Evaluasi Sistem Drainase Di Daerah Simo Gunung, Simo Mulyo Barat, Simo Mulyo, Darmo Satelit, Dan Darmo Indah Yang Berada Di Surabaya Barat.

Fitri, Annisaa (2017) Evaluasi Sistem Drainase Di Daerah Simo Gunung, Simo Mulyo Barat, Simo Mulyo, Darmo Satelit, Dan Darmo Indah Yang Berada Di Surabaya Barat. Sarjana thesis, Universitas Brawijaya.

Abstract

Salah satu kawasan yang sering terjadi banjir di Surabaya adalah pada Sistem Drainase Gunungsari yang berada di Surabaya Barat. Sistem drainase ini memiliki saluran primer Gunungsari yang menampung debit banjir dari saluran sekunder diantaranya saluran sekunder Darmo Indah, Darmo Harapan, Darmo Satelit, Kupang Jaya, Simo Mulyo, Simo Mulyo Barat, dan Simo Gunung. Berdasarkan data genangan “Dinas Pekerjaan Umum dan Bina Marga dan Pematusan Surabaya”, tinggi genangan yang terjadi pada sistem drainase ini rata-rata 30-50 cm dengan lama genangan rata-rata satu jam. Genangan air atau banjir terjadi di beberapa saluran antara lain saluran tersier Raya Satelit Utara, saluran sekunder Darmo Harapan, saluran sekunder Kupang Jaya (bagian hilir) dan saluran sekunder Simo Gunung (bagian hulu). Penyebab banjir yang terjadi pada saluran tersier dan sekundernya dikarenakan oleh kurangnya kapasitas dari saluran tersebut. Analisis yang dilakukan pada tugas akhir ini meliputi analisis hidrologi dan analisis hidrolika. Analisis hidrologi memperhitungkan curah hujan rencana periode ulang dua, lima, sepuluh tahun dengan distribusi Log Pearson III, serta perhitungan debit banjir rencana periode ulang sepuluh tahun dengan metode rasional. Untuk perhitungan analisis hidrolika dilakukan untuk mengetahui kapasitas eksisting penampang saluran. Hasil dari evaluasi sistem drainase dilakukan dengan membandingkan debit eksisting dengan debit banjir rencana. Berdasarkan hasil analisis hidrologi dengan perhitungan debit rencana kala ulang 10 tahun dan analisis hidrolika, ada beberapa saluran sekunder yang masih terjadi banjir (kapasitas saluran < debit banjir rencana) antara lain saluran sekunder Darmo Indah ruas 5-2 dengan Qkap. dan Qmaks. masing–masing sebesar 2,49m3/det dan 9,727 m3/det ; Darmo Harapan ruas 4-5 dengan Qkap. dan Qmaks. masing–masing sebesar 2,90 m3/det dan 4,719 m3/det ; Darmo Satelit ruas 7-8 dengan Qkap. dan Qmaks. masing–masing sebesar 4,08 m3/det dan 4,891 m3/det ; Kupang Jaya ruas 10-11 dengan Qkap. dan Qmaks. masing– 14 masing sebesar 7,52 m3/det dan 9,544 m3/det ; Simo Mulyo ruas 14-15 dengan Qkap. dan Qmaks. masing–masing sebesar 9,80 m3/det dan 13,484 m3/det ; Simo Gunung ruas 18-19 dengan Qkap. dan Qmaks. sebesar 1,31 m3/det dan 6,766 m3/det. Kapasitas eksisting saluran sekunder tidak mampu untuk menampung debit banjir maksimum dengan kala ulang 10 tahun. Oleh karena itu, solusi yang digunakan untuk mengatasi banjir yaitu dengan mendesain ulang saluran dengan menambah kapasitas saluran. Saluran sekunder Darmo Indah ruas 5-2, selain mendesain ulang dimensi saluran juga perlu dibuat long storage pada saluran itu sendiri untuk menampung debit banjir dari saluran sekunder Darmo Indah dan Darmo Harapan.

