Syaief, AdhielaNoer (2012) Perancangan Maintenance Value Stream Mapping (MVSM) pada Ketel Yoshimine I Stasiun Ketel guna Meningkatkan Kualitas Pemeliharaan di PT. PG. X Malang. Magister thesis, Universitas Brawijaya.
Abstract
Usia pabrik yang tua dan alat-alat produksi yang aus adalah salah satu penyebab utama tingginya downtime akibat kerusakan mesin di pabrik gula. Akibat dari kegagalan mesin tersebut akan menyebabkan terjadinya downtime yang menggangu kelancaran produksi dan menyebabkan turunnya tingkat produktivitas. Sistem perawatan yang dijalankan di PT. PG X Malang belum terencana dan terlaksana dengan baik sehingga waktu yang diperlukan untuk melakukan proses maintenance hingga mesin/peralatan siap dijalankan kembali semakin lama. Penelitian ini memetakan aktivitas perawatan dengan menggunakan value stream mapping (VSM) guna mendeteksi kegiatan-kegiatan value added dan non value added . Langkah-langkah dalam maintenance value stream mapping (MVSM) yaitu mendeteksi kegiatan-kegiatan non value added dengan merancang sebuah current state mapping yang akan menjadi sebuah acuan awal untuk usulan pengembangan sistem perawatan yang akan ditawarkan, identifikasi faktor-faktor penyebab perawatan yang kurang efektif dengan cause and effect diagram serta mengembangkan sistem perawatan yang efisien dan efektif dengan memetakan pada sebuah future state mapping guna memberi kemudahan dalam menjalankan prosedur perawatan yang akan dijalankan. Berdasarkan hasil pengamatan yang dilakukan, generatting tube merupakan komponen ketel yoshimine 1 yang paling sering mengalami kerusakan yaitu sebanyak 8 kali. Dari analisa yang dilakukan dimana dapat terdeteksi kegiatan yang termasuk dalam kategori pemborosan yang juga berarti merupakan kegiatan non value added berasal dari respon operator yang lambat, ketidaktersediaan komponen dan operator perawatan yang tidak ada ditempat. Perhitungan variabel-variabel maintenance value stream mapping (MVSM) yaitu rata-rata waktu mean time to organize (MTTO) selama 35.64 menit, mean time to repair (MTTR) selama 57.02 menit, mean time to yield (MTTY) selama 5.19 menit dan rata-rata waktu mean maintenance lead time (MMLT) adalah 97.85 menit dengan % efisiensi perawatan yang dilakukan adalah sebesar 58.27 %.
English Abstract
old factories and production tools is one of main causes of downtime due to mechanical failure in sugar factories. effect of mechanical machine will lead to downtime that disturbing smooth production and decrease in productivity. Maintenance system in PT. PG X Malang has not been planned and implemented, so time required to doing maintenance process machine or tools is ready to run a long time. This study mapped maintenance activity using value stream mapping (VSM) to detect activities value added and non value added. steps in maintenance process value stream mapping (MVSM) to detect activities of non value added with designing of a current state mapping that will be a beginning reference for proposed development system will be offered , identifying factors that cause are effective with cause and effect of diagram and developing system that efficient and effective with mapped a future state mapping in order to facilitates in conducting maintenance procedures that will be executed. Based on observations, generatting tube is a component of yoshimine boiler of most often damaged as many as 8 times. From analysis carried out which can be detected in categories of activities that include waste which also means a non-value added activities comes from slow response of operators, unavailability of components and operators of maintenance that is not re. Calculation of maintenance variables velue stream mapping (MVSM) which is an average time of mean time to organize (MTTO) is 35.64 minutes, mean time to repair (MTTR) is 57.02 minutes, mean time to yield (MTTY) is 5.19 minutes and average average maintenance time of mean lead time (MMLT) is 97.85 minutes with efficiency of maintenance is 58.27 %.
Item Type: | Thesis (Magister) |
---|---|
Identification Number: | TES/621.183/SYA/p/041204227 |
Subjects: | 600 Technology (Applied sciences) > 621 Applied physics > 621.1 Steam engineering |
Divisions: | S2/S3 > Magister Teknik Elektro, Fakultas Teknik |
Depositing User: | Endro Setyobudi |
Date Deposited: | 14 Dec 2012 13:09 |
Last Modified: | 14 Dec 2012 13:09 |
URI: | http://repository.ub.ac.id/id/eprint/158615 |
Actions (login required)
View Item |