Anjartami, Pristi (2016) Analisis Lean Manufacturing Untuk Minimasi Pemborosan Pada Proses Produksi Karet Rss (Studi Kasus Di Pt Mulyaningsih, Perkebunan Durjo). Sarjana thesis, Universitas Brawijaya.
Abstract
PT Mulyaningsih (Perkebunan Durjo) merupakan perusahaan yang bergerak di bidang pengolahan lateks menjadi karet Ribbed Smoked Sheet (RSS). Permasalahan yang ada di PT Mulyaningsih (Perkebunan Durjo) adalah jumlah produk cacat yang tinggi, dibandingkan dengan target perusahaan yang hanya sebesar 1%. Tujuan dari penelitian adalah untuk mengidentifikasi tipe dan penyebab waste pada proses produksi karet RSS, serta merumuskan rekomendasi perbaikan dalam mengeliminasi waste pada proses produksi karet RSS di PT Mulyaningsih (Perkebunan Durjo). Penelitian dilakukan dengan menggunakan metode lean manufacturing yang merupakan suatu metodologi untuk mengeliminasi aktivitas non value added. Identifikasi waste menggunakan kuesioner yang disebarkan kepada enam responden yang memahami keseluruhan proses produksi. Pemetaan dilakukan dengan Value Stream Mapping (VSM), dilanjutkan pemetaan penyebab waste menggunakan Value Stream Analysis Tools (VALSAT). Proses produksi karet RSS terdiri dari waktu VA 7735,44 menit; waktu NVA 38,48 menit; dan total waktu NNVA adalah 9,06 menit. Pemborosan yang terjadi adalah inappropriate processing, transportation, unnecessary motion, waiting, dan defects. Pemetaan penyebab pemborosan menggunakan process activity mapping. Rekomendasi perbaikan diberikan pada masing-masing waste untuk minimasi aktivitas dan waktu yang tidak memiliki nilai tambah. Pada future state map waktu proses dari 7784,37 menit menjadi 7760,8 menit.
English Abstract
PT Mulyaningsih (Durjo Plantation) is a company engaged in the processing latex into Ribbed Smoked Sheet (RSS) rubber. The problem existed in PT Mulyaningsih (Durjo Plantation) was the high number of defect products which was compared with the company target of defect products that was only 1%. The purpose of the study was to identify types and causes of waste in the production process of RSS rubber, and formulate some recommendations for improvement to eliminate waste in the production process of rubber RSS at PT Mulyaningsih (Durjo Plantation). This research conducted by using lean manufacturing method which is a methodology by eliminating non value added activities. Identification type of waste used questionnaire which were distributed to six respondents who understood the whole of production process. The mapping done with Value Stream Mapping (VSM), followed by mapping the causes of waste using Value Stream Analysis Tools (VALSAT). RSS rubber production process consisted of the time of VA was 7735,44 minutes; time of NVA was 38,48 minutes; and time of NNVA was 9,06 minutes. The waste occurred in the production process was inappropriate processing, transportation, unnecessary motion, waiting, and defects. Mapping the cause of waste used process activity mapping. Recommendations for the improvement given to each types of waste to minimize activities and time for non-value added. In the future state map time of process from 7784,37 minutes to 7760,8 minutes.
Other obstract
-
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | SKR/FTP/2016/298/ 051606739 |
Subjects: | 300 Social sciences > 338 Production > 338.1 Agriculture |
Divisions: | Fakultas Teknologi Pertanian > Teknologi Hasil Pertanian |
Depositing User: | Kustati |
Date Deposited: | 19 Sep 2016 09:38 |
Last Modified: | 09 Jun 2022 08:27 |
URI: | http://repository.ub.ac.id/id/eprint/150847 |
![]() |
Text
Untitled.pdf Restricted to Registered users only Download (3MB) |
Actions (login required)
![]() |
View Item |