Aplikasi Zhong Xing Hy21 Untuk Analisa Keruntuhan Bendungan Muka Kuning, Batam

Aniskurlillah, SonaGusti (2014) Aplikasi Zhong Xing Hy21 Untuk Analisa Keruntuhan Bendungan Muka Kuning, Batam. Sarjana thesis, Universitas Brawijaya.

Abstract

Bendungan, selain membawa manfaat yang sangat besar, juga merupakan bangunan yang berisiko tinggi. Didalam Peraturan Pemerintah Nomor 39 tahun 2010 tentang Bendungan disebutkan bahwa setiap bendungan harus dilengkapi dengan dokumen rencana tindak darurat dalam rangka antisipasi penyelamatan jiwa dan harta benda apabila terjadi keruntuhan bendungan. Simulasi analisa keruntuhan bendungan pada penelitian ini menggunakan program Zhong Xing HY21. Disini, skenario keruntuhan terjadi akibat overtopping dan piping, sementara debit inflow yang digunakan adalah Probability Maximum Flood (PMF). Dengan bantuan program tersebut, dapat diketahui hidrograf outflow banjir dan peta genangan banjir yang akan terjadi jika bendungan mengalami keruntuhan. Hubungan antara jarak dan elevasi muka air banjir serta jarak dan waktu puncak banjir dapat digambarkan dengan persamaan empiris regresi yang didasari oleh hasil running program Zhong Xing HY21. Penelitian ini menghasilkan angka debit inflow maksimum sebesar 463,60 m3/detik dan debit outflow maksimum 3454,88 m3/detik yang terjadi pada saat skenario overtopping. Selain itu, dampak genangan banjir terluas adalah 18,94 km2, waktu datang banjir tercepat adalah 0,23 jam, waktu puncak banjir tercepat adalah 1,17 jam, serta waktu surut banjir terlama adalah 24 jam. Kemudian, hubungan antara jarak–waktu puncak banjir digambarkan dengan persamaan y = 7E-12x4 - 5E-08x3 + 9E-05x2 - 0.0353x + 70.091 (y = waktu puncak dalam menit, x= jarak dalam meter) dan hubungan antara jarak–elevasi muka air banjir digambarkan dengan persamaan y = 2E-12x4 - 1E-08x3 + 3E-05x2 - 0.028x + 26.709 (y = elevasi muka air banjir maksimal dalam meter, x= jarak dalam meter). Dari peta genangan banjir, ditentukan jalur dan lokasi evakuasi pada tiga titik, yaitu Kampung Aceh, Kompleks Batamindo, dan Kompleks Panbil Industri yang ketiganya berada di Desa Muka Kuning, Kecamatan Sungai Beduk, Batam.

English Abstract

The dam construction has big advantages for human life, but it also comes with high risk. In Government Ordinance Number 37, 2010 about dam has been noted that each dam should be equipped with emergency action plan document.This regulation purpose to anticipate human safety and property rescue if the dam collapse occurred. In this research, dam breaks simulation was using Zhong Xing HY21 program with two scenarios i.e. overtopping and piping. Inflow which used in simulation is Probability Maximum Flood (PMF) discharge. The program helps us to know about flood outflow hydrograph and flood inundation maps caused by dam breaks. The relation between distance and flood water level, also distance and time peaks shown by empirical regression equation. It based on running result of Zhong Xing HY21 program. The result of this research obtained maximum inflow dischargeis 463,60 m3/second and maximum outflow discharge is 3454,88 m3/second that occurs during overtopping scenarios. The widest flood impacts reach 18,94 km2 and the fastest flood arrival timeis 0,23 hours. Furthermore, the fastest flood peaktime is 1,17 hours and the longest flood recede time is 24 hours. Then, the relation of distance and time peaks was described by equation y = 7E-12x4 - 5E-08x3 + 9E-05x2 - 0.0353x + 70.091(y = time peaks in minutes, x = distance in meters). The relation between distance and flood water level was described by equation y = 2E-12x4 - 1E-08x3 + 3E-05x2 - 0.028x + 26.709 (y = flood water level in meters, x = distance in meters). Based on flood inundation maps, it determined evacuation route and location at three points, i.e. Kampung Aceh, Kompleks Batamindo, and Kompleks Panbil Industri. These points are located in Muka Kuning Village, Sei Beduk sub-district, Batam

Item Type: Thesis (Sarjana)
Identification Number: SKR/FT/2014/126/051402727
Subjects: 600 Technology (Applied sciences) > 627 Hydraulic engineering > 627.5 Reclamations, Irrigation, related topics > 627.52 Irrigation
Divisions: Fakultas Teknik > Teknik Pengairan
Depositing User: Hasbi
Date Deposited: 13 May 2014 11:15
Last Modified: 13 May 2014 11:15
URI: http://repository.ub.ac.id/id/eprint/142392
Full text not available from this repository.

Actions (login required)

View Item View Item