English Abstract

One of area which often flooding in Surabaya is on Gunungsari Drainage Systems which in West Surabaya. This Drainage system has a Gunungsari primary channel that accommodate the flood discharge from the secondary channel including secondary channel Darmo Indah, Darmo Harapan, Darmo Satelit, Kupang Jaya, Simo Mulyo, West Simo Mulyo, and Simo Gunung. Based on the data reports inundation "Department of Public Works and Highways and drainage Surabaya", the water level that occurs in the drainage system is 30-50 cm and length of inundation average two hours. Flooding occur in several channels including tertiary canals Raya Satelit Utara, Darmo Harapan secondary channel, Kupang Jaya secondary channel (downstream) and secondary channels Simo Gunung (upper part). The causes of the flooding that occurred in the tertiary and secondary channels due to the lack of capacity of the channel and other factors cause of that flooding. Analysis that conducted in this final project includes the analysis of hydrology and hydraulics analysis. Hydrological analysis takes into account the plan period of rainfall two, five, ten years with the Log Pearson III distribution, as well as the calculation of flood discharge plan a return period of ten years with a rational method. For the calculation of hydraulics analysis was conducted to determine the channel cross-section of the existing capacity. The results of the evaluation drainage system did with comparing the existing discharge flood discharge plan. Based on the analysis of hydrological with calculation stage design discharge 10years and hydraulics analysis, there are several secondary channels that still floods (the channel capacity < debit flood plan), among others, the secondary channel Darmo Indah point 5-2 by the channel capacity of 2,49 m3/s, while the flood discharge plan 9,727 m3/s; Darmo Harapan 4-5 point with the channel capacity of 2,90 m3/s, while the flood discharge plan 4,719 m3/s; Kupang Jaya point 10-11 with the existing channel capacity of 7,52 m3/s, while the flood discharge plan 9,150 m3/ s; Simo Mulyo 14-15 point with the channel capacity of 9,80 m3/s at flood discharge plan 13,541 m3/s; Simo Mount point 18-19 with the channel capacity of 1,31 m3 / s, while the flood discharge plan 6,766 m3 / sec. Secondary channels of the existing capacity is unable to accommodate the flood discharge plan with a return period of 10 years. Therefore, the solutions used to address flooding is to redesign the channel by adding the width and height of the channel. For the secondary channel Darmo Indah point 5-2, in addition to a redesign done long storage channels need to be made in the channel itself to accommodate the flood discharge from the secondary channel Darmo and Darmo Harapan Indah.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2017/364/051704154
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Kustati
Date Deposited: 05 Jun 2017 13:13
Last Modified: 24 Oct 2021 09:21
URI: http://repository.ub.ac.id/id/eprint/145588
[thumbnail of 2._KATA_PENGANTAR.pdf]
Preview
Text
2._KATA_PENGANTAR.pdf

Download (1MB) | Preview
[thumbnail of 4._DAFTAR_TABEL.pdf]
Preview
Text
4._DAFTAR_TABEL.pdf

Download (1MB) | Preview
[thumbnail of 3._DAFTAR_ISI.pdf]
Preview
Text
3._DAFTAR_ISI.pdf

Download (1MB) | Preview
[thumbnail of 5._DAFTAR_GAMBAR.pdf]
Preview
Text
5._DAFTAR_GAMBAR.pdf

Download (1MB) | Preview
[thumbnail of 7._RINGKASAN.pdf]
Preview
Text
7._RINGKASAN.pdf

Download (1MB) | Preview
[thumbnail of 6._DAFTAR_LAMPIRAN.pdf]
Preview
Text
6._DAFTAR_LAMPIRAN.pdf

Download (1MB) | Preview
[thumbnail of 8._SUMMARY.pdf]
Preview
Text
8._SUMMARY.pdf

Download (1MB) | Preview
[thumbnail of 9._BAB_I_-_PENDAHULUAN.pdf]
Preview
Text
9._BAB_I_-_PENDAHULUAN.pdf

Download (2MB) | Preview
[thumbnail of 11._BAB_III_-_METODE_PENELITIAN.pdf]
Preview
Text
11._BAB_III_-_METODE_PENELITIAN.pdf

Download (1MB) | Preview
[thumbnail of 10._BAB_II_-_TINJAUAN_PUSTAKA.pdf]
Preview
Text
10._BAB_II_-_TINJAUAN_PUSTAKA.pdf

Download (2MB) | Preview
[thumbnail of 14._DAFTAR_PUSTAKA.pdf]
Preview
Text
14._DAFTAR_PUSTAKA.pdf

Download (1MB) | Preview
[thumbnail of 15._DOKUMENTASI.pdf]
Preview
Text
15._DOKUMENTASI.pdf

Download (2MB) | Preview
[thumbnail of 12._BAB_IV_-_HASIL_DAN_PEMBAHASAN.pdf]
Preview
Text
12._BAB_IV_-_HASIL_DAN_PEMBAHASAN.pdf

Download (3MB) | Preview
[thumbnail of 13._BAB_V_-_PENUTUP.pdf]
Preview
Text
13._BAB_V_-_PENUTUP.pdf

Download (1MB) | Preview
[thumbnail of SKRIPSI_-_ANNISAA_FITRI_145060109111007.pdf]
Preview
Text
SKRIPSI_-_ANNISAA_FITRI_145060109111007.pdf

Download (5MB) | Preview
[thumbnail of UJIAN_TERBUKA_S1_(SEMINAR_HASIL)_-_ANNISAA_FITRI.pdf]
Preview
Text
UJIAN_TERBUKA_S1_(SEMINAR_HASIL)_-_ANNISAA_FITRI.pdf

Download (4MB) | Preview
[thumbnail of 1._SAMPUL.pdf]
Preview
Text
1._SAMPUL.pdf

Download (1MB) | Preview

Actions (login required)

View Item View Item