Maqdum, Amru Nizar (2019) Implementasi Metode COCOMO II Untuk Estimasi Biaya engembangan Perangkat Lunak di CV. Profile Image Studio. Sarjana thesis, Universitas Brawijaya.
Abstract
Estimasi biaya perangkat lunak memegang peranan yang penting dalam hal pembuatan anggaran untuk proyek perangkat lunak. Dalam hal ini penentuan estimasi harga perangkat lunak di CV. Profile Image Studio belum mempunyai metode estimasi yang spesifik, sehingga sering menjadikan perusahaan mengalami kerugian secara finansial maupun waktu. Berangkat dari hal tersebut maka dalam penelitian ini akan mengimplementasikan metode COCOMO II (Constructive Cost Model) untuk menghitung biaya perangkat lunak sebagai saran kepada CV. Profile Image Studio. Estimasi biaya dapat diperoleh setelah mendapatkan nilai estimasi effort pengembangan sistem, sumber daya manusia dan juga estimasi waktu pengembangan sistem. Metode COCOMO II diimplementasikan kepada 2 sistem yang sudah selesai dikembangkan oleh CV. Profile Image Studio. Pada akhir penelitian ini, dilakukan perbandingan biaya pengembangan sistem, yaitu dengan membandingkan hasil estimasi biaya yang diperoleh menggunakan metode COCOMO II (Constructive Cost Model) dengan alokasi biaya yang dianggarkan oleh CV. Profile Image Studio. Adapun hasil dari implementasi metode COCOMO II dalam menghitung biaya perangkat lunak didapatkan bahwa total estimasi biaya sistem DBA ticketing sebesar Rp.61.344.000 yang dikerjakan oleh 3 orang dalam waktu 9 bulan sedangkan untuk sistem pintu air sebesar Rp.36.352.000 yang dikerjakan oleh 2 orang dalam waktu 8 bulan. Selisih estimasi biaya untuk seluruh perangkat lunak adalah sebesar 37,24% dengan selisih waktu sebesar 52,94% dan selisih SDM sebesar 40%. Sehingga metode COCOMO II akan lebih tepat dalam memperkirakaan estimasi biaya pada suatu proyek yang pada akhirnya dapat meminimalisir kerugian yang diterima oleh perusahaan
English Abstract
Software cost estimation is an important aspect of an software project for budgeting. In the process of determining the price of a system in CV. The Profile Image Studio does not have specific estimation. because of that make often the company receive losses both financially and time. Based on this case, the cost estimation in this study will implement COCOMO II (Constructive Cost Mode IIl) method is implemented in calculating software costs suggestion for CV. Profile Image Studio. Cost estimates can be obtained after obtaining estimated effort, number of human resources and estimated system development time. COCOMO II (Constructive Cost Model) method is implemented in 2 systems that have been developed by CV. Studio Profile Image. At the end of this study, the cost comparison of system development was done by comparing estimated cost results obtained using the COCOMO II (Constructive Cost Model) with the allocation of costs by CV. Studio Profile Image. The results of applying the COCOMO II (Constructive Cost Model II) method in calculating software costs, it was found that the total estimated cost of the DBA ticket system was Rp.61.344.000 carried out by 3 people in 9 month while pintu air system was Rp.36.352.000 carried out by 2 people in 8 month. Difference in estimated cost for all software is 37,24% with time difference is 52,94 and people difference is 40%. So the COCOMO II method will be more precise in estimating cost of a project that can be minimize the losses received by the company.
Other obstract
-
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | SKR/FILKOM/2019/436/051905849 |
Uncontrolled Keywords: | estimasi biaya, estimasi biaya perangkat lunak, COCOMO II, cost estimation, software cost estimation, COCOMO II. |
Subjects: | 000 Computer science, information and general works > 003 Systems > 003.2 Forecasting and forecasts |
Divisions: | Fakultas Ilmu Komputer > Sistem Informasi |
Depositing User: | Nur Cholis |
Date Deposited: | 24 Aug 2020 06:51 |
Last Modified: | 25 Oct 2021 02:13 |
URI: | http://repository.ub.ac.id/id/eprint/171604 |
Preview |
Text
Amru Nizar Maqdum-skripsi (2).pdf Download (3MB) | Preview |
Actions (login required)
View Item |