Perencanaan Jadwal Perawatan Preventif Berbasis Keandalan Untuk Meningkatkan Availability Mesin Kertas (Studi Kasus: PT. Kertas Leces (Persero))

Budiyanti, Vivit Eka (2014) Perencanaan Jadwal Perawatan Preventif Berbasis Keandalan Untuk Meningkatkan Availability Mesin Kertas (Studi Kasus: PT. Kertas Leces (Persero)). Sarjana thesis, Universitas Brawijaya.

Abstract

PT. Kertas Leces (Persero) adalah perusahaan Badan Usaha Milik Negara (BUMN) yang memproduksi berbagai jenis kertas. Proses produksi di perusahaan tidak selalu berjalan lancar karena adanya losses time yang menyebabkan availability mesin berkurang. Salah satu penyebab losses time adalah kerusakan mesin. Perusahaan memiliki 5 mesin kertas, dan mesin kertas 3 adalah yang paling banyak mengalami kerusakan karena perubahan fungsi produksi yang diterapkan. Antisipasi losses time yang dilakukan oleh perusahaan masih melebihi batas yang tercantum dalam Rencana Kinerja Anggaran Perusahaan (RKAP) sehingga ada indikasi perusahaan mengalami kerugian. Adanya losses time dapat mengganggu keberlanjutan suatu proses produksi dan untuk mengatasinya diperlukan keandalan mesin. Keandalan mesin dapat dicapai dengan melakukan perawatan mesin, terlebih dengan perawatan yang terjadwal. Penelitian ini bertujuan untuk mengetahui basic event penyebab losses time , mengetahui komponen kritis dan mendapatkan interval waktu perawatan komponen sehingga dapat disusun jadwal perawatan (preventif) rekomendasi yang memberikan peningkatan availability mesin. Metode yang digunakan dalam penelitian ini adalah Fault Tree Analysis (FTA). Hasil FTA memberikan data awal yang diperlukan untuk menyusun jadwal perawatan, yaitu basic event beserta komponennya dan probabilitas tiap event. Dari probabilitas event (kerusakan komponen) kemudian dapat diperoleh nilai keandalan komponen dan interval waktu perawatan komponen. Langkah berikutnya adalah melakukan analisis untuk mendapatkan frekuensi penggantian dan perbaikan komponen yang akan digunakan untuk menyusun jadwal inisial perawatan komponen. Beberapa perubahan dilakukan pada jadwal inisial perawatan hingga didapat jadwal perawatan (preventif) yang direkomendasikan. Hasil FTA menunjukkan ada 32 basic event yang menyebabkan losses time di mesin kertas 3. Sedangkan komponen mesin kertas yang paling kritis secara keseluruhan adalah HSM Roll (nilai keandalan 93,86%). Namun bila dilihat tiap part, maka Stock Preparation Part merupakan part terkritis (nilai keandalan 88,64%) dengan komponen kritisnya adalah Vertical Screen (nilai keandalan 95,4%). Untuk interval waktu perawatan komponen bervariasi, mulai dari 20 hari (1 komponen), 20-30 hari (1 komponen), 40 hari (1 komponen), 50 hari (3 komponen), 100 hari (3 komponen), 140 hari (6 komponen), 280 hari (1 komponen), 300 hari (12 komponen), 320 hari (15 komponen) dan 330 hari (8 komponen). Dan yang terakhir, jadwal perawatan preventif yang direkomendasikan menunjukkan peningkatan availability mesin sebesar 35 hari. Oleh karena itu, diusulkan kepada perusahaan untuk melakukan perawatan preventif secara terjadwal dengan menggunakan FTA atau metode lain yang sesuai.

English Abstract

PT. Kertas Leces (Persero) is a government-owned corporation company which produces many types of paper. In company, the production process did not always smoothly because losses time reduce machine availability. The losses time caused by machine failure. The company has 5 paper machines, and Paper Machine 3 is the most damage due to changes in applied production function. The losses time anticipation taken by company still exceed the limit stated in Company Bussines Plan (CBP), so there is an indication the company suffered losses. The existence of losses time can interfere sustainability of production process, and to overcome needed a machine reliability. Machine reliability can be achieved by performing machine maintenance, especially with scheduled maintenance. This study aims to knowing the basic event which causes losses time, knowing the critical components and get the interval of component maintenance, so can be arranged recommendation of (preventive) maintenance schedule that provides enhanced machine availability. This study uses Fault Tree Analysis (FTA) method. FTA’s result provide required preliminary data for maintenance scheduling, such as basic events and its components and the probability of each event. From the probability of event (component failure) then be obtained value of component reliability and component maintenance intervals. Next step is doing an analysis to obtain frequency of components replacement and repair that will be used to arrange initial schedule of component maintenance. Several changes of maintenance initial schedule were made to obtain (preventive) maintenance schedule are recommended. FTA’s result inidicate that losses time in Paper Machine 3 caused by 32 basic events. The critical component on the whole Paper Machine 3 is HSM Roll (value of reliability 93,86%). But when viewed each part, Stock Preparation Part is the most critical part (value of reliability 88,64%) with the critical component is Vertical Screen (value of reliability 95,4%). For component maintenance intervals varied, ranging from 20 days (1 component), 20-30 days (1 component), 40 days (1 component), 50 days (3 components), 100 days (3 components), 140 days (6 components), 280 days (1 component), 300 days (12 components), 320 days (15 components) and 330 days (8 components). And lastly, the recommended preventive maintenance schedule shows an increase machine availability by 35 days. Therefore, it is proposed to the company to perform scheduled preventive maintenance using FTA or other methods are appropriate.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2014/743/051500151
Subjects: 600 Technology (Applied sciences) > 670 Manufacturing
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Hasbi
Date Deposited: 14 Jan 2015 10:54
Last Modified: 23 Dec 2021 03:27
URI: http://repository.ub.ac.id/id/eprint/143079
[thumbnail of 2._Kata_Pengantar,_Daftar-daftar_&_Ringkasan.pdf]
Preview
Text
2._Kata_Pengantar,_Daftar-daftar_&_Ringkasan.pdf

Download (1MB) | Preview
[thumbnail of 4._Daftar_Pustaka_&_Lampiran.pdf]
Preview
Text
4._Daftar_Pustaka_&_Lampiran.pdf

Download (2MB) | Preview
[thumbnail of 1._Cover,_Lembar_Persetujuan_&_Lembar_Pengesahan.pdf]
Preview
Text
1._Cover,_Lembar_Persetujuan_&_Lembar_Pengesahan.pdf

Download (4MB) | Preview
[thumbnail of 3._Bab_I_-_V.pdf]
Preview
Text
3._Bab_I_-_V.pdf

Download (3MB) | Preview

Actions (login required)

View Item View Item