Setyawan, YogaCandra (2015) Analisis Stabilitas Transien Secara Probabilitas Pada Sistem Interkoneksi Jawa Bali 500 Kv Dengan Metode Simulasi Monte Carlo. Sarjana thesis, Universitas Brawijaya.
Abstract
Perusahaan tenaga listrik di berbagai negara di dunia telah mengalami banyak kemajuan. Perusahaan Listrik Negara (PLN) Indonesia, selaku perusahaan listrik milik Negara Indonesia pun telah mengalami perubahan yang cukup pesat. Kebutuhan beban listrik yang terus meningkat menyebabkan PLN meningkatkan efisiensi dari sistem tenaga listrik. Namun untuk menganalisis permasalahan sistem tenaga listrik saat ini sangatlah sulit jika dilakukan dengan memakai metode tradisional dikarenakan sistemnya yang telah kompleks, khususnya mengenai permasalahan stabilitas, keandalan, dan perencanaan sistem tenaga listrik. Tujuan dari penulisan skripsi ini adalah untuk mengevaluasi stabilitas transien dalam sistem tenaga listrik secara probabilitas. Kestabilan yang dibahas dalam skripsi ini adalah kestabilan sudut rotor karena pengaruh kestabilan sudut rotor cukup besar. Ketidakpastian dari waktu kerja relai dan nilai beban dari sistem jaringan listrik menjadi kunci yang penting dalam evaluasi kestabilan sistem tenaga listrik secara probabilitas. Permasalahan dalam evaluasi kestabilan sistem tenaga listrik disini adalah bagaimana kestabilan sistem saat terjadi gangguan 3 fasa ke tanah, bagaimana dengan waktu pemutusan kritis pada saluran, dan dimana letak saluran yang paling rawan apabila terjadi gangguan. Untuk mengevaluasi banyaknya ketidakpastian dalam analisis kestabilan tersebut maka diperlukan suatu metode tambahan selain metode stabilitas transien yang seperti biasanya, yaitu dengan menambahkan metode simulasi secara Monte-Carlo. Metode Simulasi Monte-Carlo adalah menghimpun dan menganalisis sampel data berdasarkan eksperimen statistik. Dalam simulasi ini akan dilakukan dengan mengacak secara random pada variabel waktu kerja relai dan beban listrik. Dengan demikian diharapkan hasil analisis nanti akan lebih mendekati dalam kondisi yang sebenarnya dimana variabel-variabel tersebut berubah sepanjang waktu. Dalam simulasi ini, diasumsikan waktu pemutusan kritis generator saat terjadi gangguan hubung singkat tiga fasa. Simulasi akan dilakukan dengan program MATLAB. Adapun untuk hasil akhir yang diharapkan dari studi analisis transien secara probabilitas ini adalah untuk mengetahui letak saluran yang rawan dalam suatu sistem tenaga listrik. Model sistem jaringan listrik yang digunakan untuk analisis stabilitas transien secara probabilitas ini adalah model sistem tenaga listrik Jawa-Bali 500 kV milik PT. PLN Persero. Kesimpulan dari penulisan skripsi ini adalah sistem masih dalam kondisi baik karena sudut rotor tetap stabil ketika dilakukan simulasi sesuai dengan peraturan jaringan listrik yang terdapat pada ESDM 2007. Diperoleh juga kesimpulan bahwa saluran nomer 6, yaitu saluran yang menghubungkan antara bus 5 dengan bus 8, adalah saluran yang paling rawan apabila terjadi gangguan 3 fasa ke tanah dibandingkan dengan saluran lainnya.
English Abstract
Electric power companies in any countries of the world have experienced a lot of progress. State Electricity Company in Indonesia (known as PLN), as the Indonesian state-owned electricity company also has undergone change quite rapidly. The needs of the growing electrical load causes PLN to improve the efficiency of the electric power system. However to analyze the currenly problems of the electric power system is very difficult if carried out using traditional methods that have been complex because of the system, particularly on issues of stability, reliability, and power system planning. The purpose of this paper is to evaluate the probabilistic transient stability in the power system. The stability discussed in this research is the stability rotor angle because the influence of the rotor angle stability is quite large. The uncertainty of working time relays and load values of the electrical network system becomes an important key in the evaluation of the stability of the power system in probability. Problems in the evaluation of the stability of the power system here is how the stability of the system in the event of interference three phase to ground, how the critical clearing time on the line, and the line where the location of the most vulnerable in the event of disruption. To evaluate the amount of uncertainty in the analysis of the stability, it needs an additional method other than the method of transient stability as usual, by adding a simulation method Monte-Carlo. Monte-Carlo simulation method is basically to collect and analyze samples of data based on statistical experiments. In this simulation will be performed by randomly number generating the variable working time relays and electrical loads. Thus the expected results of the analysis will be closer to the actual conditions in which these variables change over time. In this simulation, it is assumed disconnection time in the event of disruption of critical generator three-phase short circuit. Simulations will be performed by MATLAB program. As for the expected outcomes of the study transient analysis is to locate the weakest line in electric power system. Model grid systems used for transient stability analysis is the model of the electric power system of Java-Bali 500 kV. The conclusion of this paper is the system still in good condition because the angle of the rotor remains stable when the simulation is done in accordance with the regulations contained in the electrical grid, 2007. For the other conclusion, it is proved that the line number 6, which is the line that connects the bus 5 with bus 8, is the most vulnerable line in the event of disruption of 3 phase to ground compared to other lines.
Item Type: | Thesis (Sarjana) |
---|---|
Identification Number: | SKR/FT/2015/654/ 051506833 |
Subjects: | 600 Technology (Applied sciences) > 621 Applied physics > 621.3 Electrical, magnetic, optical, communications, computer engineering; electronics, lighting |
Divisions: | Fakultas Teknik > Teknik Elektro |
Depositing User: | Kustati |
Date Deposited: | 26 Oct 2015 15:08 |
Last Modified: | 26 Oct 2015 15:08 |
URI: | http://repository.ub.ac.id/id/eprint/143786 |
Actions (login required)
View Item |