalah dengan melakukan perhitungan indeks produktivitas (Model Marvin E. Mundel) dan fishbone diagram. Terdapat tiga kriteria produktivitas yaitu produktivitas total (output:kuantitas produksi yaitu harga penjualan produk dan input: kuantitas penggunaan tenaga kerja (gaji), penggunaan material plat stainless steel dan energi listrik), produktivitas jam kerja (output jam kerja aktual dan input jam kerja standar) dan produktivitas inventory (output kekurangan inventory dan input tambahan inventory). Hasil penelitian produktivitas menggunakan fungsi produksi Cobb-Douglas dengan kriteria produktivitas total, jam kerja dan inventory secara berturut-turut adalah sebesar Q = (990.210)(L-0.115)(E0.353)(M0.604), AT = (0,723)(ST1,113) dan KI = (1460,899)(TI0,436). Fungsi tersebut menunjukkan efisiensi produksi, tingkat produksi dan elastisitas produksi pada masing-masing produktivitas, dimana uji analisis regresi pada produktivitas tersebut didapatkan hasil bahwa setiap input mempengaruhi output dengan tingkat pengaruh yang berbeda-beda. Sementara itu, indeks produktivitas untuk setiap kriteria produktivitas mengalami kenaikan dan penurunan yang bervariasi selama tahun 2018. Permasalahan tersebut diselesaikan dengan fishbone diagram dan didapatkan rekomendasi perbaikan untuk meningkatkan produktivitas pada perusahaan.

English Abstract

Productivity is a measure where factors of production can be used properly so that certain desired results are achieved. Inputs of production in the form of labor (salaries and working hours), energy (electricity consumption in the engine) and material (stainless steel plate and inventory) are important aspects of the productivity of the Production Division of PT Maxzer Steril Solution in Malang. This needs to be done in productivity research because these production factors have not been used optimally, causing waste of production. Waste of production in the form of excessive employee work time and not in accordance with regular work time which results in a decrease in employee work ethic, waste of energy on electricity production machinery, lack and excess of raw materials in inventory and the presence of unused remaining stainless steel plates is an important focus of the company to improve the production system to be more optimal in order to achieve the desired production results. This productivity analysis aims to determine the value and conditions of company productivity and can be made improvements to productivity problems that occur. In this study an analysis of labor productivity (input are salary and working hours), electrical energy and material (stainless steel plate and inventory) using the Cobb-Douglas production function to determine the production function coefficient, production efficiency index and return to scale that describes elasticity production. In addition, a linear regression analysis method is also carried out to test whether production inputs affect production output. In addition, the linear regression analysis test consists of regression assumption tests (autocorrelation test, heteroscedasticity and multicollinearity) and regression coefficient tests (F test, t test and R2) also need to be done. Analysis of company productivity problems is by calculating productivity indexes (Marvin E. Mundel Model) and fishbone diagram. There are three productivity criteria, namely total productivity (output: production quantity, namely product sales prices and inputs: quantity of labor use (salary), use of stainless steel plate material and electrical energy), productivity of working hours (output of actual working hours and input of standard working hours ) and inventory productivity (output lacks inventory and additional inventory input). The results of this productivity study use Cobb-Douglas production function with total productivity criteria, working hours and inventory respectively are equal to Q = (990.210)(L-0.115)(E0.353)(M0.604), AT = (0,723)(ST1,113) and KI = (1460,899)(TI0,436). The function shows the production efficiency, production level and production elasticity in each productivity, where the regression analysis test on the productivity, results show that each input affects the output with different levels of influence. Meanwhile, the productivity index for the productivity criteria experienced varied increases and decreases during 2018. These problems were solved by fishbone diagrams and obtained recommendations for improvements to increase productivity in the company.

Other obstract

-

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2019/334/051904930
Uncontrolled Keywords: input, output, Cobb-Douglas, indeks produktivitas, fishbone diagram, input, output, Cobb-Douglas, productivity index, fishbone diagram
Subjects: 600 Technology (Applied sciences) > 670 Manufacturing
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Budi Wahyono Wahyono
Date Deposited: 17 Nov 2020 13:28
Last Modified: 17 Nov 2020 13:28
URI: http://repository.ub.ac.id/id/eprint/173092
Full text not available from this repository.

Actions (login required)

View Item View Item