Pengendalian Persediaan Suku Cadang Mesin Produksi Pada Departemen Maintenance Dengan Pendekatan Periodic Review (R, S, S) System (Studi Kasus Di Pt. Adi Putro Wirasejati)

Purubaya, RidhaWirardy (2014) Pengendalian Persediaan Suku Cadang Mesin Produksi Pada Departemen Maintenance Dengan Pendekatan Periodic Review (R, S, S) System (Studi Kasus Di Pt. Adi Putro Wirasejati). Sarjana thesis, Universitas Brawijaya.

Abstract

PT. Adi Putro Wirasejati (PT. APW) merupakan salah satu perusahaan karoseri di Indonesia yang bergerak dalam bidang pembentukan body kendaraan bus dan minibus. Permasalahan terjadi pada PT. APW adalah keterlambatan waktu perbaikan kerusakan mesin dan ketidaksesuaian jadwal perawatan mesin karena tidak adanya perencanaan dan prakiraan data historis. Hal ini menyebabkan kebutuhan replacement tidak dapat dipenuhi. Suku cadang dengan kecepatan pemakaian yang paling besar dalam penelitian ini adalah Skun Kabel SCG-5, Seal Regulator CO2, Bearing 608 NTN, Skun 2,5 mm B, dan O Ring 39453. Untuk mengatasi permasalahan tersebut maka dibutuhkan usulan mengenai kebijakan persediaan suku cadang dengan mempertimbangkan service level yang tinggi dengan biaya yang proporsional. Metode yang digunakan dalam penelitian ini untuk mengendalikan persediaan suku cadang adalah pendekatan periodic review (R, s, S) system. Penelitian dimulai dengan melakukan perhitungan persediaan dan pemesanan suku cadang dengan kebijakan existing. Langkah selanjutnya adalah melakukan simulasi perhitungan persediaan dan pemesanan suku cadang dengan pendekatan (R, s, S) system untuk mendapatkan total biaya dan nilai service level. Simulasi perhitungan persediaan dan pemesanan suku cadang terdiri atas generate random data dan setting parameter input untuk mendapatkan nilai ROP dan maximum stock sehingga didapatkan rentang hasil dari total biaya dan nilai service level dari kelima suku cadang yang dibahas. Setelah melakukan perbandingan antara kebijakan existing dan kebijakan yang diusulkan, langkah yang dilakukan adalah mengembangkan prototype sistem informasi manajemen persediaan suku cadang mesin produksi. Hasil dari penelitian ini menunjukkan bahwa kebijakan dengan pendekatan (R, s, S) system dapat dipertimbangkan oleh perusahaan sebagai kebijakan yang lebih baik daripada kebijakan existing karena terjadi peningkatan nilai service level dengan penurunan total biaya sebesar 40,52% - 45,39% untuk Skun Kabel SCG-5, penurunan total biaya sebesar 59,21% - 60,55% untuk Seal Regulator CO2, peningkatan total biaya sebesar 15,17% - 68,13% untuk Bearing 608 NTN, penurunan total biaya sebesar 59,17% - 61,3% untuk Skun 2,5 mm B, dan peningkatan total biaya sebesar 0% - 34,64% atau penurunan total biaya sebesar 0% - 2,26% untuk O Ring 39453. Selain itu, hasil yang diperoleh dari penelitian ini adalah prototype dari sistem informasi manajemen persediaan suku cadang mesin produksi berbasis periodic review (R, s, S) system yang menunjang kegiatan dan kebijakan mengenai pengendalian persediaan suku cadang pada departemen maintenance PT. APW.

English Abstract

PT. Adi Putro Wirasejati (PT. APW) can be classified as automotive industry that focuses on the body shaping of the bus. Preliminary investigation found that maintenance department does not have a good planning and forecasting of spareparts inventory. The tardiness of machine’s maintenance and inappropriate of machine’s maintenance schedule were found to be the weakness of the company along with the availability of the spareparts. A good planning and forecasting of spareparts inventory for the maintenance department is needed to fulfilled the replacement’s needs. Spareparts with the greatest consumption rate in this research are Skun Kabel SCG-5, Seal Regulator CO2, Bearing 608 NTN, Skun 2.5 mm B, and O Ring 39453. To solve that problem, spareparts inventory policies is proposed to get higher service level with proportional cost. The method used in this research to solve the problem was periodic review (R,s,S) system approach. This research was began by calculating inventory and determining spareparts procurement by using existing policy. The next step was to calculating inventory and determining spareparts procurement simulation by using (R,s,S) system approach to get total cost and value of service level. Simulation inventory and spareparts procurement was conducted by generating random data and setting parameter input such as value of ROP and maximum stock to obtain the range of total cost and service level from five spareparts. After comparing the result of existing policy and the proposed policy, the next step was prototype development of spareparts inventory management information system. The result of this research show that the policy (R,s,S) system approach can be considered as a better policy than the existing policy because it can increase the value of service level with a reduction of cost 40.52%-45.39% for Skun Kabel SCG-5, a reduction of cost for Seal Regulator CO2 is 59.21%-60.55%, an increased cost for Bearing 608 NTN is 15.17%-68.13%, a reduction of cost for Skun 2.5 mm B is 59.17%-61.3%, and an increased cost 0%-34.64% or a reduction of cost 0%-2.26% for O Ring 39453. In addition of the results, the prototype of spareparts inventory management information system was built by periodic review (R,s,S) system database. It has important features to support the activity and policy of the spareparts inventory control of PT. APW maintenance department.

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2014/687/051407888
Subjects: 600 Technology (Applied sciences) > 670 Manufacturing
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Budi Wahyono Wahyono
Date Deposited: 26 Nov 2014 10:47
Last Modified: 21 Oct 2021 15:30
URI: http://repository.ub.ac.id/id/eprint/143015
[thumbnail of SKRIPSI_Ridha_W.P.-105060701111011.pdf]
Preview
Text
SKRIPSI_Ridha_W.P.-105060701111011.pdf

Download (7MB) | Preview
[thumbnail of LEMBAR_PENGESAHAN.pdf]
Preview
Text
LEMBAR_PENGESAHAN.pdf

Download (2MB) | Preview

Actions (login required)

View Item View Item