Putri, Laily Amalia (2018) Analisa Keruntuhan Bendungan Ponre Ponre Di Kabupaten Bone Provinsi Sulawesi Selatan Dengan Menggunakan Program Zhong Xing HY21. Sarjana thesis, Universitas Brawijaya.
Abstract
Bendungan disamping bermanfaat untuk memenuhi berbagai kepentingan bagi manusia, juga menyimpan potensi bahaya yang sangat besar, bila bendungan tersebut runtuh. Keruntuhan bendungan yang sering terjadi dikarenakan overtopping dan piping, maka diperlukan analisa keruntuhan bendungan (Dam Break Analysis) dan simulasi keruntuhan bendungan (Dam Break Simulation). Analisa dan simulasi keruntuhan bendungan adalah bentuk dari pencegahan-pencegahan secara teknis dan politis, dimana tertulis didalam peraturan dan undang-undang terikat oleh dokumen keamanan dokumen dan RTD bendungan. Dalam studi ini, menggunakan 2 buah stasiun hujan, yaitu Stasiun Bance dan Tapale. Sebelum data curah hujan dipakai dalam analisis hidrologi, data hujan harus terlebih dahulu diuji konsistensinya dengan metode RAPS (Rescaled Adjusted Partial Sums). sebelum mencari hujan rata-rata daerah data ini harus di uji outlier. selanjutnya mencari hujan rata-rata daerah data menggunakan metode Aritmatic. Untuk dapat menentukan besarnya curah hujan rancangan, metode yang digunakan dalam perhitungan ini adalah Log Normal. Kemudian diuji kesesuaian distribusi dengan menggunakan 2 metode yaitu uji Smirnov-Kolmogorov dan uji Chi-Square. Langkah selanjutnya adalah menghitung debit banjir rencana dengan menggunakan HSS Nakayasu dsn HSS Snyder, setelah menghitung debit banjir selanjutnya adalah menghitung Flood Routing dengan hasil Q PMF: 818.812 m3/det. Setelah menganalisa perhitungan hidrologi maka dilakukan simulasi dengan menggunakan software Zhong Xing HY21. Hasil yang diperoleh berupa peta genangan banjir, waktu tiba, waktu puncak, kedalaman, kecepatan dan elevasi banjir serta dapat menghasilkan cross section. Kondisi yang digunakan dalam software Zhong Xing HY21 adalah piping dengan kondisi muka air banjir dan Normal. Setelah itu dapat diketahui keruntuhan Bendungan Ponre Ponre dengan kondisi muka air banjir piping atas adalah kondisi terparah dengan luas genangan 40.8029 Km2 dan Total debit outflow puncak saat keruntuhan terjadi 141259.13662 m3/det.
English Abstract
Besides being useful for fulfilling various needs for humans, but also dam has a dangerous potential, if the dam were broken. Dam break that often occurs due to overtopping and piping, because of that dam break analysis is needed and dam break simulation too. Analysis and simulation of dam break is a form of technical and political prevention, which is written in the regulations and laws bound by document security and RTD dam documents. In this study, using 2 rain stations, namely Bance and Tapale Stations. Before rainfall data is used in hydrological analysis, first rainfall data must be tested for consistency using the RAPS method (Rescaled Adjusted Partial Sums). Before looking for the average rain area, it must be tested outlier. Then looking for the average rainfall in the area using the Aritmatic method. To be able to determine the amount of design rainfall, the method used in this calculation is Log Normal. Then the suitability of the distribution was tested using 2 methods, namely Smirnov-Kolmogorov test and Chi-Square test. The next step is to calculate the planned flood discharge by using Nakayasu HSS and Snyder HSS, after calculating the flood discharge, then calculate the Flood Routing with Q PMF results: 818,812 m3/sec. After analyzing hydrological calculations, a simulation using Zhong Xing HY21 software was carried out. The results from the software are flood inundation maps, arrival time, peak time, depth, speed and flood elevation and can produce cross sections. The conditions used in Zhong Xing HY21 software are piping with flood water conditions and Normal. After that, it can be seen the dam break of the Ponre Ponre Dam with the condition of the upper piping flood water level is the worst condition with an inundation area of 40,8029 km2 and the peak total outflow discharge occurs at 141259.13662 m3 / sec.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | SKR/FT/2018/1098/051812091 |
Uncontrolled Keywords: | Zhong Xing HY21, Overtopping, Piping, Ponre Ponre |
Subjects: | 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.8 Dams and reservoirs > 627.802 85 Dams and reservoirs (Computer applications) |
Divisions: | Fakultas Teknik > Teknik Pengairan |
Depositing User: | Budi Wahyono Wahyono |
Date Deposited: | 13 Mar 2019 07:17 |
Last Modified: | 29 Mar 2022 01:47 |
URI: | http://repository.ub.ac.id/id/eprint/163079 |