Abstract

Pengeboran pondasi bor pile atau pondasi sumuran dengan metode direct wash menggunakan mesin bor ringan telah digunakan pada banyak bangunan di Kalimantan Timur. Beragamnya keadaan di lapangan dan berbagai hambatan yang muncul selama proses pengeboran menyebabkan produktivitas pengeboran sangat beragam pada tiap lokasi pengeboran. Keberagaman keadaan di lapangan dipengaruhi oleh beberapa faktor antara lain: faktor alam, manusia, mesin, manajemen dan metode pelaksanaan. Produktivitas pengeboran pondasi bor pile perlu diketahui oleh pihak penyedia maupun pengguna jasa pengeboran untuk dapat menentukan biaya dan waktu yang diperlukan untuk menyelesaikan suatu pekerjaan pengeboran. Penelitian terhadap produktivitas pengeboran pondasi ini bertujuan untuk mengetahui faktor-faktor yang mempengaruhi produktivitas pengeboran pondasi bor pile dengan metode direct wash serta pengaruhnya terhadap produktivitas pengeboran yang dinyatakan dalam satuan panjang per satuan waktu. Pengumpulan data dalam penelitian ini dilakukan dengan studi literatur, wawancara dan eksperimen. Dari data yang terkumpul melaui wawancara didapat 12 faktor yang mempengaruhi produktivitas pengeboran. Dengan uji korelasi faktor-faktor tersebut disaring menjadi 4 faktor yang paling berpengaruh pada produktivitas pengeboran yaitu kekerasan tanah (X1.2, daya mesin X4.1, diameter lubang bor X6.1 dan kedalaman X6.2. Dengan menggunakan program PASW 18 hubungan antara variabel bebas kekerasan tanah, diameter lubang bor dan kedalaman pengeboran dengan produktivitas pengeboran sebagai variabel terikat dibentuk melalui analisa regresi berganda dan dinyatakan dengan persamaan Y = e(2,608 – 0,33 X1.2 - 0,068 X4.1 – 0,024 X6.1 – 0,054X6.2).

English Abstract

Drilled shaft pile or bored pile foundations which is installed by using light machine with direct wash method had been applied to many building foundations in East Kalimantan. installation of bored pile foundation is complicated by enormous number of problems where various site conditions make it difficult for estimator to evaluate drilling productivity. Natural factors, human, machine, management and method are main factors that affect drilling productivity. productivity drilling process that is stated by unit length per unit time is needed to be estimated by building owners, contractors and project consultants in order to estimate cost and activities duration of a drilling project. Project cost and duration could be well estimated if re is a base of productivity calculation. Data were collected trough designed questionnaires, site interviews, observations and experiments. From questionnaires and site interviews many variables have been considered as factors that affect drilling process. By using PASW 18 four main factors that affect productivity of pile drilling process could be determined as; soil hardness (X1.2), engine horse power (X4.1), bored pile diameter (X6.1)and drilling depth (X6.2). A regression model is established where productivity of drilling construction process is expressed in Y = e(2,608 – 0,33 X1.2 - 0,068 X4.1 – 0,024 X6.1 – 0,054X6.2

Item Type: Thesis (Magister)
Identification Number: TES/622.338 1/DHI/a/041402603
Subjects: 600 Technology (Applied sciences) > 622 Mining and related operations > 622.3 Mining for specific materials
Divisions: S2/S3 > Magister Teknik Sipil, Fakultas Teknik
Depositing User: Budi Wahyono Wahyono
Date Deposited: 14 May 2014 09:19
Last Modified: 14 May 2014 09:19
URI: http://repository.ub.ac.id/id/eprint/158739
Full text not available from this repository.

Actions (login required)

View Item View Item