KarintaHapsari, Rana (2017) Studi Evaluasi Penerapan Hujan Buatan Terhadap Volume Aliran pada DAS Brantas Hulu. Sarjana thesis, Universitas Brawijaya.
Abstract
Unit Pelaksana Teknis (UPT) hujan buatan Badan Pengkajian dan Penerapan Teknologi (BPPT) yang bekerjasama dengan instansi Perum Jasa Tirta I dan TNI AU Lanud Abdulrachman Saleh melakukan kegiatan modifikasi cuaca berupa hujan buatan pada tanggal tahun 2013. Kegiatan ini bertujuan untuk meningkatan tinggi muka air waduk yang terdapat pada DAS Brantas hulu, salah satunya Waduk Sutami. Meskipun belum memasuki musim kemarau, namun inflow Waduk Sutami berada pada angka 75,5 m3/detik, sementara angka ideal yang ditetapkan Pemerintah Provinsi Jawa Timur (Pemprov Jatim) yaitu 96,5 m3/detik. Kegiatan mengevaluasi peningkatan curah hujan dan volume aliran akibat hujan buatan dilakukan agar mengetahui seberapa besar tingkat keberhasilan hujan buatan tersebut. Lokasi pelaksanaan kegiatan hujan buatan berada di DAS Brantas hulu. Kegiatan tersebut dilaksanakan pada tanggal 9 Mei – 4 Juni 2013. Dalam mengevaluasi tingkat keberhasilan hujan buatan, metode yang digunakan adalah metode Rasio Ganda dan Debit Aliran. Kedua metode tersebut menggunakan data historis tahun 1991-2011 dan data aktual tahun 2013. Metode Rasio Ganda merupakan metode yang membandingkan hujan daerah target dan daerah kontrol pada saat kegiatan hujan buatan maupun saat tidak terjadi kegian hujan buatan. Metode ini bertujuan untuk mengetahui tingkat penambahan curah hujan dengan menghilangkan atau mengurangi variasi curah hujan alam yang ada pada saat pelaksanaan hujan buatan. Daerah target yaitu DAS Brantas hulu yang diwakili 12 stasiun hujan dan daerah kontrol yang berjarak ± 30 km dari batas DAS Brantas hulu diwakili 5 stasiun hujan. Kedua daerah ini memiliki keterkaitan yang cukup erat (r = 0,91). Metode Debit Aliran merupakan metode yang menggunakan perbandingan nilai debit aliran saat kegiatan hujan buatan dengan nilai debit aliran saat tidak ada kegiatan hujan buatan. Perhitungan ini menggunakan debit inflow Waduk Sutami. Peningkatan volume aliran langsung didapatkan dengan mengurangi nilai volume aliran langsung historis dengan nilai volume aliran langsung aktual. Dari hasil analisa dan pembahasan, peningkatan curah hujan akibat hujan buatan yang analisa menggunakan metode Rasio Ganda mendeteksi adanya peningkatan sebesar 152,44%. Dengan adanya peningkatan curah hujan pada DAS Brantas hulu maka terjadi peningkatan juga pada debit aliran Waduk Sutami. Hasil analisa peningkatan volume aliran pada Waduk Sutami sebesar 74,19%.
English Abstract
Technical Managing Unit (UPT) for Artificial Rain from the Agency of Technological Review and Application (BPPT) had made a collaborative work with Perum Jasa Tirta I and TNI AU Lanud Abdulrachman Saleh to conduct the activity of weather modification to produce artificial rain on 2013. This activity was aimed to increase the height of water front in the reservoirs at DAS Brantas Hulu. One of reservoir was Waduk Sutami. Although dry season was not coming yet, the inflow already declined at 75.5 m3/second. It was below the ideal rate expected by the Government of East Java Province, which counted at 96.5 m3/second. The evaluation of rainfall and post-rain stream volume was conducted to examine how much was the success rate of artificial rain. The location of artificial rain producing activity was focused on DAS Brantas Hulu. This activity was conducted from 9 May to 4 June 2013. For evaluating the success rate of artificial rain, the used methods were Multiple Ratio and Stream Discharge. Both methods were subjected against historical data on period 1991-2011 and actual data on period 2013. Multiple Ratio was a method to compare the rainfall at target area and at control area during and without the occurence of artificial rain. This method was employed to understand rainfall increment rate by eliminating or reducing the variance of natural rainfall during the production of artificial rain. Two target area were involved, respectively DAS Brantas Hulu that was represented by 12 rain stations, and also Control Area that was distanced for ± 30 km from the border of DAS Brantas Hulu and was represented by 5 rain stations. Both areas had very close linkage (r = 0.91). Stream Discharge was a method that compared stream discharge rate during and without artificial rain production. The processed data in this method were the data of inflow debit at Waduk Sutami. The increment of direct stream volume was obtained by subtracting the historical rate of stream volume with the actual rate of stream volume. As indicated by the result of analysis and discussion, artificial rain had succesfully increased rainfall volume. The result of analysis with Multiple Ratio method showed that the detected increment was 152.44%. Rainfall increment at DAS Brantas Hulu increased stream discharge at Waduk Sutami. Result of the analysis on stream volume increment at Waduk Sutami has found that stream volume had increased to 74.19%.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | SKR/FT/2017/41/051701194 |
Subjects: | 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.5 Reclamations, Irrigation, related topics > 627.52 Irrigation |
Divisions: | Fakultas Teknik > Teknik Pengairan |
Depositing User: | Sugiantoro |
Date Deposited: | 24 Feb 2017 09:02 |
Last Modified: | 24 Oct 2021 09:31 |
URI: | http://repository.ub.ac.id/id/eprint/145594 |
Preview |
Text
4._DAFTAR_ISI.pdf Download (1MB) | Preview |
Preview |
Text
7._RINGKASAN_SUMMARY.pdf Download (1MB) | Preview |
Preview |
Text
9._BAB_II_LANDASAN_TEORI.pdf Download (2MB) | Preview |
Preview |
Text
8._BAB_I_PENDAHULUAN.pdf Download (1MB) | Preview |
Preview |
Text
10._BAB_III_METODE_PENELITIAN.pdf Download (2MB) | Preview |
Preview |
Text
11._BAB_IV_ANALISA_DAN_PEMBAHASAN.pdf Download (3MB) | Preview |
Preview |
Text
12._BAB_V_PENUTUP.pdf Download (1MB) | Preview |
Preview |
Text
13._DAFTAR_PUSTAKA.pdf Download (1MB) | Preview |
Preview |
Text
JURNAL_STUDI_EVALUASI_PENERAPAN_HUJAN_BUATAN_TERHADAP_VOLUME_ALIRAN_PADA_DAS_BRANTAS_HULU.pdf Download (2MB) | Preview |
Preview |
Text
1._COVER.pdf Download (1MB) | Preview |
Preview |
Text
2._LEMBAR_PENGESAHAN.pdf Download (1MB) | Preview |
Actions (login required)
![]() |
View Item |