Yenny, - (2014) Produktifitas Alat dan Pekerja pada Pengecoran Plat/Balok Lantai Gedung (Studi Kasus Proyek Pembangunan Gedung FMIPA Universitas Brawijaya). Magister thesis, Universitas Brawijaya.
Abstract
Penelitian ini membahas mengenai produktifitas alat dan pekerja, pada pekerjaan pengecoran plat/balok lantai 4 (zone 2) dan lantai 5. Dimana pada lantai 4 digunakan alat concrete pump, sedangkan pada lantai 5 menggunakan tower crane. Sehingga dapat diidentifikasikan bahwa alat dan pekerja berpengaruh terhadap produktifitas pengecoran yang dihasilkan. Dengan produktifitas pengecoran ini maka dapat diketahui berapa besar pengaruh faktor alat dan pekerja terhadap produktifitas pengecoran, sehingga dapat diketahui faktor manakah yang paling besar pengaruhnya terhadap peningkatan produktifitas. Terdapat 2 macam data yaitu kualitatif (melalui penyebaran kuisioner) dan kuantitatif (pengamatan di lapangan). Dimana alat (X 1 ) dan pekerja (X 2 ) sebagai variabel bebas, produktifitas (Y 1 ) dan mutu beton (Y 2 ) sebagai variabel terikatnya. Semua data diuji terlebih dahulu dengan uji validitas, reliabilitas, dan koefisien determinasi, sebelum dilakukannya pengujian hipotesis. Dari analisis data diperoleh kesimpulan bahwa variabel alat sangat mempengaruhi produktifitas pengecoran pada pekerjaan plat/balok lantai 4, sedangkan pada lantai 5 adalah variabel pekerja. Produktifitas pengecoran lantai 4 diperoleh lebih besar dibandingkan pada lantai 5. Sehingga, dapat diindikasikan bahwa bertambahnya ketinggian suatu lantai, maka produktifitasnya juga akan menurun.
English Abstract
This study discusses tools and labor productivity, on work of casting plate/beam on 4 th floor (Zone 2), and 5 th floors. That`s on 4 th floor of tools used concrete pump, while on 5 th floor using a tower crane. refore it can be identified that tool and labor affect casting productivity of resulting. By casting productivity, it can be seen how much influence factors of tools and labor on productivity, so as to know which factors are most substantial influence on increase in productivity. re are two kinds of data are qualitative (by questionnaires) and quantitative (field observation). Where tools (X 1 ) and labors (X 2 ) as independent variables, productivity (Y 1 ) and quality of concrete (Y 2 ) as dependent variables. All data were tested first by test validity, reliability, and coefficient of determination, prior to hypo sis testing. By data analysis, we concluded that variable of tool affect productivity on task of casting plate/beam on 4 th floor, while on 5th floor affected by variable of labor. On 4 th floor value of casting productivity is greater than on 5 th floor. Thus, it can be indicated that increase in height of floor, so n productivity will decrease.
Item Type: | Thesis (Magister) |
---|---|
Identification Number: | TES/690/YEN/p/041404012 |
Subjects: | 600 Technology (Applied sciences) > 690 Construction of buildings |
Divisions: | S2/S3 > Magister Teknik Elektro, Fakultas Teknik |
Depositing User: | Endro Setyobudi |
Date Deposited: | 08 Sep 2014 13:47 |
Last Modified: | 04 Mar 2022 09:21 |
URI: | http://repository.ub.ac.id/id/eprint/160258 |
Preview |
Text
YENNY.pdf Download (10MB) | Preview |
Actions (login required)
View Item |